Laserfiche WebLink
ROAD A D BRID GE <br /> ROW REVIE COMMENTS <br /> PROJECT: Sunrise Properties of Zephyrhill Inc– Fort King Rd - Driveway Conn <br /> Memo# RBRW14-218 <br /> PROJECT NO.: ROW 47 1 — �.e�ul,� � DATE 10120/14 <br /> BY: DiAnna Rawlei h ENGINEER: <br /> Public Works is requesting t foilo ing condit ons be required for the construction and <br /> maintenance of: <br /> NUMBER REFERENCE COMMENTS <br /> �• Drivewa Conn No track pe eq ipment will be allowed on any as haltic or <br /> v tY P <br /> concrete surfac . <br /> - <br /> � 2• All lines within t, e right=of-way will be placed a minimum of 36" � <br /> under the roadw y and a minimum of 30" under non-traffic bearing <br /> surfaces. <br /> 3• All cable lines w' hin the rights-of-way shall be clearly marked at <br />' regular intervals <br /> 4• Erosion and silt ontrol devices will be in place during the <br /> construction an restoration phase at all times. After proper and <br /> normal stabilizat on has be,en established, control devices may be <br /> removed. <br /> 5• All traffic control devices, i.e:: Warning/Construction type signs will <br /> comply with F.D O.T. standards during the construction phase. <br /> 6• All disturbed ar s will be compacted and replaced with sod. <br /> 7� All backfill sub- se, base and asphalt surFace.restoration will <br /> comply with the. atest F.D.O.T. standards or as otherwise <br /> approved by the County Engineer or his designee. <br />' , �, <br /> ,����,�: <br /> �t��. <br /> �� � 20�°� '�.`1 <br /> .,,, p��[ �� � ' <br /> ��.. . ���//(�/r l.�� <br /> 1\1 ..�'IL!.,.�•�"i^^ +"� <br /> 1��.. <br />