Laserfiche WebLink
EE�G: Asbestos Surve October 7 2014 <br /> SECTI N 2.0 <br /> BUILDING D SCRIPTION <br /> The structure was observed to be constructed f concrete block and wood. Interior walls were <br /> finished with drywall. Ceilings were finished wit drop-in ceiling tile panels and limited areas of <br /> drywall. Floors were finished with vinyl floor til or linoleum. The HVAC duct was uninsulated <br /> sheet metal, fiberglass-insulated sheet metal, or fiberglass flex-duct. - <br /> HUPP ZHILLS GALL BLVD SURVEY REPORT -� <br />