Laserfiche WebLink
EE�G: Asbestos Suroe October 7 2014 <br /> SECTI N 5.0 <br /> RECOMME DATIONS <br /> 5.1 RECOMMENDATIONS FOR REGULAT D ACM (RACM) <br /> None of the surveyed materials were identified a RACM. <br /> 5.2 RECOMMENDATIONS FOR CATEGO I NONFRIABLE ACM <br /> None of the surveyed materials were identified Category I Nonfriable ACM. <br /> 5.3 RECOMMENDATIONS FOR CATEGO II NONFRIABLE ACM <br /> None of the surveyed materials were identified s Category II Nonfriable ACM. <br /> 5.4 GENERAL RECOMMENDATIONS <br /> . If other specific areas at this location are to be impacted during planned <br /> renovations or demolition, an as estos survey of these areas will be required. <br /> • Suspect materials discovered iter this inspection should be sampled and <br /> analyzed to determine asbestos ntent and to initiate appropriate responses. <br /> • Prior to demolition activities, the property should be inspected for all potentially <br /> hazardous materials. The iden ified materials should be removed from the <br /> property, and properly disposed of in accordance with federal, state, and local <br /> regulations. <br /> • This report should,.be updated i demolition of buildings covered in this survey <br /> does not take place within six m nths of the date of this survey, i.e. by April 2015 <br /> 5.5 SPECIFIC RECOMMENDATIONS <br /> Based on the results of this demolition survey, EE&G has the following specific <br /> recommendations: <br /> . Demolition activities shall be conducted in accordance with 40 CFR 61 <br /> (NESHAP). It is recommended t at contractor personnel receive a copy the EPA <br /> guidance document on demolitio practices under NESHAP. <br /> . EE&G recommends a walk-th ough of the property with the owner/owner's <br /> representative and the dem lition contractor prior to commencement of <br /> demolition activities. The dem lition contractor should be provided the Pre- <br /> Demolition Survey Report, and hould inspect the property for unidentified ACM. <br /> � Any unidentified suspect ACM s ould be sampled and analyzed prior to the start <br /> of demolition activities. <br /> HUPP ZHILLS GALL BLVD SURVEY REPORT -'I <br />