Laserfiche WebLink
� <br />� <br /> Now,therefore, it is agreed by and between t e parties herein, as follows: <br /> 1. Carr Contracting Services Inc. shall provid all material, equipment, labor services, <br /> and any other items necessary to fully compl te the work set forth in Attachxnent A- ( <br /> Contractors Proposal). Carr Contracting Se ices Inc. shall at it's own expense, secure all <br /> insurances, furnish all labor, material, tools, quipment, machinery, scaffolding, cartage, <br /> and provide all other things and personnel ne essary for the full and diligent prosecution <br /> thereof, all in compliance with applicable sta utes, ordinances and regulations, and in a <br /> first class workmanlike manner, and in strict ccordance with the requirements of the <br /> Construction Contract, as well as the directio of the Owner, and to the satisfaction of the <br /> Owner, <br /> (Note): Any change directives by Owner ab ve and beyond the outlined scope of work, <br /> that increases the value of original contract s all be agreed upon in writing by both <br />� parties, and shall be considered a " Change rder ", and original contract sha11 be <br /> modified to reflect as such. <br /> 2. Carr Contracting Services Inc. acknowled es that no representation as to the work <br /> have been made by the Owner, or anyone on it's behalf, except as in this contract <br /> , expressly set forth, and the Contractor warr ts and represents that it has familiarized <br /> itself with existing conditions and the chaxac er of the operations to be carried on under <br /> the Construction Contract, and that it fully u derstands the facilities, difficulties and <br /> restrictions attending the execution of the w rk under this Contract;the Contractor fully <br /> understands the requirements of the various overnmental agencies, departments, and <br /> bureaus having jurisdiction, and from it's o investigations, has satisfied itself as to the <br /> nature and location of the work, all local co itions, and all matters which may affect the <br /> work or it's performance. <br /> 3. Carr Contracting Services Inc. shall be re onsible for supervision, and coordination of <br /> it's trades, and all actions reasonably require to complete the work, even if not shown on <br /> the plans, but can be reasonably inferred. <br /> 4. Carr Contracting Services Inc. shall prov'de Engineered drawings and submittal letters <br /> by the Engineer of Record which may be re uired to fully complete the scope of work. <br /> 5. Carr Contracting Services Inc. shall be lia le for any damages to adjacent surfaces <br /> caused by it's work, either accidentally or t ough negligence, Contractor is not <br />' responsible for damages caused by others. <br /> 6. Carr Contracting Services Inc. agrees to a ide by all OSHA safety guidelines for the <br /> type of work being performed. <br />