My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
14-15832
Zephyrhills
>
Building Department
>
Permits
>
2014
>
14-15832
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 9:54:16 AM
Creation date
11/9/2015 9:54:16 AM
Metadata
Fields
Template:
Building Department
Company Name
SILVER OAKS
Building Department - Doc Type
Permit
Permit #
14-15832
Building Department - Name
KIRBACH,JO ANN
Address
6535 BRENTWOOD DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> { <br /> 1�' <br /> � <br /> �Gb���� �� ,�"/ <br /> State of Florida Licen e#CCC1326166 and# CBC058155 <br /> 30427 Commerce Drive, San Antonio,FL 33576 <br /> Phone(813) 782-9080/Fax �352) 668-4803/www.neumannroofs.com <br /> 15. All estimates/contracts are subject tb Building Department approval in the appropriate <br /> county/city. <br /> 16. Payment schedule: 1/3 down, 1/3 u�on delivery of material, 1/3 upon completion. <br /> Unit Pricin�Schedule for Unforeseen Conditions: <br /> 1. Replace any rotted or damaged dec ing $65.00 per sheet. (2 sheets at no cost provided with <br /> reroof by Neumann Roofing). <br /> 2. Replace any rotted fascia$6.50 per lineal ft. <br /> 3. If there are multiple layers of shing es on the existing roof; we will add$30.00 per square <br /> per layer of roofing to cover the tear off cost. <br /> 1�1eu�aaan Roo#in�'s �ommatmeaat to Quality: <br /> • All work will be su ervised b ro'�ct mana ers to ensure ualit work is reformed <br /> p YP J g q Y P <br /> according to our proposed contract.� <br /> • All work will be completed in a timely manner, excluding acts of nature beyond our control. <br /> • All carpentry work will be performed in conjunction with roofing work, in a timely manner <br /> following general workmanship quality. <br /> • All work will be completed by skilled and knowledgeable craftsman to ensure production of <br /> high quality of work. <br /> • The job-site will be kept free of debris throughout the duration of the project. <br /> - o The perimeter-of the project area-wia l-be-swept with-magnets to-piek up-any-loose-nails; -- — <br /> staples, or other various scrap sheet etal components. <br /> • Any existing gutters will be cleane of all organic and roof related debris prior to project <br /> close-out. <br /> • Neumann Roofing, LLC is fully insured with workman compensation and general liability <br /> insurance. <br /> m <br /> '� ► <br /> �' Mas�e"rElite <br /> � <br /> ..�.,., <br /> FL License#: CCC1326166 GAF License#:ME20454 <br />
The URL can be used to link to this page
Your browser does not support the video tag.