,.., '
<br /> �;
<br /> TRII�IIIY f ERD
<br /> APPENDIX 1:ATTACHMENT REQUIREMENTS FOR WIND UPLIFT RESISTANCE
<br /> Table Deck Application Type Description Page
<br /> 1A Wood New,Reroof(Tear-Offl,Recover C Mechanically Attached Insulation,Bonded Roof Cover q
<br /> 1B Wood New,Reroof(Tear-Offl,Recover D-1 Insulated,Mechanically Attached Roof Cover q
<br /> iC Wood New,Reroof(Tear-Offl,Recover D3 Non-Insulated,Mechanically Attached Base Sheet,Bonded Roof Cover 5
<br /> iD Wood New,Reroof(Tear-Offl,Recover E-1 Non-Insulated,Mechanically Attached Roof Cover 5
<br /> lE Wood New,Reroof(Tear-OffJ,Recover E-2 Non-Insulated,Mechanically Attached Base Sheet,Bonded Roof Cover 5
<br /> 2A Steel or Conc. New,Reroof(Tear-Offl,Recover B Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 6-9
<br /> 2B Steel or Conc. New,Reroof(Tear-Offl,Recover C-1 Mechanically Attached Insulation,Bonded Roof Cover 10-14
<br /> 2C Steel New,Reroof(Tear-Offl,Recover C-2 MechanicallyAttached Insulation,Plate-Bonded Roof Cover 15
<br /> 2D Steel or Conc. New,Reroof(Tear-Offl,Recover D-1 Insulated,Mechanicaliy Attached Roof Cover(Stress Plates) 16-18
<br /> 2E Steel or Conc. New,Reroof(Tear-Offl,Recover D-2 Insulated,Mechanically Attached Roof Cover(RUSS Strips) 19
<br /> 3A Concrete New,Reroof(Tear-Offl A-lA Bonded Insulation,Bonded Roof Cover 20-23
<br /> 3B Concrete New,Reroof(Tear-Of� F Non-Insulated,Bonded Roof Cover Zq
<br /> ew,�e�Ob{'(Te�Q{ - onde nsu a ion, on e o0 over 25
<br /> 4B LWIC New,Reroof(Tear-Offl A-2 Mech.Attached Anchor Sheet,Bonded insulation,Bonded Roof Cover 25
<br /> 4C-1 LWIC over Steel New,Reroof(Tear-Offl F Non-Insulated,Bonded Roof Cover 26-27
<br />-- - ---4G2 LWGover-Conc. New,-Reroof-(-Tear-Offl F Non-Insulated,-Bonded-Roof-Gover 2g
<br /> SA CWF New,Reroof(Tear-Offl A-1 Bonded Insulation,Bonded Roof Cover 29
<br /> 6A Gypsum Reroof(Tear-Offl A-1 Bonded Insulation,Bonded Roof Cover 30
<br /> 6B Gypsum Reroof(Tear-Offl F Non-Insulated,Bonded Roof Cover 30
<br /> 7A Various Recover A-1 Bonded Insulation,Bonded Roof Cover 31-32
<br /> 78 Steel Recover C-2 Mechanically Attached Insulation,Plate-Bonded Roof Cover 33
<br /> 7C Steel Recover D-1 Insulated,Mechanically Attached Roof Cover 33-34
<br /> 7D Various Recover E-1 Non-Insulated,Mechanically Attached Roof Cover 35
<br /> 7E Various Recover F Non-Insulated,Bonded Roof Cover 36
<br /> The following notes apply to the systems outiined herein:
<br /> 1. The roof system evaluation herein pertains to above-deck roof components. Roof decks and structural members shall be in accordance with FBC requirements to the satisfaction of the AHJ. Load resistance of the
<br /> roof deck shall be documented through proper codified and/or FBC Approval documentation.
<br /> 2. Unless otherwise noted,fasteners and stress plates for insulation attachment shall be as follows. Fasteners shall be of sufficient length for the following engagements:
<br /> ➢ Wood Deck: HPV Fastener with HPV Insulation Fastening Plate. Minimum 1-inch wood penetration.
<br /> ➢ Steel Deck: HPV Fastener with HPV Insulation Fastening Plate. Minimum'/<-inch steel penetration,engage the top flute of the steel deck.
<br /> ➢ Concrete Deck: MP 14-10 Concrete Fastener,CD-10 Concrete Fastener or MP Concrete Spike with HPV Insulation Fastening Plate.Minimum 1-inch embedment. Fasteners installed with a pilot hole in
<br /> accordance with the fastener manufacturer's published installation instructions.
<br /> 3. Unless otherwise noted,insulation may be any one layer or combination of polyisocyanurate,polystyrene,fiberboard,perlite and/or gypsum-based insulation board that meets the QA requirements of F.A.C.Rule 9N-
<br /> 3 and is documented as meeting FBC 1505.1 and,for foam plastic,FBC 2603.4.1 or 2603.6,when installed with the roof cover
<br /> Exterior Research and Design,LLC.d/b/a Trinity� ERD Evaluation Report C35230.11.10-RS for FL14207-R6
<br /> Certificate of Authorization#9503 Revision 5:06/19/2014
<br /> Prepared by: Robert Nieminen,PE-59166 Appendix 1,Page 1 of 36
<br />
|