Laserfiche WebLink
Project:FMC <br /> Title:FMC Stadium Drive MOB <br /> Type:Oftice <br /> EA File:FL TAMPA INTERNATIONAL P.tm3 <br /> Building End Uses <br /> 1)Proposed 2)Baseline <br /> Total 335.90 418.10 <br /> $5,235 $6,554 <br /> ELECTRICITY(MBtulkWhl$) 335.90 418.10 <br />' 98411 122514 <br /> $5,235 $6,554 <br /> AREA LIGHTS �3.so sz.so <br /> 21611 24257 <br /> $1,1 SO $1,298 <br /> MISC EQUIPMT 1os.00 ios.00 <br /> 31646 31646 <br /> i $1,684 $1,693 <br /> PUMPS 8�MISC o.10 0.20 <br /> z� s2 <br /> I� $1 $3 <br /> SPACE COOL 116.40 119.40 <br /> 34102 34997 <br /> $1,814 $1,872 <br /> SPACE HEAT o.so a.10 <br /> 236 1209 <br /> $l3 $65 <br /> VENT FANS 36.so 103.60 <br /> 10789 30353 <br /> $574 $1,624 <br /> Credits Applied:None PASSES <br /> Passing Criteria=5244 <br /> Design(including any credits)=5235 ' <br /> I'�I Passing requires Proposed Building co t to be at most 80% of <br /> Baseline cost.This Proposed Building i at 79.9% <br /> EnergyGauge Summit0 FIa/C m-2010.Section 506.4 Compliant Software.Effective Date:March 15,2012 <br /> 12/22/2014 Page 4 of 9 <br /> ' I <br />