Laserfiche WebLink
' U . <br /> � ' Procedure r Lot tmpravement Requests <br /> (Please refer o#he "Rules end Regulations"} <br /> 1. 1.Ali requests are to go to the.Ch rman of the Lo# lmpravement Committee, You can hand <br /> deliver i#to the Chairman or place t in the EPPGA mail box outside the EPPt)A C7ffice. The <br /> Chairman wiii present it to the �ot mpravement Committee for their review. <br /> 2. An re uest which is N T #illed out ro rl which incfudes, <br /> complete de#ai�edlsketc #o include #aatprint, setbacks, #ront <br /> elevat�c►n, back eleva#ia , ieft & right elevatian and must include <br /> all sizes and lacations o windows and doors, wi�h length, width <br /> and heigh# of #he averall structure inciuding colar of siding, trim, <br /> shutters, doars and pav rs, (i# applicable }, wili be returned to the <br /> a licant withaut an ac#i n bein taken. <br /> 3. The Committee wiH review ali requ sts and visit the site of the request as necessary. <br /> 4. After the Committee has recomme ded appravai or denial of the request, it wil! be presented <br /> to the Board of Directors for their a �proval or denial. The fina! decision of the Board to approve <br /> or deny the request must be made y at ieast three (3) directors, one ofi which must be the <br /> Board iiaison ofi the Lot lmproveme # Gommittee, if available. <br /> � <br /> 5. There wili be NO more one day approvals or last minutte aoprouels. Request wilt take 7 to 14 <br /> days for appropria#e review and can�sideratian, thus giving the Committee and Board members <br /> , time to review and consider the req �est in a thorough manner. <br /> '�, 6. The ariginat request witi be dated a d signed as approved or denied, and after being copied <br /> ; the origina! will go into to the rnem rs fite and the copy returned to the Lo#owner by the <br /> ', Board of Director tiaison or the Chai man of the committee. <br /> 7. The cammittee wiil foliow up on req ests to determine that the request as presented and <br /> approved is being adhered to. <br /> 8. No permit will be AGCEPTED FQR PPROVAL after Apri11 af each year. <br /> As the owner of Got# � -�' , i un� erstand the Lot improvement Commi#tee andlor the <br /> Bo�rd of Directors will en#er the praperty to follow the externa! progress of the constrvction ar <br /> improvemen#. as submitted on the Lot impr vement Request. <br /> � � { �v 2.� <br /> Lot Owner's Signature Date <br />