NOTIC�OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictians"
<br /> which may be more restrictive than County regulations. The undersigned assumes respansibili#y for compliance with any
<br /> applicable deed res#rictions.
<br /> UNLICENSED CONTRACTORS �1ND CCINTRACT�R i�ESPQN5181LlTIES: If the owner has hired a cantractor or
<br /> contrac#ors to undertake work, they may be required to be licensed in accordance with state and local regulatians. If the
<br /> contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation
<br /> under state iaw. if the owner or intended conEractor are unaertain as ta what licensing requirements may apply for the
<br /> intended wark, they are advised to cantac#the Pasco Caunty Building Inspection Division—Licensing Section at 727-847-
<br /> 80Q9. Furthermare, if the awner has hired a contractar or contractors, he is advised ta have the contracEor�s} sign
<br /> portions of the "conkractor Btock" of fhis application for which they will be respansible. If yau, as fhe owner sign as fhe
<br /> contractor, that may be an indication that he is not properly Ilcensed and is not entitled to permitting privileges in Pasco
<br /> County.
<br /> 7'RANSPORT'�►TIOfV IMPAC'TIUTILITIES IMPACT AND RESOURGE RECOVERY FEES: The undersigned unders#ands �
<br /> that Transpartatian Impact Fees and Recoutse Recovery Fees may apply to#he construction af new buildings; change of
<br /> use in existing buildings, or expansian of existing buildings, as specified in Pasco County Ordinance number $9-07 and
<br /> 90-07, as ame�ded. The undersigned also understands, that such fees, as may be due, will be identified at the time of
<br /> permitting. it is fu�ther unc3erstood that Transpor#ation (mpac# Fees and Resaurce Recovery Fees must be paid priar#o
<br /> receiving a '"certi�cate af occupancy" or final power release. If the project does not involve a certificate of occupancy or
<br /> final pawer release, the fees must be paid prior fo permit issuance. Furthermore, if Pasca County Wafer/Sewer Irrtpact
<br /> fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
<br /> CQNSTRUC'TI�N L1EN �.Ai�/(Chapter 713, �I�r�da Statutes, as arttended}: !f valuatian of work is$2,500.00 ar more, t
<br /> certify #hat I, the applicant, have been provided with a copy of the "Florida Construcfian Lien Law—Homeowner`s
<br /> Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
<br /> other#han the°owner", I certify thaf 1 have obtained a copy of the above described document and promise in good faith to
<br /> deliver it to the"owner" prior to commencement.
<br /> CONTRACTt}F2'SIOWNER'S AFFIDAVIT': 1 certify that all the information In#his appEicatiort is accurate and that all work
<br /> will be done in compliance with all applicable laws regulating construction, zoning and land develapment. Applicakion is
<br /> hereby made to obtain a permit to do work and installatian as indicated. ( certify that no wark or installation has
<br /> commenced prior to issuance of a permit and that ail work wi(I be perFormed to meet standards of a1( iaws regu(afing
<br /> construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. 1 also
<br /> certify thaf 1 understand that the regulafions of ather government agencies may apply to tfie intended work, and fhat it is
<br /> my responsibility to identify what actions I must take to be in campliance. 5uch.agencies include but are not limited to:
<br /> - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
<br /> Lands, WaterMlastewater Treatment.
<br /> - Sbuthwest Florida Vlfater iVlanagement Distric#-Wells, Cypress Bayheads, Wetland Areas, Altering
<br /> Wafercourses.
<br /> - Army Corps af Engineers-Seawalls, Docks, Navigable Waterways. �
<br /> - Deparfinent of Health & Rehabili#ative SetviceslEnvironmental Health Unit-Wells, V1lastewater Treatment,
<br /> Septic Tanks. ,
<br /> - US Environmental Protectian Rgsncy-Asbestas abatem�nt.
<br /> - Fede�al Avia#ion Authori#y-Runways. �
<br /> I understand that the fo!lawing restrictions apply to the use of fill:�
<br /> - Use of fiii is nof allowed in Fioad Zane"V�tanless expressly permitted.
<br /> - If the fill material is to be used in Flood Zone "N", it is understood that a drainage plan addressing a �
<br /> "campensa#ing voiume" witl be submitted at time of perrrtifting which is preparer! by a professional engineer
<br /> licensed by the State of Florida.
<br /> - If the fill makerial is to be used in Fload 2one "A° in connection with a permitted bui4ding ustng stem wall
<br /> construction, 1 cer#ify that fil(wiil be used on(y fo fifl the area within the sfem wali. �
<br /> - If fill material is to be used in any area, 1 certify that use of such fill will not adversely affect adjacent
<br /> properties. If use af frll is found ta adversely affect adjacent properties, the owner may be cited for vioiating
<br /> the conditions of the building permit issued under the attached permit applica#ion, far lots less than one (1)
<br /> acre which are elevated by fill, an engineered drainage plan is requlred,
<br /> If I am the AGENT FOR THE OWN�it, I promise in gaod faith to inform #he owner of the permitting conditions set forkh in
<br /> this a�davit priar to commencing construction. 1 understand that a separate permit may be required for electrica! work,
<br /> piumbing, signs, wells, poois, air conditioning, gas, or ofher instaliations not specificatly inciuded in the applicafion. A
<br /> permi# issued shall be canstrued to be a license #o proceed with the work and not as authority to violate, cancel, alter, or il
<br /> set aside any provisions�af the#echn'scal codes, nor shall issuance of a permit prevent fhe Building afficiaf from fhereafter
<br /> requiring a correctian of errors in plans, construction or violations of any codes. Every permit issued shall became invalid
<br /> unless the work autharized by such permi# �s commenced within six manths of permit issuance, or if work autharized by
<br /> the permit is suspended or abandoned for a periad of six (6) months after the fime the work is commenced. An extension
<br /> tT1�Y �?@ fBC�U@5t8t�, in writing, from the Building Official for a period not ta exceed ninety (90) days and wil! demonstrate
<br /> justifiable cause for the extension. If work ceases for ninefy(90)consecutive days, the job is considered abandaned.
<br /> WARNING T� OWNER: YOUR FAI�URE TO RIECQRD A NOTtCE UF CQMMENCEMENT IVIAY RESUi.T EN YOUR
<br /> PAYING TWICE POR IiYIPROV�nIIENTS TO YOUR PROPERTY. 1F YOU INTEND TO OBl'AIN FINANCING, CONSULT
<br /> l�llTN YOUR LENDER OR AN AT7'ORNEY BE�ORE RECORDING Y�UR NC?TICE O�COMMENCEl1flENT.
<br /> FLORIDA JURAT(F.S.117.03)
<br /> pWRtER QR AGENT CONTRACTOFt
<br /> Subscribed and sworn to(or aftirmed)before me this Subscribed and sworn to(or affirmed}before me this
<br /> by bY
<br /> Who islare personally known#o me or haslhave prodsaced Wha lslare personally Icnawn fo me or haslhave prodnced
<br /> as idenUfication. as identification.
<br /> Notary Public Notary Public
<br /> Commission No. Commission Na. •
<br /> �
<br /> Name of Notary typed,prfnted or stamped Name of Notary typed,printed or stamped
<br />� �
<br />
|