Laserfiche WebLink
NOTIC�OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictians" <br /> which may be more restrictive than County regulations. The undersigned assumes respansibili#y for compliance with any <br /> applicable deed res#rictions. <br /> UNLICENSED CONTRACTORS �1ND CCINTRACT�R i�ESPQN5181LlTIES: If the owner has hired a cantractor or <br /> contrac#ors to undertake work, they may be required to be licensed in accordance with state and local regulatians. If the <br /> contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation <br /> under state iaw. if the owner or intended conEractor are unaertain as ta what licensing requirements may apply for the <br /> intended wark, they are advised to cantac#the Pasco Caunty Building Inspection Division—Licensing Section at 727-847- <br /> 80Q9. Furthermare, if the awner has hired a contractar or contractors, he is advised ta have the contracEor�s} sign <br /> portions of the "conkractor Btock" of fhis application for which they will be respansible. If yau, as fhe owner sign as fhe <br /> contractor, that may be an indication that he is not properly Ilcensed and is not entitled to permitting privileges in Pasco <br /> County. <br /> 7'RANSPORT'�►TIOfV IMPAC'TIUTILITIES IMPACT AND RESOURGE RECOVERY FEES: The undersigned unders#ands � <br /> that Transpartatian Impact Fees and Recoutse Recovery Fees may apply to#he construction af new buildings; change of <br /> use in existing buildings, or expansian of existing buildings, as specified in Pasco County Ordinance number $9-07 and <br /> 90-07, as ame�ded. The undersigned also understands, that such fees, as may be due, will be identified at the time of <br /> permitting. it is fu�ther unc3erstood that Transpor#ation (mpac# Fees and Resaurce Recovery Fees must be paid priar#o <br /> receiving a '"certi�cate af occupancy" or final power release. If the project does not involve a certificate of occupancy or <br /> final pawer release, the fees must be paid prior fo permit issuance. Furthermore, if Pasca County Wafer/Sewer Irrtpact <br /> fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. <br /> CQNSTRUC'TI�N L1EN �.Ai�/(Chapter 713, �I�r�da Statutes, as arttended}: !f valuatian of work is$2,500.00 ar more, t <br /> certify #hat I, the applicant, have been provided with a copy of the "Florida Construcfian Lien Law—Homeowner`s <br /> Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone <br /> other#han the°owner", I certify thaf 1 have obtained a copy of the above described document and promise in good faith to <br /> deliver it to the"owner" prior to commencement. <br /> CONTRACTt}F2'SIOWNER'S AFFIDAVIT': 1 certify that all the information In#his appEicatiort is accurate and that all work <br /> will be done in compliance with all applicable laws regulating construction, zoning and land develapment. Applicakion is <br /> hereby made to obtain a permit to do work and installatian as indicated. ( certify that no wark or installation has <br /> commenced prior to issuance of a permit and that ail work wi(I be perFormed to meet standards of a1( iaws regu(afing <br /> construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. 1 also <br /> certify thaf 1 understand that the regulafions of ather government agencies may apply to tfie intended work, and fhat it is <br /> my responsibility to identify what actions I must take to be in campliance. 5uch.agencies include but are not limited to: <br /> - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive <br /> Lands, WaterMlastewater Treatment. <br /> - Sbuthwest Florida Vlfater iVlanagement Distric#-Wells, Cypress Bayheads, Wetland Areas, Altering <br /> Wafercourses. <br /> - Army Corps af Engineers-Seawalls, Docks, Navigable Waterways. � <br /> - Deparfinent of Health & Rehabili#ative SetviceslEnvironmental Health Unit-Wells, V1lastewater Treatment, <br /> Septic Tanks. , <br /> - US Environmental Protectian Rgsncy-Asbestas abatem�nt. <br /> - Fede�al Avia#ion Authori#y-Runways. � <br /> I understand that the fo!lawing restrictions apply to the use of fill:� <br /> - Use of fiii is nof allowed in Fioad Zane"V�tanless expressly permitted. <br /> - If the fill material is to be used in Flood Zone "N", it is understood that a drainage plan addressing a � <br /> "campensa#ing voiume" witl be submitted at time of perrrtifting which is preparer! by a professional engineer <br /> licensed by the State of Florida. <br /> - If the fill makerial is to be used in Fload 2one "A° in connection with a permitted bui4ding ustng stem wall <br /> construction, 1 cer#ify that fil(wiil be used on(y fo fifl the area within the sfem wali. � <br /> - If fill material is to be used in any area, 1 certify that use of such fill will not adversely affect adjacent <br /> properties. If use af frll is found ta adversely affect adjacent properties, the owner may be cited for vioiating <br /> the conditions of the building permit issued under the attached permit applica#ion, far lots less than one (1) <br /> acre which are elevated by fill, an engineered drainage plan is requlred, <br /> If I am the AGENT FOR THE OWN�it, I promise in gaod faith to inform #he owner of the permitting conditions set forkh in <br /> this a�davit priar to commencing construction. 1 understand that a separate permit may be required for electrica! work, <br /> piumbing, signs, wells, poois, air conditioning, gas, or ofher instaliations not specificatly inciuded in the applicafion. A <br /> permi# issued shall be canstrued to be a license #o proceed with the work and not as authority to violate, cancel, alter, or il <br /> set aside any provisions�af the#echn'scal codes, nor shall issuance of a permit prevent fhe Building afficiaf from fhereafter <br /> requiring a correctian of errors in plans, construction or violations of any codes. Every permit issued shall became invalid <br /> unless the work autharized by such permi# �s commenced within six manths of permit issuance, or if work autharized by <br /> the permit is suspended or abandoned for a periad of six (6) months after the fime the work is commenced. An extension <br /> tT1�Y �?@ fBC�U@5t8t�, in writing, from the Building Official for a period not ta exceed ninety (90) days and wil! demonstrate <br /> justifiable cause for the extension. If work ceases for ninefy(90)consecutive days, the job is considered abandaned. <br /> WARNING T� OWNER: YOUR FAI�URE TO RIECQRD A NOTtCE UF CQMMENCEMENT IVIAY RESUi.T EN YOUR <br /> PAYING TWICE POR IiYIPROV�nIIENTS TO YOUR PROPERTY. 1F YOU INTEND TO OBl'AIN FINANCING, CONSULT <br /> l�llTN YOUR LENDER OR AN AT7'ORNEY BE�ORE RECORDING Y�UR NC?TICE O�COMMENCEl1flENT. <br /> FLORIDA JURAT(F.S.117.03) <br /> pWRtER QR AGENT CONTRACTOFt <br /> Subscribed and sworn to(or aftirmed)before me this Subscribed and sworn to(or affirmed}before me this <br /> by bY <br /> Who islare personally known#o me or haslhave prodsaced Wha lslare personally Icnawn fo me or haslhave prodnced <br /> as idenUfication. as identification. <br /> Notary Public Notary Public <br /> Commission No. Commission Na. • <br /> � <br /> Name of Notary typed,prfnted or stamped Name of Notary typed,printed or stamped <br />� � <br />