Laserfiche WebLink
FL#: FL 5218.1-R1 <br /> . Date: 2/6/12 <br /> ' � ��� �qirl��rir�� Report No.:11-217-Rib-S9W-ER <br /> Page 5 of 7 <br /> SpPCialty Structural nqlneerinq ceuCK,Inc.Certificate of Authorization Jt8064 <br /> Installation: Installation Met od: <br /> (Refer to drawin s on Pages 6-7 of this report.) <br /> ■ Fastener sp ing: Refer to Table"A"Below <br /> (along the ength of the panel) <br /> ■ Row Spacin : Refer to Tabie"A"Below <br /> (along the ow,across the panel profile) <br /> ■ Rib Interloc : Lapped <br /> ■ Minimum fa tener penetration thru bottom of support,3/16". <br /> ■ For panel onstruction at the end of panels, refer to manufacturer's <br /> instructions nd any site specific design. <br /> TABLE"A" <br /> astener Row Adhesive Design <br /> pacing Spacing Pressure <br /> ' (PSF) <br /> METHOD 1 5',4",5",4", 24„ 3/8"bead along _86 <br /> ..Pattern male flange <br /> " " " " 3/8"bead along <br /> METHOD 2 5, att rn � 12,� male flange -101 <br /> Install the 'TM Rib" roof panel assembly in compliance with the installation <br /> method listed i this report and applicable code sections of FBC 2010. The <br /> � installation me hod described herein is in accordance with the scope of this <br /> evaluation rep rt. Refer to manufacturer's installation instructions as a <br /> supplemental g ide for attachment. <br /> Referenced Data: 1. UL580-94&UL 1897-98 Uplift Test <br /> By Hurrican Test Laboratory,LLC(FBC Organization#TST ID:1527) <br /> � Report#02 7-0322-03#1,2,&3,Date:8/25/03 <br /> 2. Quality Ass rance <br /> By Keyston Certifications,Inc. (QUA ID: 1824) <br /> Thompson rchitectural Metals Company Licensee#260 <br /> 3. Equivalenc of Test Standard Certification <br /> By James L Buckner, P.E.@ CBUCK Engineering <br /> � (FBC Orga ization#ANE 1916) <br /> 4. Certificatio of Independence <br /> ByJames L Buckner,P.E. @ CBUCK Engineering � •-=- - - - <br /> (FBCOrganzation#ANE1916) ��� {:•�__ .•-• - � � <br />