My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
14-15289
Zephyrhills
>
Building Department
>
Permits
>
2014
>
14-15289
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2015 11:03:20 AM
Creation date
11/19/2015 11:02:00 AM
Metadata
Fields
Template:
Building Department
Company Name
MERCHANTS STATION C/O PHILLIPS
Building Department - Doc Type
Permit
Permit #
14-15289
Building Department - Name
MERCHANTS STATION C/O PHILLIPS
Address
7331 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��������$��� � ���� ��� p �s�a ��� � �� ���a�� � ����s�� <br /> The instructions are based on pipe grooved in accord nce with Gruviok°grooving specifications.Check pipe ends for proper <br /> groove dimensions and to assure that the pipe ends are ree of indentations and projections which would prevent proper sealing. <br /> ALWAYS USE A GRUVLOK�L.UBRICANT FOR PROPE COUPLING ASSEMBLY.Thorough lubrication of the external surface <br /> of the gasket is essential to prevent pinching and Po sible damage to the gasket. For temperatures above 150°F use <br /> Gruvlok XtremeT"' Lubricant and lubricate all gasket urfaces, internal and external.See Gruvlok Lubricants in the <br /> Technical Data section of the Gruvlok catalog for ad itional important information. <br /> Step 1 � Step St�p 3 � <br /> }/ 4 <br /> t�/�.���i'�' J� <br /> �°�� °rC. <br /> ��� �� x}J��' � <br /> ��� , �; - _ Y��� _ , <br /> -_ _ _ "� :i�;. J 1J� :� i� <br /> t <br /> Check & lubricate gasket Gas et Ir�s�tallation Alignment <br /> Check gasket to be sure it is Place he smaller opening of the Align the adjoining pipe center <br /> compatible for the intended service. gasket ov r the smaller pipe. Angle lines,and insert the larger pipe end <br /> Apply a thin coating of Gruvlok the gasket over the pipe end and pull into the gasket.Angle the pipe end <br /> lubricant to outside and sealing lips of the gask lip open around the slightly to the face of the gasket and <br /> the gasket.Be eareful that foreign circumfer nce of the pipe.The ceqter tilt the pipe into the gasket and tilt the <br /> particles do not adhere to lubricated leg of the asket should make flush Pipe into the gasket to ease assembly. <br /> surfaces. contact wi h the pipe end and will <br /> prevent tel scoping of the smaller pipe <br /> inside the I rger. <br /> �tep 4 �t�p 5 ��sp � ,.� F��m A �..a. �:,4 <br /> - ��i� , GASKET REDUCING <br /> `-,-�, ��y. - �� COUPLING <br /> "� ,�p_ !�� ,�' S� HOUSING <br /> i .o <br /> � �rGASKET <br /> CENiER RIB <br /> ___' _' __ � �`. —_ __— <br /> �:y <br /> 4 �-- _ PROPER . <br /> � ^ POSITION OF '� <br /> ;� iHE GASKET i <br /> � SEALING ; <br /> LIPS, ' <br /> +". \� <br /> � Housings �ighten Nuts Asserrabiy Complete (Vote: Fig.A iliustrates the <br /> Flace the coupling housing �Tighten the nuts alt mately ��sually inspect the pipe correct position of the Fg.7010 <br /> halves over the gasket making and equally to the spe ified joint to assure the coupling Reducing Coupling gasket <br /> sure the housing keys engage bolt torque.The housi bolt keys are fully engaged in the and housing properly assem- <br /> the grooves. Insert bolts and pads must make met I-to- pipe grooves and the bolt bled onto adjacent pipe ends. <br /> turn nuts finger tight. metal contact. pads are in firm even metal-to- CAUTION: In vertical instal- <br /> CAUTION: Uneven ti ten- metal contact on both sides lations the pipes must be <br /> ing may cause the gas et to of the eoupling. supported to prevent tele- <br /> pinch. scoping during installation. <br /> �►��°���� �� `��� �� ANSI MErnic <br /> SPECIFI�BOLT TORUUE SPECIFI�BO�T TOfl�UE <br /> Specified bolt torque is for the oval neck track bolts used on vlok°couplings �an wr.ncn a�.smea t�n wnncn a��cmee <br /> and flanges.The nuts must be tightened altemately and evenl until fuily tight- sae stm � nan T°r�u.� size siz� ion rar�ue� , <br /> ened.Caution:Use of an impact wrench is not recommende because the �- - �- �+--� �4 mm. N-I! <br /> torque output can vary significantly due to many variables incl ding air pressure '/0 'Y,6 30-45 Mto 16 40-s0 <br /> supply,battery strength and operational variations. Y: '/e 8o-ioo M12 22 110-150 <br /> 5/s tYs 100-130 M16 24 135-175 <br /> Caution:Proper torquing of coupling bolts is required to ob in specified ,�6 iy, 130-18o M2o 30 175-245 <br /> performance.Over torquing the boRs may resuit in damag to the bolt <br /> and/or casting which could result in pipe joint separation.Under torquing '/e t'/e 180-220 M22 34 245-300 <br /> the bolts may result in lower pressure retention capabilities,lo er bend load i is/e 200-25o M24 36 270-340 <br /> sapabilities,joint leakage and pipe joint separation.Pipe joint eparation may ��� �13�6 225-275 �Non-lubricofed bolr torques <br /> result in significant property damage and serious injury. 1Y� 2 250-300 <br /> `Non-lubricated bolt torques <br />
The URL can be used to link to this page
Your browser does not support the video tag.