<br />F.A.C. CHAPTER 61 G15-32 REQUIREMENTS - FIRE SPRINKLER 7
<br />THE FOLLOWING IS AN OUTLINE OF THE MINIMUM DESIGN PARAMETERS ASSOCIATED WITH THE DESIGN OF THE WATER -BASED FIRE PROTECTION SYSTEM ON THIS PROJECT.
<br />THE OUTLINE OF THESE PARAMETERS FOLLOWS THE MINIMUM REQUIREMENTS AS PROVIDED IN THE FLORIDA ADMINISTRATIVE CODE, CHAPTER 61G15-32.
<br />61 G15-32.003 COMMON REQUIREMENTS TO ALL FIRE PROTECTION SYSTEM ENGINEERING DOCUMENTS
<br />32.003(1) THIS FIRE PROTECTION ENGINEERING DOCUMENT PROVIDES THE ENGINEERING REQUIREMENTS TO BE USED IN THE PREPARATION OF THE FIRE PROTECTION
<br />SYSTEM LAYOUT DOCUMENTS FOR THE FOLLOWING SYSTEMS:
<br />a. WET -PIPE FIRE SPRINKLER SYSTEM INSTALLATION.
<br />32.003(2) THE ACCEPTANCE TESTING OF THE FIRE PROTECTION SYSTEM AND COMPONENTS SHALL BE PERFORMED BY THE INSTALLING CONTRACTOR IN ACCORDANCE
<br />WITH THE REQUIREMENTS SET FORTH IN NFPA 13, 2016 EDITION, CHAPTERS 10 AND 25. THE APPROPRIATE CONTRACTOR'S MATERIAL AND TEST
<br />CERTIFICATE(S) SHALL BE COMPLETED AND SIGNED:
<br />NFPA 13, 2016 EDITION, SECTION 25.1(3) & FIGURE 25.1, "CONTRACTOR'S MATERIAL AND TEST CERTIFICATE FOR ABOVEGROUND PIPING"
<br />NFPA 13, 2016 EDITION, SECTION 10.10.1(3) & FIGURE 10.10.1, "CONTRACTOR'S MATERIAL AND TEST CERTIFICATE FOR UNDERGROUND PIPING"
<br />SEE THE REQUIREMENTS LABELED "FIRE SPRINKLER SYSTEM TESTING REQUIREMENTS" ON THIS SHEET FOR ADDITIONAL DETAILS CONCERTING HYDROSTATIC
<br />PRESSURE TESTS.
<br />32.003(3) SEE 32.004(2)(C) AND 32.004(2)(D) FOR OCCUPANCY DESIGN CRITERIA.
<br />32.003(4) SEE 32.004(2)(B) FOR APPLICABLE STANDARDS.
<br />32.003(5) THE FIRE PROTECTION SYSTEM FOR THIS PROJECT MAY CONTRIBUTE 3 POUNDS PER SQUARE FOOT TO THE DEAD LOAD OF THIS BUILDING'S STRUCTURAL
<br />SUPPORT SYSTEM. IT IS THE CONTENTION OF THE ENGINEER OF RECORD FOR THE FIRE PROTECTION SYSTEM THAT THE BUILDING WILL ADEQUATELY
<br />SUPPORT THE FIRE PROTECTION SYSTEM. THIS HAS BEEN CONFIRMED WITH THE STRUCTURAL ENGINEER.
<br />61 G15-32.004 DESIGN OF WATER -BASED FIRE PROTECTION SYSTEMS.
<br />32.004(4)(A) THE POINT -OF -SERVICE FOR THIS BUILDING'S FIRE PROTECTION WATER SUPPLY, AS DEFINED BY 633.021(18) F.S., IS EXISTING AND SHALL REMAIN
<br />AS -IS. SEE THE SITE UTILITY PLANS FOR WATER SUPPLY CONFIGURATION.
<br />32.004(4)(B) THE APPLICABLE STANDARDS TO BE APPLIED IN THE DESIGN OF THIS PROJECT ARE:
<br />FLORIDA BUILDING CODE (2020)
<br />FLORIDA FIRE PREVENTION CODE (2020)
<br />NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS (2016 EDITION)
<br />NFPA 24 STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES (2016 EDITION)
<br />32.004(4)(C) CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR AREA:
<br />LIGHT HAZARD OCCUPANCIES: BREAKROOM, OFFICE, RECORD STORAGE, RESTROOMS
<br />ORDINARY HAZARD OCCUPANCIES (GROUP 1): CLOSET
<br />MISCELLANEOUS STORAGE (RACK STORAGE UP TO CLASS IV COMMODITIES): WAREHOUSE AREAS
<br />32.004(4)(D) DESIGN APPROACH FOR EACH SEPARATE HAZARD OCCUPANCY, OR SYSTEM, AS PER NFPA 13, 2016 ED:
<br />LIGHT HAZARD OCCUPANCIES:
<br />WET PIPE SYSTEM, 0.10 GPM/FT2, 155'F, 225 FT2 MAX SPACING - FOR STANDARD COVERAGE HEADS ONLY. EXTENDED COVERAGE HEADS SHALL BE
<br />PERMITTED WHEN VERIFIED WITH THE HYDRAULIC CALCULATIONS, AND WHEN THE HEAD UL LISTING IS APPLICABLE TO THE TYPE OF CONSTRUCTION. THE
<br />BASE DESIGN AREA FOR THIS HAZARD IS 1,500 SQ.FT., HOWEVER, A REDUCTION IN THE DESIGN AREA, IN ACCORDANCE WITH NFPA 13, SECTION 11.2.3.2.3.
<br />SHALL BE PERMITTED.
<br />ORDINARY HAZARD OCCUPANCIES (GROUP 1)w
<br />WET PIPE SYSTEM, 0.15 GPM/FT2, 155'F, 130 F172 MAX SPACING - FOR STANDARD COVERAGE HEADS ONLY. INTERMEDIATE TEMPERATURE HEADS SHALL BE
<br />USED IN UNCONDITIONED SPACE OR WHEN SPRINKLERS ARE INSTALLED WITHIN 12" OF A METAL ROOF DECK. THE BASE DESIGN AREA FOR THIS HAZARD IS
<br />1,500 SQ.FT., HOWEVER, A REDUCTION IN THE DESIGN AREA, IN ACCORDANCE WITH NFPA 13, SECTION 11.2.3.2.3. SHALL BE PERMITTED.
<br />MISCELLANEOUS STORAGE:
<br />WET PIPE SYSTEM, 0.30 GPM/FT2, 155F, 100 FT2 MAX SPACING. MINIMUM DESIGN AREA SHALL BE 2,500 SQ,FT. THE PROTECTION CRITERIA SPECIFIED
<br />ALLOWS FOR MISCELLANEOUS STORAGE OF CLASS IV COMMODITIES UP TO 12'-0' ON RACKS, PER NFPA 13 TABLE 13.2.1. A 500 GPM HOSE ALLOWANCE
<br />SHALL BE INCLUDED IN THE HYDRAULIC CALCULATIONS. A REDUCTION OF THE DESIGN AREA OF 25%, BUT NOT LESS THAN 2000 SQ.FT. IS PERMITTED WITH
<br />THE USE OF HIGH TEMPERATURE SPRINKLERS, IN ACCORDANCE WITH NPFA 13, SECTION 11.2.3.2.6.
<br />32.004(4)(E)(F)SEE THE FIRE PROTECTION SITE PLAN SHOWN ON SHEET FP-1 FOR WATER SUPPLY SPECIFICS. THIS SITE PLAN IS TO BE USED FOR HYDRAULIC
<br />REFERENCE ONLY.
<br />32.004(4)(G) VALVES AND ALARMS SPECIFIC TO THE FIRE PROTECTION SYSTEM USED ON THIS PROJECT SHALL BE U.L. LISTED & FM APPROVED FOR FIRE PROTECTION
<br />SERVICE. ALL VALVES CONTROLLING CONNECTIONS TO WATER SUPPLIES AND TO SUPPLY PIPES TO SPRINKLERS, INCLUDING BACKFLOW PREVENTION
<br />ASSEMBLIES, SHALL BE LISTED INDICATING VALVES AND PROVIDED WITH TAMPER AND/OR FLOW SWITCHES WITH CONNECTIONS TO LOCAL AUDIBLE ALARMS
<br />AND OFF SITE MONITORING.
<br />32.004(4)(H) IN ACCORDANCE WITH DISCUSSIONS WITH THE LOCAL WATER PURVEYOR AND FIRE MARSHAL, AND FAMILIARITY WITH CONDITIONS IN THE AREA, MICROBIAL
<br />INDUCED CORROSION (MIC) IS NOT KNOWN TO BE PRESENT IN THE WATER SUPPLY.
<br />32.004(4)(1) BACKFLOW PREVENTION REQUIREMENTS (AS APPLICABLE), INCLUDING ANTICIPATED PRESSURE LOSS, ARE INDICATED ON THE FIRE PROTECTION SITE PLAN.
<br />32.004(4)(J) ALL YARD AND INTERIOR FIRE PROTECTION COMPONENTS SHALL BE U.L. LISTED & FM APPROVED FOR FIRE PROTECTION SERVICE AND/OR STATED
<br />PURPOSE.
<br />32.004(4)(K) THE LOCAL MUNICIPAL WATER SUPPLY CAPABILITY HAS BEEN REVIEWED BY THE ENGINEER. IT HAS BEEN DETERMINED A FIRE PUMP WILL NOT BE
<br />REQUIRED ON THIS PROJECT.
<br />32.004(4)(L) THE LOCAL MUNICIPAL WATER SUPPLY CAPABILITY HAS BEEN REVIEWED BY THE ENGINEER. IT HAS BEEN DETERMINED A FIRE WATER STORAGE TANK
<br />WILL NOT BE REQUIRED ON THIS PROJECT.
<br />32.004(4)(M) THE PROJECT HAS AREAS OF RACK STORAGE OF CLASS IV COMMODITIES UP TO 12'-0". SEE THE DESIGN CRITERIA ABOVE FOR RACK STORAGE
<br />PROTECTION CRITERIA AND REQUIREMENTS.
<br />MATERIAL SPECIFICATIONS AND REQUIREMENTS
<br />MATERIALS MAY BE FOREIGN OR DOMESTIC PRODUCTS MEETING THE REQUIREMENTS OF NFPA 13.
<br />THE FOLLOWING PIPE AND MATERIAL REQUIREMENTS APPLY FOR WET -PIPE SYSTEMS ON THIS PROJECT:
<br />I. FIRE SPRINKLER PIPING REQUIREMENTS:
<br />A. ALL INTERIOR GROOVED/WELDED PIPING 1'%" AND LARGER SHALL BE A MINIMUM OF SCHEDULE 10 BLACK STEEL.
<br />S. ALL INTERIOR THREADED PIPING SHALL BE A MINIMUM OF SCHEDULE 40 BLACK STEEL.
<br />C. ALL EXTERIOR PIPING (INCLUDING NIPPLES OR SPOOL PIECES EXTENDING THROUGH EXTERIOR WALLS) SHALL BE
<br />GALVANIZED SCHEDULE 40.
<br />II. FITTING REQUIREMENTS:
<br />A. ALL INTERIOR GROOVED FITTINGS SHALL COME WITH THE FACTORY APPLIED PAINTED COATING AND SHALL BE UL/FM
<br />APPROVED FOR FIRE PROTECTION SERVICE.
<br />B. ALL INTERIOR THREADED FITTINGS SHALL BE CAST IRON, DUCTILE IRON, OR MALLEABLE IRON.
<br />C. ALL EXTERIOR FITTINGS SHALL BE GALVANIZED.
<br />III. DEVICES:
<br />A. AT A MINIMUM DEVICES USED FOR FIRE PROTECTION SERVICE ON THIS PROJECT SHALL BE UL LISTED. THIS INCLUDES FIRE SPRINKLER HEADS, VALVES, FLOW
<br />SWITCHES, ELECTRIC BELLS, TAMPER SWITCHES, CHECK VALVES, ETC.
<br />B. SPRINKLER HEADS SHOWN ON THIS SHEET OR IN THIS PLAN SET SHALL BE THE BASIS OF THE DESIGN. EQUAL HEADS BY OTHER MANUFACTURERS WILL BE
<br />EVALUATED AND APPROVED IF FUNCTIONALLY EQUIVALENT.
<br />FIRE SPRINKLER SPECIFICATIONS AND GENERAL NOTES
<br />1. GENERAL PROJECT SCOPE:
<br />THIS PROJECT CONCERNS THE INSTALLATION OF A NEW WET -PIPE FIRE SPRINKLER SYSTEM TO PROTECT AN OFFICE/WAREHOUSE BUILDING. ONE RISER SHALL BE
<br />INSTALLED.
<br />THE AREAS PROTECTED PER RISER ARE:
<br />WAREHOUSE: APPROXIMATELY 9,318 SO. FT.
<br />OFFICE: APPROXIMATELY 1.328 SO. Fr.
<br />TOTAL: APPROXIMATELY 10,646 SQ.FT.
<br />2. DESIGN PARAMETERS:
<br />A. SEE THE 61G15 PARAMETERS ON THIS SHEET FOR DESIGN CRITERIA.
<br />B. HANGER SPACING AND LOCATIONS SHALL BE IN ACCORDANCE WITH NFPA 13.
<br />C. ALL UNDERGROUND WORK (MATERIAL, INSTALLATION, FLUSHING AND TESTING) IS TO BE IN ACCORDANCE WITH NFPA 24.
<br />D. FIRE SPRINKLER HYDRAULIC CALCULATIONS SHALL MAINTAIN A MINIMUM 10% PRESSURE SAFETY FACTOR. THE SYSTEM PRESSURE SAFETY FACTOR SHALL BE AT
<br />LEAST 10% (TEN PERCENT) OF THE REQUIRED RESIDUAL PRESSURE AT THE TEST LOCATION.
<br />E. AN AUTOMATIC AIR RELEASE VALVE SHALL BE INSTALLED ON THE FIRE SPRINKLER SYSTEM, IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA 13.
<br />3. MATERIALS:
<br />A. ALL FIRE PROTECTION EQUIPMENT AND MATERIALS SHALL BE U.L. LISTED OR FM APPROVED (WHEN APPLICABLE).
<br />B. SEE THE 'MATERIAL SPECIFICATIONS AND REQUIREMENTS' SECTION ON THIS SHEET FOR MATERIAL SPECIFICATIONS.
<br />4. THE FIRE SPRINKLER CONTRACTOR IS RESPONSIBLE FOR MAINTAINING AS-BUILTS.
<br />5. ALL PENETRATIONS THRU RATED WALLS/FLOORS SHALL BE FIRE STOPPED/WATERPROOFED TO MATCH THE RATING OF THE WALL/FLOOR.
<br />6. AUXILIARY DRAIN VALVES ARE TO BE PROVIDED WHERE PORTIONS OF THE SYSTEM ARE INSTALLED "TRAPPED", IN ACCORDANCE WITH NFPA 13.
<br />7. HEADS SHALL NOT BE PAINTED AND SHALL BE TEMPORARILY PROTECTED FROM OVERSPRAY WITH PAPER BAGS OR ALUMINUM FOIL. CARE SHALL BE TAKEN AT ALL
<br />TIMES NOT TO DAMAGE THE SPRINKLER HEAD'S FRANGIBLE BULB.
<br />8. THE FIRE DEPARTMENT CONNECTION SHALL BE LOCATED WHERE SHOWN ON THESE PLANS.
<br />9. THE FIRE SPRINKLER CONTRACTOR SHALL PREPARE A SHOP DRAWING SUBMITTAL AND EQUIPMENT CUTSHEET PACKAGE SUBMITTAL, AND SUBMIT TO THE ENGINEER AND
<br />AUTHORITY HAVING JURISDICTION, FOR APPROVAL. APPROVAL OF SHOP DRAWINGS AND EQUIPMENT SHALL BE OBTAINED PRIOR TO STARTING WORK. THE ENGINEER OF
<br />RECORD SHALL FURNISH THE FIRE SPRINKLER CONTRACTOR WITH AUTOCAD DRAWINGS, PREPARED WITH HYDRACAD SPRINKLER DESIGN SOFTWARE, FOR USE IN
<br />PREPARING SHOP DRAWINGS AND AS-BUILTS.
<br />10. THE SYSTEM SHOWN ON THESE PLANS REQUIRES A CONNECTION TO THE UNDERGROUND FIRE PROTECTION MAIN. THE CONTRACTOR WHO INSTALLS THE UNDERGROUND
<br />PIPING FROM THE POINT OF SERVICE IS RESPONSIBLE FOR COMPLETING THE INSTALLATION TO THE ABOVE GROUND FIRE SPRINKLER SYSTEM CONNECTION FLANGE OR
<br />GROOVED CONNECTION, WHICH BY DEFINITION PER 633.334(3) IS NO MORE THAN 1 FOOT ABOVE THE FINISHED FLOOR (OR FINISHED GRADE FOR OUTSIDE RISERS).
<br />ALL FIRE PROTECTION UNDERGROUND DOWNSTREAM OF THE POINT OF SERVICE IDENTIFIED ON THE PLANS SHALL BE INSTALLED BY A LICENSED CLASS I, CLASS II, OR
<br />CLASS V FIRE PROTECTION CONTRACTOR AS REQUIRED BY THE STATE FIRE MARSHAL. THE UNDERGROUND CONTRACTOR IS RESPONSIBLE FOR APPLYING FOR A
<br />SEPARATE UNDERGROUND FIRE MAIN INSTALLATION PERMIT WITH THE LOCAL AUTHORITY HAVING JURISDICTION AND COMPLETING THE CONTRACTOR'S MATERIAL AND TEST
<br />CERTIFICATE FOR UNDERGROUND PIPING DOCUMENT. ABOVE GROUND CONTRACTORS MAY NOT COMPLETE THE CONTRACTOR'S MATERIAL AND TEST CERTIFICATE FOR THE
<br />UNDERGROUND PIPING OR PORTION THEREOF WHICH HAVE BEEN INSTALLED BY OTHERS. THE UNDERGROUND CONTRACTOR MUST USE EXTREME CARE IN INSTALLING THE
<br />RISER STUB -UP EXACTLY WHERE SHOWN AND DIMENSIONED ON THIS PLAN.
<br />11. QUICK RESPONSE SPRINKLER HEADS SHALL BE INSTALLED THROUGHOUT LIGHT HAZARD AREAS (UNLESS OTHERWISE NOTED).
<br />12. THIS IS A CENTER -OF -TILE INSTALLATION. IN STORAGE AND MECHANICAL ROOMS IT WILL NOT BE NECESSARY TO CENTER HEADS IN THE CEILING GRID.
<br />13. FIRE SPRINKLER PROTECTION SHALL BE PROVIDED UNDER OBSTRUCTIONS OVER 48" IN WIDTH (SUCH AS DUCTWORK), IN ACCORDANCE WITH NFPA 13. SEE THE
<br />ARCHITECTURAL, MECHANICAL, AND ELECTRICAL PLANS FOR FEATURES OR EQUIPMENT THAT MAY REQUIRE FIRE SPRINKLER PROTECTION UNDER OBSTRUCTIONS. IN ORDER
<br />TO MEET THIS SPECIFICATION, INCLUDE AN ADDITIONAL TEN (10) FIRE SPRINKLER HEAD ALLOWANCE IN BUDGET PRICING FOR PROVIDING COVERAGE UNDER
<br />OBSTRUCTIONS OR FOR OTHER UNFORESEEN CONDITIONS. BUDGET PRICING SHALL INCLUDE ASSOCIATED LABOR, PIPE, FITTINGS, HANGERS, ETC. RELATED TO THE
<br />ADDITIONAL HEAD ALLOWANCE.
<br />FIRE SPRINKLER SYSTEM TESTING REQUIREMENTS
<br />1. PER NFPA 13 (2016), SECTION 25.2.1, THE FIRE PROTECTION SYSTEM SHALL BE HYDROSTATICALLY TESTED AS FOLLOWS:
<br />25.2.1 HYDROSTATIC TESTS.
<br />25.2.1.1 UNLESS PERMITTED BY 25.2.1.2 THROUGH 25.2.1.5, ALL PIPING AND ATTACHED APPURTENANCES SUBJECTED TO SYSTEM WORKING PRESSURE SHALL BE
<br />APPLICABLE HYDROSTATICALLY TESTED AT 200 PSI (13.8 BAR) AND SHALL MAINTAIN THAT PRESSURE WITHOUT LOSS FOR 2 HOURS.
<br />ON THIS 25.2.1.2 PORTIONS OF SYSTEMS NORMALLY SUBJECTED TO SYSTEM WORKING PRESSURES IN EXCESS OF 150 PSI (10.4 BAR) SHALL BE TESTED AS DESCRIBED IN
<br />PROJECT 25.2.1.1, AT A PRESSURE OF 50 PSI (3.5 BAR) IN EXCESS OF SYSTEM WORKING PRESSURE.
<br />25.2.1.3 WHERE COLD WEATHER WILL NOT PERMIT TESTING WITH WATER, AN INTERIM AIR TEST SHALL BE PERMITTED TO BE CONDUCTED AS DESCRIBED IN 25.2.2.
<br />THIS PROVISION SHALL NOT REMOVE OR REPLACE THE REQUIREMENT FOR CONDUCTING THE HYDROSTATIC TEST AS DESCRIBED IN 25.2.1.1.
<br />25.2.1.4 MODIFICATIONS TO EXISTING PIPING SYSTEMS SHALL REQUIRE TESTING AT SYSTEM WORKING PRESSURE.
<br />25.2.1.4.1 WHERE MODIFICATION IS MADE TO AN EXISTING SYSTEM AFFECTING MORE THAN 20 SPRINKLERS, THE NEW PORTION SHALL BE ISOLATED AND TESTED
<br />AT NOT LESS THAN 200 PSI (13.8 BAR) FOR 2 HOURS.
<br />25.2.1.4.2 MODIFICATIONS THAT CANNOT BE ISOLATED, SUCH AS RELOCATED DROPS, SHALL REQUIRE TESTING AT SYSTEM WORKING PRESSURE.
<br />25.2.1.5 THE TEST PRESSURE SHALL BE READ FROM A GAUGE LOCATED AT THE LOW ELEVATION POINT OF THE SYSTEM OR PORTION BEING TESTED. THE PRESSURES
<br />IN PIPING AT HIGHER ELEVATIONS SHALL BE PERMITTED TO BE LESS THAN 200 PSI (13.8 BAR) WHEN ACCOUNTING FOR ELEVATION LOSSES. SYSTEMS OR
<br />PORTIONS OF SYSTEMS THAT CAN BE ISOLATED SHALL BE PERMITTED TO BE TESTED SEPARATELY.
<br />25.2.1.6 ADDITIVES, CORROSIVE CHEMICALS SUCH AS SODIUM SILICATE, OR DERIVATIVES OF SODIUM SILICATE, BRINE, OR SIMILAR ACTING CHEMICALS SHALL NOT BE
<br />USED WHILE HYDROSTATICALLY TESTING SYSTEMS OR FOR STOPPING LEAKS.
<br />25.2.1.7 PIPING BETWEEN THE EXTERIOR FIRE DEPARTMENT CONNECTION AND THE CHECK VALVE IN THE FIRE DEPARTMENT INLET PIPE SHALL BE HYDROSTATICALLY
<br />TESTED IN THE SAME MANNER AS THE BALANCE OF THE SYSTEM. AFTER REPAIR OR REPLACEMENT WORK AFFECTING THE FIRE DEPARTMENT CONNECTION,
<br />THE PIPING BETWEEN THE EXTERIOR AND THE CHECK VALVE IN THE FIRE DEPARTMENT INLET PIPE SHALL BE ISOLATED AND HYDROSTATICALLY TESTED AT
<br />150 PSI (10.3 BAR).
<br />25.2.1.8 WHEN SYSTEMS ARE BEING HYDROSTATICALLY TESTED, TESTS SHALL BE PERMITTED TO BE CONDUCTED WITH PENDENT OR HORIZONTAL SIDEWALL SPRINKLERS
<br />OR PLUGS INSTALLED IN FITTINGS. ANY PLUGS SHALL BE REPLACED WITH PENDENT OR HORIZONTAL SIDEWALL SPRINKLERS AFTER THE TEST IS COMPLETED.
<br />ALWORK SHALL COMPLY WITH
<br />jqf�,CODFaA(�11D STANDARDS
<br />HYDRAULIC DESIGN
<br />DATA
<br />CALC ID DESCRIPTION OF AREA
<br />HOSE ALLOW.
<br />COMPANY PRINT DENSITY DESIGN AREA (GPM)
<br />NUMBER OF
<br />HEADS OCCUPANCY
<br />WATER DEMAND AT NODE 'TEST'
<br />COMMODITY MAX. STORAGE INCLUDING HOSE DEMAND
<br />WATER DEMAND AT
<br />BASE OF RISER
<br />SAFETY
<br />FACTOR
<br />PROTECTED
<br />NUMBER (GPM/SQ.FT.) (SQ. FT.) INSIDE/OUTSIDE
<br />CALCULATED CLASSIFICATION
<br />CLASSIFICATION HEIGHT ( GPM ® PSI )
<br />( GPM 0 PSI )
<br />( PSI )
<br />2653-A WAREHOUSE
<br />FP2 0.30 2,025 0 / 500
<br />21 EXTRA HAZARD
<br />(GROUP 1)
<br />CLASS IV 12'-0" 1153.7 GPM 0 32.6 PSI
<br />653.7 GPM 0 21.9 PSI
<br />6.2 PSI
<br />SPRINKLER
<br />HEADS AND LEGEND - BASIS OF DESIGN
<br />MAKE
<br />MODEL
<br />TYPE
<br />RESPONSE
<br />"K"
<br />NPT
<br />TEMP
<br />FINISH - HD/ESC
<br />SPRK ID#
<br />SYMBOL
<br />TOTAL
<br />COMMENTS
<br />SPARE HEAD COUNT BY TYPE
<br />RELIABLE
<br />Ft FR56
<br />RECESSED PENDENT
<br />QUICK
<br />5.6
<br />32"
<br />155-F
<br />WHITE / WHITE
<br />RA1414
<br />@
<br />15
<br />2
<br />RELIABLE
<br />FlFR56
<br />UPRIGHT
<br />QUICK
<br />5.6
<br />Xz"
<br />155'F
<br />BRASS
<br />RA1425
<br />0
<br />2
<br />2
<br />RELIABLE
<br />GXLO
<br />UPRIGHT
<br />STANDARD
<br />11.2
<br />286'F
<br />BRASS
<br />R2921
<br />®
<br />96
<br />2
<br />TOTAL SPARE HEADS
<br />6
<br />TOTAL HEADS
<br />113
<br />TOTAL DOES NOT INCLUDE SPARE HEAD COUNT
<br />LOCATE SPARE HEAD CABINET
<br />NEXT TO THE RISER
<br />THE SPRINKLER HEAD COUNT SHOWN ON THIS PLAN SHALL BE CONSIDERED APPROXIMATE UNTIL VERIFIED BY THE CONTRACTOR. ANY DISCREPANCY SHALL BE IMMEDIATELY BROUGHT TO THE ENGINEER'S ATTENTION.
<br />HATCHER
<br />ENGINEERING, INC.
<br />NFPA 13 Owner's Certificate Information - Fire Sprinkler Protection
<br />The purpose of an "Owner's Certificate" is to obtain a declaration of the intended use of the occupancy to be
<br />protected. The following is a consolidation of the information found in the Owner's Certificate example
<br />provided in NFPA 13, and additional information used to help describe the hazards to be protected.
<br />Property to be Protected: Professional Hair Labs
<br />3795 Correia Dr.
<br />Zephyrhills, FL 33542
<br />Name of Owner: SCIENTIFIC COSMETIX LLC
<br />,d j/ �0� 1/
<br />REVIEW DATE f
<br />27251 WESLEY CHAPEL BLVD
<br />WESLEY CHAPEL, FL 33544
<br />SUITE B14 #722
<br />CITY OF ZEPHYRHILLS
<br />EXAMINER'
<br />k
<br />FIRE AND LIFE SAFETY
<br />O
<br />Existing or Planned Construction Description: Shipping and receiving Warehouse
<br />0
<br />In
<br />Z
<br />_
<br />o
<br />U
<br />(n
<br />5;
<br />ry
<br />w
<br />Is the system installation intended for one of the following special occupancies?
<br />w
<br />o'
<br />Aircraft hangar: .................................................... . ❑ Yes
<br />0 No
<br />Fixed guideway transit system: ............................ ❑ Yes
<br />0 No
<br />ALL WORK SHALL COMPLY WITH
<br />Race track stable: ................................................ ❑ Yes
<br />0 No
<br />t4FFA CODES Ai4D STANDARDS
<br />Marine terminal, pier, or wharf: ............................ El Yes
<br />0 No
<br />Airport terminal: ....................................................
<br />erminal:.................................................... ❑ Yes
<br />0 No
<br />Aircraft engine test facility: ................................... ❑ Yes
<br />0 No
<br />Power plant: ......................................................... ❑ Yes
<br />0 No
<br />Water-cooling tower: ............................................ ❑ Yes
<br />0 No
<br />If the answer is yes to any of the above, please elaborate:
<br />Indicate whether any of the following special materials are intended
<br />to be present?
<br />Flammable or combustible liquids: ..... ................. ❑ Yes
<br />0 No
<br />Aerosol products: ................................................. ❑ Yes
<br />0 No
<br />Nitrate film:... ........................................................ ❑ Yes
<br />0 No
<br />Pyroxylin Plastic: .................................................. ❑ Yes
<br />0 No
<br />Compressed or liquefied gas cylinders: ............... ❑ Yes
<br />0 No
<br />Liquid or solid oxidizers: ....................................... ❑ Yes
<br />0 No
<br />Organic peroxide formulations: ............................ ❑ Yes
<br />0 No
<br />Idle pallets: ...................................................... .... ❑ Yes
<br />0 No
<br />If the answer is yes to any of the above, please elaborate
<br />on type, location, arrangement,
<br />and intended
<br />maximum quantities:
<br />m
<br />M
<br />-,
<br />R.
<br />Page 1 of 2 o
<br />r7
<br />o I
<br />ri©
<br />NFPA 13 - Owner's Certificate
<br />Indicate whether the protection is intended for one of the following specialized occupancies or
<br />areas?
<br />Spray area or mixing room: ............................... ....................
<br />❑ Yes
<br />0 No
<br />0
<br />Solvent extraction: .................................................................
<br />❑ Yes
<br />0 No
<br />_
<br />Laboratory using chemicals: ..................................................
<br />❑ Yes
<br />0 No
<br />Oxygen -fuel gas system for welding or cutting: .....................
<br />❑ Yes
<br />0 No
<br />0
<br />Acetylene cylinder charging: ..............................
<br />.
<br />❑ Yes
<br />0 No
<br />J
<br />d- 'I -
<br />Production or use of compressed or liquefied gases: ............
<br />❑ Yes
<br />0 No
<br />LL
<br />Lr) Lf-j 00
<br />Commercial cooking operation: .............................................
<br />❑ Yes
<br />0 No
<br />LL
<br />0 tM
<br />Class A hyperbaric chamber: .................................. ..............
<br />❑ Yes
<br />0 NO
<br />O
<br />J M
<br />0
<br />Cleanroom:.............................................................................
<br />El Yes
<br />0 No
<br />a
<br />Incinerator or waste handling system: ...................................
<br />❑ Yes
<br />0 No
<br />Z
<br />'T-
<br />Linen handling system: ..........................................................
<br />❑ Yes
<br />0 No
<br />0
<br />I-- J
<br />Industrial furnace: ..................................................................
<br />❑ Yes
<br />0 No
<br />Q JM
<br />Water cooling tower: ..............................................................
<br />E]_ Yes
<br />0 No
<br />V
<br />iv)00
<br />If the answer is yes to any of the above, please elaborate on type,
<br />location, arrangement, and intended
<br />M J
<br />maximum quantities:
<br />H
<br />Will there be any storage of products over 12 ft in height?
<br />Ul
<br />Z
<br />M N
<br />❑ Yes 0 No
<br />0
<br />V
<br />If the answer is yes to any of the above, please elaborate on type,
<br />location, arrangement, and intended
<br />Z
<br />maximum quantities:
<br />I
<br />Will there be any storage of plastic, rubber, or similar products over 5 ft high except as described
<br />>_
<br />above?
<br />❑ Yes 0 No
<br />2O�J��,yd
<br />If the answer is yes to any of the above, please elaborate
<br />on type,
<br />location, arrangement, and intended
<br />maximum quantities:
<br />id�y
<br />Describe other features of the building or occupancy that may affect protection of the hazard?
<br />I certify that I have knowledge of the intended use of the property and that the above information is correct.
<br />Signature of owner's representative or agent: �ClrvG %7
<br />Date: 10/0512023
<br />Name of owner's representative or agent (print): D-ID MARGOLIN
<br />Relationship and firm of agent (print): OWNER
<br />Page 2 of 2
<br />FIRE SPRINKLER DRAWING LEGEND
<br />SHEET #
<br />DESCRIPTION
<br />FP-0
<br />FIRE SPRINKLER SPECIFICATIONS, GENERAL NOTES AND LEGENDS
<br />FP-1
<br />BELOW MEZZANINE FIRE SPRINKLER PLAN AND SITE PLAN
<br />FP-2
<br />OVERHEAD FIRE SPRINKLER PLAN
<br />FP-3
<br />FIRE SPRINKLER DETAILS
<br />DRAWINGS PREPARED BY:
<br />y�HATCHER ENCs(NEERiNG, INC.
<br />NOTE:
<br />WHEN SIGNED AND SEALED
<br />BY THE
<br />ENGINEER -OF -RECORD
<br />ENGINEER OF RECORD:
<br />`!;ram<,,S "cr=ly ''R����i Digitally signed
<br />O b James P
<br />Fj FIRE PROTECTION ENCINEERINC • LIFE SAFETY
<br />(USING EITHER A DIGITAL
<br />No 93056 y
<br />Florida Cert. of Authorization #: 28929
<br />SIGNATURE OR INK
<br />= * O f I ZZO
<br />PLANT ClTY OLDSMAR.
<br />SEAL\SIGNATURE), PRINTED
<br />_ v _ a =
<br />2108 W. Risk Street 720 Brooker Creek Blvd
<br />COPIES OF THIS DOCUMENT
<br />NOT CONSIDERED
<br />C) STATE STATE OF =� Date: 2024.04.22
<br />P/ant City, FL 33563 Suite 205
<br />6900 Oldsmar, fZ 34677
<br />((811)
<br />SIGNEARE
<br />DIGITALDAND SEALED
<br />MUST
<br />�+`` ' '
<br />15:30:27 -04 00
<br />'���p�
<br />Frek ax: 752
<br />SIGNATURES
<br />BONA L ; �`
<br />BE VERIFIED ON ANY
<br />gltlltu��
<br />www.hatcherengineering.com
<br />ELECTRONIC COPIES.
<br />e-mail.- N✓HOhotcherengineering.com
<br />JAMES P. MORIZZO, #93056 PLOT DATE: 04\22\2
<br />W
<br />U
<br />Ln
<br />W
<br />I--
<br />O
<br />Z
<br />ate Q
<br />O m
<br />J
<br />QQ
<br />U_ Jre re
<br />Z
<br />Imo_ I� Ou
<br />o�
<br />LLJ
<br />c 7
<br />_J Q Z O
<br />U=WtJi
<br />Z
<br />OZ
<br />pN
<br />U_ <
<br />a
<br />W
<br />LrV Z a
<br />u
<br />-I
<br />CL
<br />�O=>>..
<br />Ii
<br />wQ
<br />LLJ Lf_ L�.I
<br />C),
<br />�O0NLLj
<br />Q�
<br />Z
<br />w
<br />W
<br />a
<br />O
<br />V
<br />"'
<br />LLJ
<br />0Y
<br />V
<br />w
<br />�
<br />0
<br />a_
<br />l%
<br />w
<br />o
<br />DESIGNED BY
<br />JPM
<br />DRAWN BY
<br />JPM
<br />CHECKED BY
<br />HE[
<br />PROJECT NO./CAD CODE
<br />2023-2653
<br />DATE
<br />10/12/23
<br />DRAWING NO.
<br />FP-0
<br />Vv
<br />1-0
<br />f J
<br />�v