9
<br />01
<br />14
<br />D
<br />D
<br />D
<br />N
<br />0
<br />2
<br />D
<br />D
<br />1
<br />14
<br />0
<br />CL
<br />E
<br />E
<br />0
<br />9
<br />E2
<br />0
<br />9
<br />LD
<br />D
<br />14
<br />14
<br />14
<br />XD
<br />7
<br />n
<br />INDEX OF DRAWINGS
<br />SHEET DESCRIPTION
<br />SHEET
<br />No.
<br />CS COVER SHEET
<br />FIRST FLOOR PLAN
<br />1.2 SECOND FLOOR PLAN
<br />2.1 EXTERIOR ELEVATIONS - FRONT & LEFT
<br />2,2 EXTERIOR ELEVATIONS - REAR & RIGH
<br />3 ELECTRICAL PLAN
<br />4 ROOF PLAN >
<br />---------- b-100
<br />5 FOUNDATION PLAN
<br />6.1 FLOOR FRAMING PLAN
<br />6.2 ROOF FRAMING PLAN W
<br />7 LINTEL PLAN & DETAILS
<br />SN STRUCTURAL NOTES
<br />..Won
<br />ABBREVIATIONS SN1 DETAILS
<br />S3 DETAILS
<br />AB or A.B. Anchor Bolt FIX or FXD Fixed PWDR or Pwd. PowderRoom
<br />ABV or Abv. Above FLR or Mr. Floor RA or R/A or R.A. Return Air S4 DETAILS
<br />AC or A/C Air -Conditioner FUR SYS or Fir Sys Floor System RAID or Rad. Radius
<br />ADJ or ADJ. Adjustable FOM or F,O.M. Face Of Masonry RAG or Rag. Return Air Grill S5 DETAILS
<br />AFF or A.F.F. Above Finished Floor FP or F.P. Fireplace REC or Rec. Recessed
<br />AHU orA.H.U. Air Handler Unit FIR DR French Door RECEPT Receptacle ST STAIR DETAILS
<br />ALT or ALT. Alternate FIRT Front REF or Ref. Refrigerator
<br />BC Base Cabinet FT or Ft. Foot/ Feet REINF Reinforcing SS RETROFIT DETAILS
<br />BF Bifold Door FTG or Ftg. Footing REQD or Req'd. Required
<br />BK SH or Bk Sh BookShelf FXD GL Fixed Glass RM or Rm. Room D 1 SECTIONS & DETAILS
<br />BLK or BLK. Block GALV or Galv. Galvanized RND or Rnd. Round D2 SECTIONS & DETAILS
<br />BLW or BLW. Below GC or G.C. General Contractor RO or R.O. Rough Opening
<br />BM or Bm. Beam GFI or G.F.I. Ground Fault Interrupter IRS, R/S, R/SH or R&S Rod and Shelf VVID WATERPROOFING DETAILS
<br />BOT or Bot. Bottom GT or G.T. Girder Truss SD or SID. Smoke Detector
<br />PA1.0 PRODUCT APPROVAL NUMBERS
<br />BP or B.P. Bypass(door) GYP BD or Gyp. Bd. Gypsum Board SGD Sliding Glass Door E
<br />BIRG or BRG. Bearing HB Hose Bibb SH or Sh. Shelves PA1.1 PRODUCT APPROVALNUMBERS
<br />C Carpet H DR or Hdr. Header SHT Sheet
<br />CAB Cabinet HGT or Hgt. Height SHWR or Shwr. Shower PA1.2 PRODUCTAPPROVAL NUMBERS
<br />CIR or Cir. Circle HH or H.H. Hand Held (plumbing faucet) SL or S.L. Side Lights PA1.3 PRODUCTAPPROVAL NUMBERS
<br />CJ or C/J Control Joint HORIZ Horizontal SPECS or SPECS. Specifications
<br />CLG or Clg. Ceiling HS Hard Surface (flooring) SPF or S.P.F. Spruce Pine Fir SH1.0 HURRICANE SHUTTER PRODUCT APPROVAL
<br />CMU Concrete Masonry Unit ILO In Lieu Of SQ FT or SIF or S,F. Square Foot (feet)
<br />SH1.1 HURRICANE SHUTTER PRODUCT APPROVAL
<br />COFF or Coff. Coffered or Tray Ceiling INSUL or Insul. Insulation SQ or Sq. Square
<br />COL or Col. Column INT or Int. Interior STO Storage SH1.2 HURRICANE SHUTTER PRODUCT APPROVAL
<br />COMM or Comm. Community K/WALL or K/Wall Kneewall SW or S.W. Shear Wall
<br />SH1.3 HURRICANE SHUTTER PRODUCT APPROVAL
<br />COMP or Comp. Compressor KS or K.S. Knee Space SYP or S.Y.P. Southern Yellow Pine
<br />SH1.4 HURRICANE SHUTTER PRODUCT APPROVAL
<br />Ll
<br />CONN or CONN. Connection LAUN or Laun. Laundry TB Towel Bar
<br />TEMP or Temp.
<br />CONT or Cont. Continuous LAV or Lay. Lavatory Tempered SH1.5 HURRICANE SHUTTER PRODUCT APPROVAL
<br />CT or C.T. Ceramic Tile LF or L.F. Linear Ft. TH I KN or Thik'n. Thicken
<br />D or D. Dryer ILL Lintel Length TOB or T.O.B. Top of Block
<br />DB Door Bell LT Laundry Tub TOM or T.O.M. Top of Masonry
<br />DBIL or Dbl. Double MAS or Mas. Masonry TOP or T.O.P. Top of Plate
<br />DCF Decorative Cementitious Finish MAX or Max Maximum TP Toilet Paper Holder
<br />DEC or Dec. Decorative MC Medicine Cabinet TIR Towel Ring
<br />DED or Ded. Dedicated (outlet) IMFR or Mfr. Manufacturer TRANS WDW or Trans. Transom Window
<br />DIA or Dia. Diameter MGT Management (room) TYP or Typ, Typical
<br />DISP or Disp. Disposal MIN or Min Minimum UC or u.c. Under Counter
<br />DIST or Dist. Distance MIR or Mir. Mirror UCL Under Cabinet Lighting
<br />DMF Decorative Masonry Finish ML or M.L. Microlam UNO or U.N.O. Unless Noted Otherwise
<br />DS or D.S. Drawer Stack MONO or Mono Monolithic V or v. Valve (shower or tub/shower)
<br />DTL Detail MW or MICRO or Micro. Microwave VB Vanity Base
<br />DV or D.V. DryerVent NTS or N.T.S. Not to Scale VERT or Vert. Vertical
<br />DVP or D.V.P. Diverter Valve (plumbing) OE or O.E. Owner's Entry VL or V, L. Versalam MEAN ROOF 15 FT. HIGH TYPICAL
<br />DWorD�W. Dishwasher OPNG or Opn'g. Opening VTR or VTE Vent through Roof / Exterior FOR SINGLE STORY HOMES
<br />EA or Ea. Each OPT or Opt. Optional Worw Washer
<br />ELEC or Elec. Electrical PC Pull Chain W/ or w/ With MEAN ROOF 30 FT. HIGH TYPICAL
<br />ELEV or Elev. Elevation PED or Ped. Pedestal WA or W.A. Wedge Anchor FOR 2 STORY HOMES
<br />EQ Equal PH Phone WC or W/C or W.C. Water Closet (toilet)
<br />EW or E.W. Each Way PKT or Pkt. Pocket (Door) WD or Wd Wood THIS DRAWING AND DESIGN IS VALID
<br />EXP or Exp. Expansion PL or P.L. Parallam WDW HDR or VVDW, HDR. Window Header FOR 12 MONTHS AFTER THE DATE IT
<br />EXT or Ext. Exterior PLF Pounds per linear foot WH or W.H. Water Heater IS SIGNED AND SEALED OR WHILE
<br />FBC Florida Building Code PLNT SHLF or Pit. Sh. Plant Shelf WIC or W. I.C. Walk-in Closet CURRENT CODE IS VALID
<br />FDN or Fdn. Foundation PLT HT or Pit. Ht. Plate Height WM or W.M. Wall Mounted (plumbing fixture)
<br />FG Fiberglass (Shower Pan) PSF Pounds per square foot WIP Water Proof(ing) CODE REFERENCES ARE SUMMARIES
<br />FIN Finished PT or P.T. Pressure Treated WS Water Softener OF CODE SECTIONS.
<br />FIN FLR or FF or Fin. FIr. Finished Floor PW or P.W. Pre -wire WWF Welded Wire Fabric (Mesh) SEE FBCR (CURRENT VERSION) FOR
<br />PLAN REVISIONS COMPLETE CODE INFORMATION.
<br />DATE VERSION DESCRIPTION Notice to Builder & All Subcontractors
<br />it is the intent of Designer/Engineer listed in the titleblock of these
<br />08/23/12 1.00 NEW BASE PLAN documents that these documents be accurate, providing Licensed
<br />Professionals clear information. Every attempt has been made to
<br />prevent error. The Builder and all subcontractors are required to
<br />review all the information contained in these documents, prior to
<br />07/30/15 1.1 2015 NEW CODE UPDATE the commencement of any work. The Designer/Engineer are not
<br />responsible for any plan errors, omissions,or misinterpretations
<br />undetected and not reported to the Designer/ Engineer prior to
<br />05/09/18 2.0 FBC 2017 CODE UPDATES construction. All construction MUST be in accordance to the
<br />information found in these documents. Any questions regarding
<br />the information found in these plans should be directed to our
<br />Office at (407) 880-2333 immediately. No backcharges; will be
<br />12/19/20 3.0 FBC 2020 CODE UPDATES considered for reimbursement by the Designer/Engineer without
<br />advanced notification and approval by the Designer/Engineer.
<br />Payments will be made in accordance to the terms of the
<br />agreement.
<br />Control of Construction Site
<br />The Designer/Architect and engineer of record (EOR) have no
<br />control over the construction site and shall not be responsible in
<br />any manner for control of the construction site including, but not
<br />limited to, scheduling and sequencing of work, jobsite safety, and
<br />ventilation of the building and thereby shall not be responsible for
<br />the indoor air quality, or the effects thereof, for any reason
<br />whatsoever. The Designer/Architect and EOR has no duty to
<br />protect, without limitation, the residence, construction site,
<br />materials, or equipment, from moisture, mold, fungus, fire, theft,
<br />vandalism, trespass, or any other peril or condition, at any time,
<br />expressly including, but not limited to, the period of time before
<br />construction, during the construction of the project, or after
<br />construction and the Designer/Architect and EOR has no duty to
<br />take any action or preventive measures to protect such property
<br />against any such peril at any time for any reason.
<br />Care and Maintenance
<br />Yearly maintenance and inspections by the builder/homeowner
<br />are necessary for the future life of this home. Care must be taken
<br />to check windows and doors for caulking, remove leaves and
<br />debris off roofs, make sure that water flow is away from the
<br />house and have your home repainted every 3 - 5 years to protect
<br />the coatings. The designer and engineer of record are not
<br />responsible for the upkeep of the home and will not be held
<br />liable for instances that may occur over the normal life of the
<br />home without proper maintenance.
<br />C=
<br />04 C)
<br />C5
<br />C,.
<br />LA.
<br />21-4
<br />.-at M
<br />W CD
<br />-s
<br />cn CL
<br />E
<br />CD
<br />W
<br />...........
<br />r
<br />Z
<br />C3
<br />..p
<br />V—)
<br />To the best of the Engineers knowledge, information and belief,
<br />the structural plans and specifications contained within
<br />these
<br />drawings comply with the 2020 Florida Building Code
<br />-
<br />Residential 7th Edition. Engineers signature and seal
<br />is only for
<br />the structural engineering portions of the drawing pages bearing
<br />Engineers signature and sea].
<br />W E
<br />0
<br />0 CY)
<br />IN
<br />R C)
<br />0 20 00
<br />91
<br />U) J), r-- PL F
<br />C) U
<br />r- L�
<br />-J L Uu
<br />M LL
<br />Lau
<br />co C
<br />1131
<br />0
<br />:3 Co
<br />W 02, C,
<br />, ;3; X
<br />ju 0 1 . M
<br />Z - Zo <-
<br />LO co
<br />I IL
<br />L
<br /><
<br />0 < 0
<br />Z L)
<br />W
<br />El 11
<br />0
<br />.0
<br />7:7
<br />< <
<br />CD
<br />LU
<br />Q 0 LL,
<br />)
<br />Ln
<br />L/I
<br />co
<br />E
<br />C:,
<br />CY3
<br />cy).
<br />Z
<br />0
<br />Z
<br /><
<br />__J
<br />c6 E
<br />CD- 0
<br />E-
<br />55
<br />�Z
<br />;t 0
<br />1.
<br />Z
<br /><
<br />Z 0
<br />L
<br />y
<br />fo
<br />Q
<br />E
<br />�c 0.
<br />. ,
<br />00
<br />D a
<br />0,
<br />� Z
<br />C14 ru
<br />It
<br />0
<br />:03
<br />U)
<br />. F
<br />Z
<br /><
<br />-
<br />0
<br />0,
<br />Z
<br />C, (3)
<br />Z
<br />Zo
<br />W
<br />Mill
<br />C:)
<br />co
<br />d,
<br />01 W
<br />R
<br />0
<br />00
<br />Ir
<br />Z
<br />0 C)
<br />cy)
<br />0
<br />C13
<br />(D
<br />CY)
<br />=3 C)
<br /><
<br />cc
<br />C)
<br />U) 2
<br />4-J
<br />LO
<br />4-1
<br />0 72
<br />r111.
<br />C\I
<br />C)
<br />C'4
<br />C)
<br />0 C:)
<br />L0 04
<br />LO
<br />< CF)
<br />Ir—
<br />a)
<br />E
<br />CY) C14
<br />E 00
<br />0
<br />M
<br />Z
<br />=% 0)
<br />E
<br />a:
<br />E
<br />0
<br />0 < C1
<br />C:
<br />JOB
<br />NO: 22-09401
<br />SCALE : AS NOTED_
<br />SHEET NO.
<br />C S
<br />Z
<br />
|