�. �.�... �......, ,. ,., ,.. ,-.. .. , � n.�, ,� ..,,, i. par 1 If" I I � r., m 'I u•
<br />a
<br />v
<br />-v
<br />0
<br />0
<br />J
<br />0
<br />0
<br />CV
<br />a
<br />rn
<br />O
<br />r�
<br />N
<br />A
<br />ABBREVIATIONS
<br />AB or A.B.
<br />Anchor Bolt
<br />FIX or FXD
<br />Fixed
<br />PWDR or Pwd.
<br />Powder Room
<br />ABV or Abv.
<br />Above
<br />FLR or Fir.
<br />Floor
<br />RA or R/A or R.A.
<br />Return Air
<br />AC or A/C
<br />Air -Conditioner
<br />FLR SYS or Fir Sys
<br />Floor System
<br />RAD or Rad.
<br />Radius
<br />ADJ or ADJ.
<br />Adjustable
<br />FOM or F.O.M.
<br />Face Of Masonry
<br />RAG or Rag.
<br />Return Air Grill
<br />AFF or A.F.F.
<br />Above Finished Floor
<br />FP or F.P.
<br />Fireplace
<br />REC or Rec.
<br />Recessed
<br />AHU or A.H.U.
<br />Air Handler Unit
<br />FR DR
<br />French Door
<br />RECEPT
<br />Receptacle
<br />ALT or ALT.
<br />Alternate
<br />FRT
<br />Front
<br />REF or Ref.
<br />Refrigerator
<br />BC
<br />Base Cabinet
<br />FT or Ft.
<br />Foot/ Feet
<br />REINF
<br />Reinforcing
<br />BF
<br />Bifold Door
<br />FTG or Fig.
<br />Footing
<br />REQD or Req'd.
<br />Required
<br />BK SH or Bk Sh
<br />BookShelf
<br />FXD GL
<br />Fixed Glass
<br />RM or Rm.
<br />Room
<br />BLK or BLK.
<br />Block
<br />GALV or Galy.
<br />Galvanized
<br />RND or Rnd.
<br />Round
<br />BLW or BLW.
<br />Below
<br />GC or G.C.
<br />General Contractor
<br />RO or R.O.
<br />Rough Opening
<br />BM or Bm.
<br />Beam
<br />GFI or G.F.I.
<br />Ground Fault Interrupter
<br />RS, R/S, R/SH or R&S
<br />Rod and Shelf
<br />BOT or Bot.
<br />Bottom
<br />GT or G.T.
<br />Girder Truss
<br />SO or SD.
<br />Smoke Detector
<br />BP or B.P.
<br />Bypass (door)
<br />GYP BD or Gyp. Bd.
<br />Gypsum Board
<br />SGD
<br />Sliding Glass Door
<br />BRG or BRG.
<br />Bearing
<br />HB
<br />Hose Bibb
<br />SH or Sh.
<br />Shelves
<br />C
<br />Carpet
<br />HDR or Hdr.
<br />Header
<br />SHT
<br />Sheet
<br />CAB
<br />Cabinet
<br />HGT or Hgt.
<br />Height
<br />SHWR or Shwr.
<br />Shower
<br />CIR or Cir.
<br />Circle
<br />HH or H.H.
<br />Hand Held (plumbing faucet)
<br />SL or S.L.
<br />Side Lights
<br />CJ or C/J
<br />Control Joint
<br />HORIZ
<br />Horizontal
<br />SPECS or SPECS.
<br />Specifications
<br />CLG or Clg.
<br />Ceiling
<br />HS
<br />Hard Surface (flooring)
<br />SPF or S.P.F.
<br />Spruce Pine Fir
<br />CMU
<br />Concrete Masonry Unit
<br />ILO
<br />In Lieu Of
<br />SQ FT or SF or S.F.
<br />Square Foot (feet)
<br />COFF or Coff.
<br />Coffered or Tray Ceiling
<br />INSUL or Insul.
<br />Insulation
<br />SQ or Sq.
<br />Square
<br />COL or Col.
<br />Column
<br />INT or Int.
<br />Interior
<br />STO
<br />Storage
<br />COMM or Comm.
<br />Community
<br />K/WALL or KlWall
<br />Kneewall
<br />SW or S.W.
<br />Shear Wall
<br />COMP or Comp.
<br />Compressor
<br />KS or K.S.
<br />Knee Space
<br />SYP or S.Y.P.
<br />Southern Yellow Pine
<br />CONN or CONN.
<br />Connection
<br />LAUN or Laun.
<br />Laundry
<br />TB
<br />Towel Bar
<br />CONT or Cont.
<br />Continuous
<br />LAV or Lay.
<br />Lavatory
<br />TEMP or Temp.
<br />Tempered
<br />CT or C.T.
<br />Ceramic Tile
<br />LF or L.F.
<br />Linear Ft.
<br />THIKN or Thik'n.
<br />Thicken
<br />D or D.
<br />Dryer
<br />LL
<br />Lintel Length
<br />TOB or T.O.B.
<br />Top of Block
<br />DB
<br />Door Bell
<br />LT
<br />Laundry Tub
<br />TOM or T.O.M.
<br />Top of Masonry
<br />DBL or Dbl.
<br />Double
<br />MAS or Mas.
<br />Masonry
<br />TOP or T.O.P.
<br />Top of Plate
<br />DCF
<br />Decorative Cementitious Finish
<br />MAX or Max
<br />Maximum
<br />TP
<br />Toilet Paper Holder
<br />DEC or Dec.
<br />Decorative
<br />MC
<br />Medicine Cabinet
<br />TR
<br />Towel Ring
<br />DED or Ded.
<br />Dedicated (outlet)
<br />MFR or Mfr.
<br />Manufacturer
<br />TRANS WDW or Trans.
<br />Transom Window
<br />DIA or Dia.
<br />Diameter
<br />MGT
<br />Management (room)
<br />TYP or Typ.
<br />Typical
<br />DISP or Disp.
<br />Disposal
<br />MIN or Min
<br />Minimum
<br />UC or u.c.
<br />Under Counter
<br />DIST or Dist.
<br />Distance
<br />MIR or Mir.
<br />Mirror
<br />UCL
<br />Under Cabinet Lighting
<br />DMF
<br />Decorative Masonry Finish
<br />ML or M.L.
<br />Microlam
<br />UNO or U.N.O.
<br />Unless Noted Otherwise
<br />DS or D.S.
<br />Drawer Stack
<br />MONO or Mono
<br />Monolithic
<br />V or v.
<br />Valve (shower or tub/shower)
<br />DTL
<br />Detail
<br />MW or MICRO or Micro.
<br />Microwave
<br />VB
<br />Vanity Base
<br />DV or D.V.
<br />Dryer Vent
<br />NTS or N.T.S.
<br />Not to Scale
<br />VERT or Vert.
<br />Vertical
<br />DVP or D.V.P.
<br />Diverter Valve (plumbing)
<br />OE or O.E.
<br />Owner's Entry
<br />VL or V.L.
<br />Versalam
<br />DW or D.W.
<br />Dishwasher
<br />OPNG or Opn'g.
<br />Opening
<br />VTR orVTE
<br />Vent through Roof / Exterior
<br />EA or Ea.
<br />Each
<br />OPT or Opt.
<br />Optional
<br />W or w
<br />Washer
<br />ELEC or Elec.
<br />Electrical
<br />PC
<br />Pull Chain
<br />W/ orw/
<br />With
<br />ELEV or Elev.
<br />Elevation
<br />PED or Ped.
<br />Pedestal
<br />WA or W.A.
<br />Wedge Anchor
<br />EQ
<br />Equal
<br />PH
<br />Phone
<br />WC or W/C or W.C.
<br />Water Closet (toilet)
<br />EW or E.W.
<br />Each Way
<br />PKT or Pkt,
<br />Pocket (Door)
<br />WD or Wd
<br />Wood
<br />EXP or Exp.
<br />Expansion
<br />PL or P.L.
<br />Parallam
<br />WDW HDR or WDW. HDR.
<br />Window Header
<br />EXT or Ext.
<br />Exterior
<br />PLF
<br />Pounds per linear foot
<br />WH or W.H.
<br />Water Heater
<br />FBC
<br />Florida Building Code
<br />PLNT SHLF or Pit. Sh.
<br />Plant Shelf
<br />WIC or W.I.C.
<br />Walk-in Closet
<br />FDN or Fdn.
<br />Foundation
<br />PLT HT or Pit. Ht.
<br />Plate Height
<br />WM or W.M.
<br />Wall Mounted (plumbing fixture)
<br />FG
<br />Fiberglass (Shower Pan)
<br />PSF
<br />Pounds per square foot
<br />WP
<br />Water Proofing)
<br />FIN
<br />Finished
<br />PT or P.T.
<br />Pressure Treated
<br />WS
<br />Water Softener
<br />FIN FLR or FF or fin. Fir. Finished Floor
<br />PW or P.W.
<br />Pre -wire
<br />WWF
<br />Welded Wire Fabric (Mesh)
<br />PLAN REVISIONS
<br />DATE VERSION DESCRIPTION
<br />08-20-15 1.0 NEW BASE PLAN
<br />12-8-15 2.0 ADDED VAULT. CLG.
<br />12-28-17 3.0 2017 FBC UPDATES
<br />02-21-18 4.0 ADDED GRADE BEAM 150 MPH ENG.
<br />08-27-19 4.1 ENG. REVIEW FOR 150-C MPH
<br />09-20-19 4.2 ADD 8'-8" ELEV. FOR TREVESTA
<br />D FE-1 El 1:1 E F71 FE7:1
<br />1:1 E 1:1 F[7::1 1:1 F] [7-11
<br />0 E 0 E: I IF: -]� F1711 17 1
<br />12-12-19 4.3 ELEV. B EXTEND ENTRY SLAB
<br />12-15-20 4.4 OVERHANG OVER SGD REV. TO 3' PER C.M.
<br />Ism
<br />12-19-20 5.0 FBC 2020 CODE UPDATE
<br />1941
<br />INDEX OF DRAWINGS
<br />SHEET DESCRIPTION
<br />SHEET
<br />No.
<br />CS COVER SHEET
<br />1 FLOOR PLAN
<br />2 INTERIOR ELEVATIONS
<br />3.1 EXTERIOR ELEVATIONS
<br />3.2 EXTERIOR ELEVATIONS
<br />F1 FOAM DETAILS
<br />4 ELECTRICAL PLAN
<br />5 ROOF PLAN
<br />6 FOUNDATION PLAN MONO
<br />7 ROOF FRAMING PLAN
<br />8 LINTEL PLAN AND DETAILS
<br />SN STRUCTURAL NOTES
<br />SN1 DETAILS
<br />S3 DETAILS
<br />S4 DETAILS
<br />S5 DETAILS
<br />SS RETROFIT DETAILS
<br />D1 SECTIONS & DETAILS
<br />WP WATERPROOFING DETAILS G
<br />PA1.0 PRODUCT APPROVAL NUMBERS
<br />PA1.1 PRODUCT APPROVAL NUMBERS
<br />PA1.2 PRODUCT APPROVAL NUMBERS
<br />MEAN ROOF 15 FT. HIGH TYPICAL
<br />FOR SINGLE STORY HOMES
<br />MEAN ROOF 30 FT. HIGH TYPICAL
<br />FOR 2 STORY HOMES
<br />THIS DRAWING AND DESIGN IS VALID
<br />FOR 12 MONTHS AFTER THE DATE IT
<br />IS SIGNED AND SEALED OR WHILE
<br />CURRENT CODE IS VALID
<br />CODE REFERENCES ARE SUMMARIES
<br />OF CODE SECTIONS.
<br />SEE FBCR (CURRENT VERSION) FOR
<br />COMPLETE CODE INFORMATION.
<br />Notice to Builder & All Subcontractors
<br />It is the intent of Designer/Engineer listed in the titieblock of these
<br />documents that these documents be accurate, providing Licensed
<br />Professionals clear information. Every attempt has been made to
<br />prevent error. The Builder and all subcontractors are required to
<br />review all the information contained in these documents, prior to
<br />the commencement of any work. The Designer/Engineer are not
<br />responsible for any plan errors, omissions,or misinterpretations
<br />undetected and not reported to the Designer / Engineer prior to
<br />construction. All construction MUST be in accordance to the
<br />information found in these documents. Any questions regarding
<br />the information found in these plans should be directed to our
<br />Office at (407) 880-2333 immediately. No backcharges will be
<br />considered for reimbursement by the Designer/Engineer without
<br />advanced notification and approval by the Designer/Engineer.
<br />Payments will be made in accordance to the terms of the
<br />agreement.
<br />Control of Construction Site:
<br />The Designer/Architect and engineer of record (EOR) have no
<br />control over the construction site and shall not be responsible in
<br />any manner for control of the construction site including, but not
<br />limited to, scheduling and sequencing of work, jobsite safety, and
<br />ventilation of the building and thereby shall not be responsible for
<br />the indoor air quality, or the effects thereof, for any reason
<br />whatsoever. The Designer/Architect and FOR has no duty to
<br />protect, without limitation, the residence, construction site,
<br />materials, or equipment, from moisture, mold, fungus, fire, theft,
<br />vandalism, trespass, or any other peril or condition, at any time,
<br />expressly including, but not limited to, the period of time before
<br />construction, during the construction of the project, or after
<br />construction and the Designer/Architect and FOR has no duty to
<br />take any action or preventive measures to protect such property
<br />against any such peril at any time for any reason.
<br />N
<br />0
<br />N
<br />a
<br />s
<br />I~E4yir6
<br />•�\Ci E N
<br />• • �� r
<br />t ip .7rJ©
<br />STATE OF :•� j :•
<br />r. +.
<br />To the best of the Engineer's knowledge, Information and belief,
<br />the structural plans and specifications contained within these
<br />drawings comply with the 2020
<br />Florida Building
<br />Code -
<br />Residential 7th Edition. Engineer's signature and seal is only for
<br />the structural engineering portions of the drawing pages bearing
<br />Engineer's signature and seal.
<br />N
<br />10
<br />QO
<br />V E
<br />C)M �
<br />v
<br />toF
<br />O r
<br />ci
<br />0
<br />N
<br />N or
<br />y �
<br />O J
<br />10
<br />at ", w
<br />M
<br />3 ,n w
<br />rA(N0 a
<br />M
<br />J a
<br />LL w
<br />rL Y
<br />4
<br />Q;
<br />1rJiLL
<br />vS cn
<br />wa W
<br />Z
<br />0
<br />0
<br />0
<br />0
<br />r m
<br />'m c5 cD
<br />0
<br />LL O -J
<br />W
<br />CO
<br />Q
<br />IL IL
<br />00
<br />N M Z
<br />a
<br />R fn O
<br />Z00
<br />U —J En
<br />W
<br />❑��
<br />z N O
<br />z
<br />z � �
<br />J —
<br />IN
<br />M
<br />z W
<br />(D�
<br />u-
<br />C
<br />W
<br />n a
<br />V
<br />�
<br />O—
<br />W
<br />N
<br />C w
<br />(�
<br />wigW
<br />to
<br />U
<br />J
<br />— O
<br />EEt "
<br />L
<br />z
<br />ICI
<br />C) N
<br />Q
<br />N
<br />��
<br />oco
<br />C.0
<br />Cl)o
<br />Z
<br />Z
<br /><
<br />LL
<br />Q E
<br />ZD
<br />Q O
<br />>N
<br />Q V
<br />?®
<br />E °03
<br />XO
<br />0UU
<br />o E
<br />a�
<br /><o
<br />o�
<br />wZ
<br />as L
<br />. �
<br />¢❑
<br />m0
<br />o
<br />oZ
<br />c
<br />C
<br />Nm
<br />Z'
<br />Z
<br />a�
<br />J
<br />¢
<br />a
<br />Z
<br />Cn
<br />wZ
<br />o�
<br />a0
<br />Q
<br />LL
<br />ww
<br />CY_
<br />w
<br />"
<br />"0
<br />Illlllllllll�
<br />o
<br />cD
<br />oz
<br />a
<br />o�
<br />C)
<br />V
<br />ZQ
<br />U�
<br />No
<br />>U-)
<br />m
<br />L
<br />�
<br />0
<br />CM
<br />0
<br />>
<br />O
<br />L
<br />m
<br />p
<br />*ft—i
<br />1a)
<br />E
<br />T
<br />r
<br />co O
<br />T—
<br />a,
<br />Un
<br />T—
<br />= M
<br />rn N
<br />r
<br />o�
<br />E
<br />=
<br />o
<br />Z
<br />Z
<br />Z
<br />o O
<br />E
<br />o
<br />�
<br />m
<br />cE
<br />U
<br />4i
<br />r-
<br />a
<br />q p
<br />JOB
<br />NO:
<br />21-2026
<br />SCALE :
<br />AS NOTED
<br />SHEET NO.
<br />C S
<br />
|