Laserfiche WebLink
i- <br />Nr <br />r <br />99260 <br />5 <br />04EHB <br />-HAYDEN <br />99 <br />g'y I <br />�F,o6 `dP I <br />HOMES <br />12602 <br />TELECOM [DRIVE, <br />!6a djT/g � �iJ <br />TAMPA, FL 33637 <br />Tel: <br />(813) 740-9720 Fax: <br />(813) 740-9715 <br />-STATE OF FLORIDA <br />CERTIFIED BUILDING CONTRACTOR: <br />DESIGN CRITERIA: <br />ABBREVIATIONS <br />REVISIONS <br />INDEX OF DRAWINGS <br />.PyL�OMMMG p�gNTIA4 <br />ABV. ABOVE LAV, LAVATORY <br />DATE <br />DESCRIPTION <br />DR HORTON HOMES <br />12602 TELECOM DRIVE <br />TAMPA, FL 33637 <br />TEL: (813) 740-9720 <br />FAX: (813) 740-9715 <br />\Mg, <br />H �/g1DA <br />! EDMON ( <br />-ALL 1IOM AND STATE CODES <br />-OCCUPANCY - RESIDENTIAL, GROUP R3 <br />-CONSTRUCTION TYPE - VB <br />-MIN. INTERIOR FINISH - CLASS B <br />-BASIC WIND SPEED - Vult=160 MPH <br />Vasd=124 MPH <br />-EXPOSURE - C <br />-1-STORY RESIDENCE - <br />-2-STORY RESIDENCE -MAX. HEIGHT AS PER IACAL <br />A/C <br />ADJ. <br />NT <br />HAD <br />CL <br />CAB. <br />CLG. <br />CLR <br />CONC. <br />CPT <br />C.T.DRICTaE <br />D. <br />D <br />AIR CONDITIONING LUM. <br />ADJUSTALTERNABLE <br />� <br />QE nNIT,ffN <br />BOARD <br />CENTERLINE MTD. <br />CABINET MIT. <br />CEILING N.T.S. <br />CLEAR O.c. <br />CONCRETE PL <br />CARPET P.B. <br />PH. <br />DRYER PLY. <br />DOABLE PLYWD. <br />LUMINOUS <br />ME�D�INAECT� T <br />MEhffTALLTTHRESHOLD <br />MOUNTED <br />METAL <br />NOT TO SCALE <br />ON CENTER <br />PROPERTY LINE <br />PUSH BUTTON <br />PHONE <br />PLATE <br />PLYWOOD <br />OgRSm <br />2-STORY CM CONVERSION <br />ARCHITECTURAL SHEET DESCRIPTION <br />01115/I6 <br />BID SET ISSUED <br />PG Cl—COVER SHEET <br />PG GN- GENERAL NOTES <br />PG Al -FIRST FLOOR PLAN <br />PG AlA-FLOOR PLAN SECTIONS/DETAILS <br />PG A2—SECOND FLOOR PLAN <br />PG ASH -FRONT &REAR ELEVATIONS "H" <br />PG A4H-LEFT &RIGHT ELEVATIONS "H" <br />02A3g8 <br />ADDED ELEV. 'J' 4 'K' WITH SIDING PER MARK Soma <br />02,70116 <br />BID SET RE -ISSUED <br />04AII18 <br />FOOTING REVISIONS PER M. MOMS <br />I-JOISTS INCORPORATE 0 INTO MASTER PLAN <br />0i!l6A8 <br />CONSTRUCTION DOCIi'tENTS RE -ISSUED <br />0g/IV68 <br />ADDED VALLEY FRAMING DETAIL, UPDATED BOLLARp DETAIL <br />01/2i/19 <br />DETAIL- 'ADDING BAR TO BOND BEAM' ADDED TO SI]A <br />AND STATE CODES <br />O, <br />DDL4, IA DUAL GLAZED PR m Pa <br />DIAMETER P.T. PRESSURE TREATED <br />PG El —FIRST FLOOR ELECTRICAL PLAN <br />DIM, <br />DISP. <br />DP <br />DR <br />D.S. <br />DTI. <br />D.W. <br />EA. <br />ELEV. <br />EQ. <br />Exx. <br />EXT. <br />F.G. FX, <br />F.G. <br />FIN. <br />FLR <br />FLUOR, <br />FR. DR. <br />FIG, <br />GA. <br />GAR DISP. <br />Q.F.I. <br />GL. <br />GYP. BD <br />H.B. <br />H.C. <br />HDR, <br />DMENSION R. <br />DISPOSAL RAD. <br />DEEP RA.Q. <br />DOOR REP. <br />DOWNSPOUT RM. <br />DETAIL R,o <br />DISHWASHER S.C. <br />EACH S.D. <br />ELEVATION sx <br />EQUAL SHT. <br />EXHAUST SHTHG. <br />EXTERIOR SHwR. <br />FIXED GLASS Sim <br />FUEL GAS SL. <br />FINISH SL.OL. <br />FLOOR STD. <br />FLUORESCENT SWS <br />FRENCH DOOR <br />FOOTING TEMP. <br />GAUGE THK. <br />GARBAGE DISPOSAL T.O.C. <br />GROUND -FAULT CIRCUIT T.OP <br />INTERRUPTER T.O.S. <br />GLASS T.O. <br />GYPSUM BOARD UN.O. <br />HOSE BIB <br />HOLLOW CORE V.P. <br />HEADER W. <br />RISER <br />RADIUS <br />RETURN Am GRILL <br />REFRIGERATOR <br />ROOM <br />ROUGH OPENING <br />SOLID CORE EXTDR <br />SMOKEDETECTOR <br />SINGLE HUNG <br />SHEET <br />SHEATHING <br />SHOWER <br />SIMILAR <br />SLIDING <br />SLIDING GLASS <br />STANDARD <br />SHEAR WALL <br />SECTION <br />TEMPERED GLASS <br />THICK <br />TOP OF CURB <br />TOP OF PLATE <br />TOP OPSI.AH <br />TYPICAL <br />UNLESS NOTED <br />OTHERWISE <br />VAPOR PROOF <br />WASHER <br />PG E2—SECOND FLOOR ELECTRICAL PLAN <br />PG Pi —PLUMBING PLAN <br />PG Ml—FIRST FLOOR MECHANICAL PLAN <br />PG M2-SECOND FLOOR MECHANICAL PLAN <br />PG DI —DETAILS <br />PG D2—DETAILS <br />PG D3—DETAILS <br />PG D4-PRODUCT APPROVAL LISTING <br />PG WAl—WALL ASSEMBLY DETAILS <br />PG WA2—WALL ASSEMBLY DETAILS <br />PG WA3—WALL ASSEMBLY DETAILS <br />PG WA4—WALL ASSEMBLY DETAILS <br />PG WA5—WALL ASSEMBLY DETAILS <br />PG WA6-WALL ASSEMBLY DETAILS <br />02R6/1% <br />PLAN MAINTENANCE <br />STATE OF FLORIDA <br />PROFESSIONAL ARCHITECT: <br />ROLAND A. ABOUCHACRA <br />AR No. 93723 <br />A.B. DESIGN GROUP, LLC. <br />A.B. NORTH GROUP, LC. BLVD. <br />RONALD8AO <br />LONGWOOD, FLORIDA 32750 <br />Tel: (407) 774-6078 <br />Fax: (407) 774-4078 <br />Cr ��/. �S <br />Q CtfLti. <br />03/2" <br />REVISED LINTEL SIZE AT FRONT ENTRY DOOR <br />04/1i/19 <br />UPDATED LEDGER BOLT SIZE 4 SPACWj <br />15T PLR. LIVING 1,104 SG. FT. <br />2Nri FLR LIVINCs I,50I SQ. FT. <br />TOTAL LIVING 2,605 86L FT. <br />GARAGE 431 SG. Ft <br />PORCH ELEVATION'H' III $G. FT. <br />TOTAL ELEVATION'H' 3,153 60. FT. <br />PATIO 8(d SQ. FT. <br />OiASM <br />REVISED I -JOIST LAYOUT <br />0 41AI <br />ADDED LED LIGHTS TO KITCHEN 4 BATHROOMS PER MARK BOWS <br />0T/13/M <br />ADDED STONE OPTION TO ELEVATIONS 'G','H','J' 4 K' <br />OBA3119 <br />LEDGER BOLT SPACING REVISED <br />10/25/15 <br />ADDED OPTS'-0' CEILING HEIGHTS <br />01/01/20 <br />REPLACE USP CONNECTORS WITH SIMPSCN CONNECTORS <br />03/MO <br />REVISED DETAIL ON SHEET D2 OPT. 8'-0' CLG. HST. <br />05RIA0 <br />WISED STAIRCASE AND STAIR SECTION DETAIL <br />01/01/21 <br />2020 FBC UPDATE <br />03/03a1 <br />ADDED SOFFIT DETAILS <br />STRUCTURAL SHEET # DESCRIPTION <br />03/05/21 <br />ADD FLAT HEADER • T-W A". (V -0' CLG ONLY) <br />PG Si —FOUNDATION PLAN <br />PG S1.IA-DETAILS <br />DRAWING / CONTRACT DOCUMENT <br />REVIEW BY BUILDER <br />xGT.ORHT <br />INSUL. <br />HEIGHT wi <br />INSULATION WD. <br />WITH <br />WOOD <br />PG S1.2-FIRST FLOOR DOWEL PLAN <br />THE BUILDER ASSUMES ALL LIABILITY FOR <br />INTERPRETATION OF THE CONTRACT DOCUMENTS. <br />INT. <br />INTERIOR WOW. <br />/H <br />W.I. <br />WINDOW <br />WATER T[RTER <br />ON <br />wxouGHTmox <br />PG S1.2A—DETAILS <br />PG S2-FIRST LIFT BE PLAN AND NOTES <br />PG S2.IA—DETAILS <br />IF ANY ASPECT OF THE CONSTRUCTION (AS <br />PG S2.2A—SAFE LOAD T LES <br />DESCRIBED IN THIS DRAWING SET) ARE UNCLEAR AND <br />IN NEED OF FURTHER DETAILING OR EXPLANATION IN <br />ORDER TO BUILD THIS PROJECT BASED ON THIS <br />DRAWING SET, THE CORRECT PROCEDURE IS FOR THE <br />PG S3—FIRST FLOOR FRA <br />PG S3.IA—DETAILS <br />PG S3.113—DETAILS <br />BUILDER TO SUBMIT A WRITTEN R.F.I. (REQUEST FOR <br />PG S3.1C—DETAILS <br />INFORMATION) TO THE ARCHITECT OR ENGINEER FOR <br />PG S4—SECOND FLOOR DECK PLAN <br />CLARIFICATION. <br />PG S4.2—SECOND FLOOR DOWEL PLAN <br />AB DESIGN GROUP WILL RESPOND TO ALL WRITTEN <br />RFI's IN WRITTEN/DRAWN FORMS IN A TIMELY <br />PG S5—SECOND LIFT BEAM PLAN AND NOTES <br />PG S5.IA—SAFE LOAD TABLES <br />MANNER. AB DESIGN GROUP TAKES NO <br />PG 36—ROOF FRAMING PLAN <br />RESPONSIBILITY FOR INTERPRETATIONS OF <br />PG SNI—DETAILS <br />CONSTRUCTION BY THE BUILDER WHEN NO RFI's HAVE <br />BEEN GENERATED FOR UNCLEAR ASPECTS OF THE <br />PG SDI —SOFFIT DETAILS <br />ONSTRUCTION BASED ON THE DRAWING SET. <br />U N. RONALD REAGAN SL <br />LONGWOOD, FL32750 <br />PH: 407-774-6078 <br />FAX: 407-7744078 <br />www.abdesigngroup.com <br />AA #: 0003325 <br />C, <br />y <br />O <br />Q <br />i <br />a <br />$USIDIV. & LOT: <br />ABBOTT <br />PARK <br />LOT# 28 <br />BLK# 9 <br />PROJECT# <br />04181.000-28091 <br />MODET_ <br />4EHB <br />"2605-HAYDEN <br />GARAGE SAYING: <br />LEFT <br />PAGE: <br />COVER <br />SHEET <br />60 YXII E <br />mm <br />PRINT 06 14 21 <br />,14 <br />DATE: / / <br />SCALE: 1/4"=l'-O" <br />SHEET <br />c1 <br />