Laserfiche WebLink
99 <br />1828-4EBB-CAL1991 <br />�y <br />HOMES <br />A�� <br />12602 TELECOM <br />DRIVE, TAMPA, FL 33637 <br />Tal= (813) 740-9720 <br />Fax- (813) 740-9715 <br />STATE OF FLORIDA <br />CERTIFIED BUILDING CONTRACTOR: <br />DESIGN CRITERIA: <br />ABBREVIATIONS <br />REVISIONS <br />INDEX OF DRAWINGS <br />-In► BU MM CODE, 1,, <br />ABV. ABOVE LAV. LAVATORY <br />DATE <br />DESCREMOx <br />•M �� (2=) <br />-ALL. LOCAL. AND SPATE COM <br />A/C <br />LT. <br />AIR CONDITIONING <br />ALTERNATE <br />LUM. <br />M.C.I. <br />LUMINOUS <br />MEDICINECABINET <br />PJIlI6A9 <br />CD'8t88UFD <br />ARCHITECTURAL SHEET DESCRIPTION <br />0U6AB <br />2M7f1 F9O UPDATE <br />DR HORTON HOMES <br />12602 TELECOM DRIVE <br />TAMPA, FL 33637 <br />TEL: (813) 740-9720 <br />FAX: 813 740-9715 <br />( ) <br />-OCCUPANCY - RBSIDENPfAL GROUP R3 <br />-CONSTRUCTION TYPE - VB <br />-YIN. INTERIOR FINISH - CLASS B <br />'BASIC WIND SPEED - volt=180 MPH <br />Yard=124 MPH <br />-1a03URE - C <br />-I-STORY RESIDENCE - <br />-2-STORY REMENCE - MAX. MGRT AS PER LOCAL <br />AND STATE CODES <br />AMP. <br />BD. <br />CL <br />CAB. <br />CLG. <br />CLR <br />CONC. <br />CPT. <br />C.T. <br />D. <br />DBL. <br />D.G. <br />DIA. <br />DIM. <br />AMPERAGE <br />BOARD <br />CENTERLINE <br />CABINET <br />CEILING <br />CLEAR <br />CONCRETE <br />CARPET <br />CERAMIC TILE <br />DRYER <br />DOUBLE <br />DUAL GLAZED <br />DIAMETER <br />DIMENSION <br />MIN. <br />M.T. <br />MTD. <br />MTL. <br />O.C. <br />OC <br />PL <br />P.B. <br />PH. <br />PLT. <br />PLYWD. <br />P. <br />P.T. <br />IL <br />MINIMUM <br />T <br />METAL MOUNTED <br />MOUNTED <br />MOTAL <br />ONCENTT TO R <br />ON CENTER <br />PROPERTY LINE <br />PUSH BUTTON <br />PHONE <br />PLATE <br />PLYWOOD <br />PAIR <br />PRESSURE TREATED <br />RISER <br />PG Cl-COVER SHEET <br />PG AI -GENERAL NOTES <br />PG Al -FLOOR PLAN <br />PG A2C-ELEVATIONS "C" <br />PG El -ELECTRICAL PLAN <br />PG Pi -PLUMBING PLAN <br />PG MI -MECHANICAL PLAN <br />PG DI -DETAILS <br />PG D2—DETAILS <br />PG D3-PRODUCT APPROVAL <br />(MbA9 <br />CDSR{-I851FD <br />(u/eul6 <br />SCNGELEVATIONSADOED <br />0MAD <br />COSRE-ISSUED <br />04/Blb <br />FOOTNCs REV" PER M. BOUEB <br />a,�5 <br />WgFE-RFD <br />02/" <br />ADDED ASS FOORR AT GARAGE OVAL (FORT MYERII) <br />CMAS <br />PLAN MANTBNANCE <br />OVAM <br />REvuED LNTEL SIDE AT FRONT ENTRY DOOR <br />DISP. <br />DP. <br />DR <br />D.S. <br />DTI. <br />D.W. <br />DISPOSAL <br />DEEP <br />DOOR <br />DOWNSPOUT <br />DETAIL <br />DISHWASHER <br />EACH <br />RAD. <br />RA.G. <br />REF. <br />RM. <br />S.C. <br />S.D. <br />RADIUS <br />RETURN AIR GRILL <br />REFRIGERATOR <br />ROOM <br />ROUGH OPENING <br />SOLIDCOREEXTDR <br />SMOKE <br />PG WA1-WALL ASSEMBLY DETAILS <br />PG WA2-WALL ASSEMBLY DETAILS <br />PG WA3-WALL ASSEMBLY DETAILS <br />PG WA4-WALL ASSEMBLY DETAILS <br />PG WA5-NOT USED <br />STATE OF FLORIDA <br />PROFESSIONAL ARCHITECT: <br />+ <br />SQ.FT. CALL• S <br />' <br />ADDED ADDITIONAL RECEPTALLE INGARAGE PER UNLL BAT80N (hELB.) <br />(9Nfl4/19 <br />REVISED HVAC vourEs ON SOFT cAlc BCFIEDIA.E OMEIDETAILR.O. <br />OS/12/1% <br />ADDED 'EXTERIM MOW DEEP FOOTER' DETAIL 12/6114 (ORL) <br />064M <br />ADDED LED L*M • KITCHEN 4 BATH PER MARK ROUES <br />ROLAND A. ABOUCHACRA <br />AR No. 93723 <br />EA. <br />ELEv. <br />EQ. <br />EXH. <br />EXT. <br />F.GJFX. <br />ELEVATION <br />EQUAL <br />EXHAUST <br />EXTERIOR <br />FIXED GLASS <br />S.H. <br />SHT. <br />SHTHG. <br />SHWR <br />SIM. <br />DETECTOR <br />SINGLE HUNG <br />SHEET <br />SHEATHING <br />SHOWER <br />SIMILAR <br />PG WA6-WALL ASSEMBLY DETAILS <br />01AS 9 <br />ADDED STONE OPTION ELEVATION C 4 D (TAMPA) <br />®yIUB,EyATiQi'G•$IDB'ia-ADDEDLOWER.ifABLEI'd00F <br />10/M/I9 <br />.ADDED OPT. W-V CEILRG iIEr4M <br />A.B. DESIGN GROUP, LLC. <br />1441 NORTH RONALD REAGAN BLVD. <br />LONGWOOD, FLORIDA 32750 <br />Tel: (407) 774-6078 <br />Fax: (407) 774-4078 <br />LIVING I.828 $�• FT. <br />GARAGE 43® 9Q PT. <br />ENTRY Ib S, FT. <br />1AN°I ESQ FT. <br />TOTAL 2r362 SOL PT. <br />F.G. <br />FF1, <br />FLUOR. <br />FR. DR. <br />FTG. <br />GA, <br />GAR <br />G.F.I. <br />GL. <br />GYP. BD. <br />H.C. <br />HD R <br />FUEL GAS <br />FIN <br />FLUORESCENT <br />FRENCH DOOR <br />FOOTING <br />GAUGE <br />GARBAGE GARBAGE DISPOSAL <br />INTOERRRUPTEARTC CIRCUIT <br />GLASS <br />GYPSUM BOARD <br />HOSE BIB <br />HOLLOW CORE <br />HEADER <br />S. <br />STD L <br />SWS <br />TEMP. <br />THK. <br />T.O.C. <br />TOP. <br />T. <br />YP <br />U.N.O. <br />V.P. <br />W. <br />SLIDING <br />ST'ANDARD DING S <br />SHEAR WALL <br />SECTION <br />TEMPERED GLASS <br />THICK <br />TOP OF CURB <br />TE <br />ToT.O.S. TOP OF SLOFFLAABB <br />TYPICAL <br />UNLESSNOTED <br />OTHERWISE <br />VAPORPROOF <br />WASBER <br />NRroI�o <br />uSr cocTaRS u#tH SE PSCN�� <br />ONMIRO <br />REVUfE ENKAVBNT RADON PLAN DI BNSIQNS <br />0NM94a <br />OFT. W-(Y CLG, HGt- ADDED LED Lrwr IN FOYER <br />0U0" <br />OPT W-O' CL& HGT. ELEVATION •C'- REVISED HEIGHT OF ARCHWAY <br />SUft/ o <br />ADDED ELEVAT06 V # M' (oft) <br />STRUCTURAL SHEET # DESCRIPTION <br />pT W <br />ADDED ELEVATIONS (Oft)H.B. <br />PG Sl-FOUNDATION PLAN <br />PG SIJA—DETAILS <br />DRAWING / CONTRACT DOCUMENT <br />&MI <br />MV FW UPDATE <br />REVIEW BY BUILDER <br />MT. OR HT <br />INSUL. <br />INT. <br />HEIGHT <br />INSULATION <br />INTERIOR <br />W/ <br />WD. <br />WDW. <br />WITH <br />WOOD <br />WINDOW <br />PG S1.2—DOWEL PLAN <br />PG S1.2A—DETAILS <br />THE BUILDER ASSUMES ALL LIABILITY FOR <br />W/H <br />WATER RATER <br />PG S2—LIFT BEAM PLAN AND NOTES <br />INTERPRETATION OF THE CONTRACT DOCUMENTS. <br />W.I. <br />WROUGHT IRON <br />PG S2.IA—DETAILS <br />IF ANY ASPECT OF THE CONSTRUCTION (A3 <br />DESCRIBED IN THIS DRAWING SET) ARE UNCLEAR AND <br />IN NEED OF FURTHER DEfAIING OR EXPLANATION IN <br />ORDER TO BUILD THIS PROJECT BASED ON THIS <br />DRAWING SET, THE CORRECT PROCEDUIW IS FOR THE <br />PG S2.2A—SAFE LOAD TABLES <br />PG S3—FRAMING PLAN <br />PG S3. —DETAILS <br />PG S3.IB—DETAILS <br />PG SNl —DETAILS <br />BUILDER TO SUBMIT A WRITTEN R.F.I. (REQUEST FOR <br />INFORMATION) TO THE ARCHITECT OR ENGINEER FOR <br />CLARIFICATION. <br />AS DESIGN GROUP WILL RESPOND TO ALL WRITTEN <br />RFI'a IN WRITTEN/DRAWN FORMS IN A TIMELY <br />MANNER. AS DESIGN GROUP TAKES NO <br />RESPONSIBILITY FOR INTERPRETATIONS OF <br />CONSTRUCTION BY THE BUILDER WHEN NO RFI's HAVE <br />BEEN GENERATED FOR UNCLEAR ASPECTS OF THE <br />ONSTRUCTION BASED ON THE DRAWING SET. <br />I N.RONALD REAGAN 8I <br />LONGWOOD, FL 32750 <br />PH: 407-774-W78 <br />FAX 407-7744078 <br />wwwabdeslgngroup.com <br />AA #t: 0003325 <br />y <br />64 <br />aUSDriv ee :.oar <br />ABBOTT PARK <br />LOT #28 <br />BLK. #11 <br />PROJECT# <br />04181.000-28111 <br />MODE1L <br />4EBB <br />"1828-CALI" <br />GARAGE 93'WMG: <br />RIGHT <br />PAGE: <br />COVER <br />SHEET <br />160 H E . C <br />