Laserfiche WebLink
INDEX OF DRAWINGS <br />SHEET DESCRIPTION <br />SHEET <br />No. <br />CS <br />COVER SHEET <br />1.1 <br />— — <br />FIRST FLOOR PLAN <br />1.2 <br />SECOND FLOOR PLAN <br />2.1 <br />EXTERIOR ELEVATIONS - FRONT & LEFT <br />2.2 <br />EXTERIOR ELEVATIONS - REAR & RIGHT <br />3 <br />4 <br />ELECTRICAL PLAN <br />ROOF PLAN <br />5 FOUNDATION PLAN <br />6.1 FLOOR FRAMING PLAN <br />6.2 ROOF FRAMING PLAN <br />7 LINTEL PLAN & DETAILS {�e <br />SN STRUCTURAL NOTES — 1 <br />ABBREVIATIONS — --- — -- ----- —�' <br />SN1 DETAILS s <br />AB or A.B, Anchor Bolt FIX or FXD Fixed PWDR or Pwd. Powder Room S3 DETAILS <br />ABV orAbv. Above FLR or Fir. Floor RA or R/A or R.A. Return Air S4 DETAILS <br />AC or A/C Air -Conditioner FLR SYS or Fir Sys Floor System RAD or Red. Radius - — --- ----- ------- <br />ADJ orADJ. Adjustable FOM or F.O.M. Face Of Masonry RAG or Rag. Return Air Grill S5 DETAILS <br />AFF or A.F.F. Above Finished Floor FP or F.P. Fireplace REC or Rec. Recessed S61M DETAILS <br />AHU or A.H.U. Air Handler Unit FR DR French Door RECEPT Receptacle --- -- --- <br />ALT orALT. Alternate FRT Front REF or Ref. Refrigerator ST STAIR DETAILS <br />BC Base Cabinet FT or Ft. Foot/ Feet REINF Reinforcing <br />BF B'Ifold Door FTG or Ftg. Footing REQD or Req'd. Required SS RETROFIT DETAILS <br />BK SH or Bk Sh BookShelf FXD GL Fixed Glass RM or Rm. Room D 1 SECTIONS & DETAILS <br />BLK or BLK. Block GALV or Galy. Galvanized RND or Rnd. Round_OeD2 SECTIONS &DETAILS <br />BLW or BLW. Below GC or G.C. General Contractor RO or R.O. Rough Opening <br />BM or Bm. Beam GFI or G.F.I. Ground Fault Interrupter RS, R/S, R/SH or R&S Rod and Shelf _ _ _ _ _ WP WATERPROOFING DETAILS <br />BOT or Bot. Bottom GT or G.T. Girder Truss SD or SO. Smoke Detector -- ----- - - -- - <br />BP or B.P. Bypass (door) GYP BD or Gyp. Bd. Gypsum Board SGD Sliding Glass Door PA1.0 PRODUCT APPROVAL NUMBERS <br />BRG or BRG. Bearing HB Hose Bibb SH or Sh. Shelves PA1.1 PRODUCT APPROVAL NUMBERS <br />C Carpet HDR or Hdr. Header SHT Sheet ----- ---- ---- <br />CAB Cabinet HGT or Mgt. Height SHWR or Shwr. Shower PA1.2 PRODUCT APPROVAL NUMBERS <br />CIR or Cir. Circle HH or H.H. Hand Held (plumbing faucet) SL orS.L. Side Lights SH1.0 HURRICANE SHUTTER PRODUCT APPROVAL <br />CJ or C/J Control Joint HORIZ Horizontal SPECS or SPECS. Specifications ----- ---- ------ ------------------- <br />CLG or Clg. Ceiling HS Hard Surface (flooring) SPF or S.P.F. Spruce Pine Fir SH1.1 HURRICANE SHUTTER PRODUCT APPROVAL <br />CMU Concrete Masonry Unit ILO In Lieu Of SQ FT or SF or S.F. Square Foot (feet) SH 1.2 HURRICANE SHUTTER PRODUCT APPROVAL <br />COFF or Coff. Coffered or Tray Ceiling INSUL or Insul. Insulation SQ or Sq. Square _ _ <br />COL or Col. Column INTorInt. Interior STO Storage SH1.3 HURRICANE SHUTTER PRODUCT APPROVAL <br />COMM orComm. Community K/WALL or K/Wall Kneewall SW or S.W. Shear Wall SH1.4 HURRICANE SHUTTER PRODUCT APPROVAL <br />COMP or Comp. Compressor KS or K.S. Knee Space SYP or S.Y.P. Southern Yellow Pine <br />CONN orCONN. Connection LAUN orLaun. Laundry TB Towel Bar SH1.5 HURRICANE SHUTTER PRODUCT APPROVAL <br />CONT or Cont. Continuous LAV or Lay. Lavatory TEMP or Temp. Tempered -- - --- -------------- --- -- -- - ---------- — <br />CT or C.F. Ceramic Tile LF or L.F. Linear Ft. THIKN or Thik'n. Thicken \ <br />D or D. Dryer LL Lintel Length TOB or T.O.B. Top of Block <br />DB Door Bell LT Laundry Tub TOM or T.O.M. Top of Masonry O \ <br />DBL or Dbl. Double MAS or Mas. Masonry TOP or T.O.P. Top of Plate <br />DCF Decorative Cementitious Finish MAX or Max Maximum TP Toilet Paper Holder — — O O \ \ \ \ <br />DEC or Dec. Decorative MC Medicine Cabinet TR Towel Ring <br />DED or Ded. Dedicated (outlet) MFR or Mfr. Manufacturer TRANS WDW or Trans. Transom Window <br />DIAorDia. Diameter MGT Management (room) TYPorTyp. Typical ------------------------------------------ -- <br />DISP or Disp. Disposal MIN or Min Minimum UC or u.c. Under Counter <br />DIST or Dist. Distance MIR or Mir. Mirror UCL Under Cabinet Lighting <br />DMF Decorative Masonry Finish ML or M.L. Microlam UNO or U.N.O. Unless Noted Otherwise a n n - - -- ---- -- ---- - - - — <br />DS or D:S. Drawer Stack MONO or Mono Monolithic V or v. Valve (shower or tub/shower) l <br />DTL Detail MW or MICRO or Micro. Microwave VB Vanity Base 1 I \ 1 <br />DV or D.V. Dryer Vent NITS or N.T.S. Not to Scale VERT or Vert. Vertical U U <br />DVP or D.V.P. Diverter Valve (plumbing) OE or O.E. Owner's Entry VL or V.L. Versalam MEAN ROOF 15 FT. HIGH TYPICAL <br />DWorD.W. Dishwasher OPNGorOpn'g. Opening VTRorVTE Vent through Roof/Exterior Ll El El L] L] El El :71 FOR SINGLE STORY HOMES <br />EA or Ea. Each OPT or Opt. Optional W or w Washer <br />ELECorElec. Electrical PC Pull ain W/orw/ With EIF—]E:] <br />MEAN ROOF 30 FT. HIGH TYPICAL <br />ELEV or Elev. Elevation FED or Ped. Pedestal <br />eststal WA or W.A. Wedge Anchor � � FOR 2 STORY HOMES <br />EQ Equal PH Phone WC or WIC or W. C. Water Closet (toilet) <br />EWorE.W. Each Way PKTorPkt. Pocket (Door) WDorWd Wood THIS DRAWING AND DESIGN IS VALID <br />EXP or Exp. Expansion PL or P.L. Pound m WH HDR orW. rWbW. HDR. Window Header �I FOR 12 MONTHS AFTER THE DATE IT <br />EXT or Ext. Exterior PLF Pounds per linear foot WH or W.H. Water Heater <br />FBC Florida Building Code PLNT SHLF or Pit. Sh. Plant Shelf WIC or W.I.C. Walk-in Closet IS SIGNED AND SEALED OR WHILE <br />FDN or Fdn. Foundation PLT HT or Pit. Ht. Plate Height WM or W.M. Wall Mounted (plumbing fixture) CURRENT CODE IS VALID <br />FIG Fiberglass (Shower Pan) PSF Pounds per square foot WP WaterProof(ing) CODE REFERENCES ARE SUMMARIES <br />FIN Finished PT or P.T. Pressure Treated WS Water Softener OF CODE SECTIONS. <br />FIN FLR orFF or Fin. Fir, Finished Floor PW or P.W. Pre -wire WWF Welded Wire Fabric (Mesh) SEE FBCR (CURRENT VERSION) FOR <br />PLAN REVISIONS COMPLETE CODE INFORMATION. <br />DATE VERSION DESCRIPTION Notice to Builder & All Subcontractors <br />It is the intent of Designer/Engineer listed in the titleblock of these <br />08/23/ 12 1.00 NEW BASE PLAN documents that these documents be accurate, providing Licensed <br />Professionals clear information. Every attempt has been made to <br />prevent error. The Builder and all subcontractors are required to <br />review all the information contained irl these documents, prior to <br />07/30/ 15 1.1 2015 NEW CODE UPDATE the commencement of any work. The Designer/Engineer are not <br />responsible for any plan errors, omissions,oromisinterpretations <br />undetected and not reported to the Designer / Engineer prior to <br />05/09/ 18 2.0 FBC 2017 CODE UPDATES a construction. All construction MUST be in accordance to the <br />information found in these documents. Any questions regarding <br />the information found in these plans should be directed to our <br />be <br />12/19/20 3.0 FBC 2020 CODE UPDATES Office at dfo reimbursement <br />immediately.Nogner/E gineerrges ili h <br />considered for reimbursement by the Designer/Engineer without <br />advanced notification and approval by the Designer/Engineer. <br />Payments will be made in accordance to the terms of the <br />agreement. <br />Control of Construction Site <br />The Designer/Architect and engineer of record (EOR) have no <br />control over the construction site and shall not be responsible in <br />any manner for control of the construction site including, but not <br />4 rq J% r4 limited to, scheduling and sequencing of work, jobsite safety, and <br />ventilation of the building and thereby shall not be responsible for <br />the indoor air quality, or the effects thereof, for any reason <br />whatsoever. The Designer/Architect and FOR has no duty to <br />protect, without limitation, the residence, construction site, <br />materials, or equipment, from moisture, mold, fungus, fire, theft, <br />vandalism, trespass, or any other peril or condition, at any time, <br />expressly including, but not limited to, the period of time before <br />construction, during the construction of the project, or after <br />construction and the Designer/Architect and FOR has no duty to <br />take any action or preventive measures to protect such property <br />against any such peril at any time for any reason. <br />Care and Maintenance <br />Yearly maintenance and inspections by the builder/homeowner <br />are necessary for the future life of this home. Care must be taken <br />to check windows and doors for caulking, remove leaves and <br />debris off roofs, make sure that water flow is away from the <br />house and have your home repainted every 3 - 5 years to protect <br />2074 the coatings. The designer and engineer of record are not <br />responsible for the upkeep of the home and will not be held <br />liable for instances that may occur over the normal life of the <br />home without proper maintenance. <br />c� <br />c.e <br />� <br />0 <br />-o <br />C*4 <br />o= <br />a� o <br />to a <br />CID -M <br />ca <br />0 <br />``a rZC VV A <br />a <br />^°O ' <br />ew <br />CNJ <br />or <br />�! <br />eLin <br />To the best of the Engineers knowledge, information and belief, <br />the structural <br />plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code <br />- <br />Residential <br />7th Edition. Engineer's signature and seal <br />is only for <br />the structural <br />engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />W �E <br />a 03 <br />N 0 <br />� <br />00 N <br />0M <br />) <br />l.� <br />.�i M LL � 2 a- <br />S <br />Zmcrn a (Y!J <br />C13 <br />Ig :��� <br />N Z; <br />W 00 T CT m <br />ILno <br />Z Co MZ ¢ <br />ZN O V ofco) <br />W ❑❑ <br />0 <br />z <br />z o <br />=C <br />J <br />N <br />N z a <br />fa r-U m <br />� <br />U m <br />O w o <br />t.n) � <br />� <br />wra <br />c� <br />wE <br />V �•,.. <br />d <br />0 p N <br />N 0 <br />m <br />sm <br />o <br />w <br />Ch <br />M <br />J <br />z q <br />p {S <br />Z <br />Q <br />E U <br />¢ <br />w� <br />-0 <br /><OD <br />zo <br />z® <br />oa <br />H <br />r--- 1 <br />- <br />�o <br />X U <br />¢ ¢ <br />= U <br />O <br />O E <br />N <br />i <br />az <br />¢ p <br />�¢ <br />x, <br />Z <br />W W <br />:3 tv <br />o <br />m O <br />��ZZ <br />- C <br />�m <br />>Z <br />Z <br />C L <br />oU <br />LLa <br />N W <br />W <br />> <br />rM <br />�o <br />k <br />30 �— <br />oLL <br />w <br />= <br />. <br />IIt� <br />CD <br />V <br />L <br />za <br />a <br />0$ <br />c C� <br />M, <br />�\ <br />rn <br />m <br />CIO <br />00 <br />< <br />rr�^ <br />N <br />O <br />O <br />N <br />.� <br />04 <br />C)N <br />N <br /><C <br />n <br />M <br />Z <br />E T <br />m <br />a <br />E <br />U J Q 0 <br />_J <br />JOB <br />NO: 22-06454 <br />SCALE : AS NOTED <br />SHEET NO. <br />17\ <br />" <br />C <br />