Laserfiche WebLink
ABBREVIATIONS GENERAL NOTES VERSION CHANGES INDEX OF DRAWINGS <br />ABV - ABOVF MLDG - MOULDING THE FOLLOWING TECHNICAL CODES SHALL APPLY: VERSION DESCRIPTION OF CHANGES SHT NO: TITLE <br />AFF - ABOVE: FINISH FLOOR MNT - MOUNT OR MOUNTING 1.0 PLAN REVISIONS CS COVER SHEET <br />AHU -AIR HANDLER UNIT MO - MASONRY OPENING Al FOUNDATION PLAN F P(� N <br />A/C - AIR CONDITIONING MUNT - MUNTINS 2020 FLORIDA BUILDING CODE RESIDENTIAL, PLUMBING, MECHANICAL, FUEL GAS, 2.0 TYPICAL TRUSS CONNECTOR REVISION 3� - <br />A2 1ST FLOOR PLAN <br />ALUM -ALUMINUM # -NUMBER ENERGY EFFICIENCY, ACCESSIBILITY, AND NFPA 70 NATIONAL ELECTRICAL CODES 2017 r` • �' <br />T A 0 ELEVATION ENTRY PORCH ROOF UPDATE A3 2ND FLOOR PLAN <br />AT - ALUMINUM THRESHOLD OC - ON CENTER 3�kr%`j J DO ``,�p U) <br />A4 ROOF PLANti.� <br />AB - ANCHOR BOLT OGD - OVERHEAD GARAGE DOOR 2020 FBC PLUMBING RESIDENTIAL SECTION 604 4.0 FLORIDA BUILDING CODE 7TH EDITION 2020 UPDATE �� �2 `, o <br />AVG -AVERAGE OPNG - OPENING 1. TANK TYPE WATER CLOSET VOLUME ( ) A4.1 2ND FLOOR FRAMING &ROOF PLAN <br />i <br />BFE - BASE FLOOD ELEVATION OPP - OPPOSITE 1.6 GALLONS 5.0 ADDING K, L, M ELEVATIONS A5 EXTERIOR ELEVATIONS ; . Lo <br />BM - BEAM OPT - OPTIONAL A6 1ST FLOOR ELECTRICAL PLAN <br />BLK - BLOCK OH - OVER HANG 6.0 ADDED SHEETS WP2.0 AND WP2.1 TO SHEET INDEX A6.1 2ND FLOOR ELECTRICAL PLAN � ' wJl�oGS <br />2. WATER -FLOW RATE. � ,� • � ¢ <br />BLDG - BUILDING OH CABS- OVERHEAD CABS SNO STRUCTURAL NOTES �'/ <br />BIRD - BOARD PNT - PAINT FINISH 9 <br />PUBLIC FACILITIES LAV 0.5 G.P.M. SN1 STRUCTURAL NOTES 44 Z <br />BRIG - BEARING PTD - PAINTED <br />PRIVATE FACILITIES LAV 2.2 G.P.M. F°' -�' -` W <br />S3M FOUNDATION DETAILS <br />BTM - BOTTOM PED -PEDESTAL SHOWER HEADS 2.5 G.P.M. <br />S4 FRAME WALL DETAILS O <br />BUC - BUILT UP COLUMN PERF -PERFORATED 0 <br />CAB -CABINET PLT • PLATE 3. ALL PLUMBING WATER LINES S5 ROOF FRAMING DETAILS <br />CD - CONSTRUCTION DOCUMENTS PLYWD - PLYWOOD TO BE CPVC S6 WALL SECTION DETAILS <br />CLG - CEILING PKT -POCKET SS RETRO FIT DETAILS W <br />CLG HT - CEILING HEIGHT LB -POUND VTR LOCATIONS ARE APPROXIMATE AND MAY CHANGE DUE TO ST STAIR DETAILS o <br />CEMT - CEMENTITIOUS PSF - POUNDS PER SQUARE FOOT JOBSITE CONDITIONS S11 PRECAST DETAILS z <br />CL - CENTERLINE PSI - POUNDS PER SQUARE S12 PRECAST DETAILS <br />COL - COLUMN PT - PRESSURE TREATED THE FOLLOWING SHALL COMPLY WITH THE 2020 FBC RESIDENTIAL PA1.0 PRODUCT APPROVAL <br />CONC - CONCRETE PB - PUSH BUTTON CODE PA1.1 PRODUCT APPROVAL <br />CMU - CONCRETE MASONRY UNIT REF - REFRIGERATOR <br />CONST - CONSTRUCT OR CONSTRUCTION RECP -RECEPTACLE Q PORCHES AND BALCONIES PA1.2 PRODUCT APPROVAL 0> p o U <br />CONT -CONTINUOUS OR CONTINUES REINF -REINFORCING CHAP. 3 PA1.3 PRODUCT APPROVAL 0 M <br />cq <br />CTR -CENTER REQD - REQUIRED PA1.4 PRODUCT APPROVAL ,� H co <br />CJ - CONI ROL JOINT R/A - RETURN AIR Q HANDRAILS - CHAP. 3 PA1.5 PRODUCT APPROVAL - ) M U M <br />DP - DEEP OR DEPTH RO - ROUGH OPENING SH 1.0 HURRICANE SHUTTERS E c C <br />DTL - DETAIL RS - ROUGH SAWN SH 1.1 HURRICANE SHUTTERS .� 6 : <br />DIA - DIAMETER SC - SOLID CORE Q GUARDRAILS - CHAP. 3 -p u o o Q <br />SH 1.2 HURRICANE SHUTTERS �_ � � Q <br />[:]STAIRS - CHAP. 3 SH 1.3 HURRICANE SHUTTERS N V w - H <br />DIM -DIMENSION SCP -SCUPPER SH 1.4 HURRICANE SHUTTERS •� ` � E ^ � � <br />DISCON-DISCDNNECT SCRN -SCREEN <br />DW - DISHWASHER SIM - SIMILAR <br />DR - DOOM SHLVS -SHELVES Q CHIMNEY & FIREPLACE SH 1.5 HURRICANE SHUTTERS � c a <br />DBL - DOUI3LE S/R - SHELF & ROD CHAP. 10 WP1.0 WATERPROOFING DETAILS <br />DWG - DRA\VING SH - SINGLE HUNG WINDOW WP2.0 WATERPROOFING DETAILS <br />EA -EACH SGD - SLIDING GLASS DOOR Q EGRESS WINDOWS WP2.1 WATERPROOFING DETAILS <br />ELEC - ELECTRICAL SPECS - SPECIFICATIONS CHAP. 3 <br />ELEV - ELEVATOR SQ FT - SQUARE FEET <br />EQ - EQUAL SQ IN - SQUARE INCH 5. ALL OPENINGS SHALL COMPLY WITH 2O20 FBC RESIDENTIAL WIND LOADS AS � <br />EQUP - EQUIPMENT STD -STANDARD STATED BELOW. ATTACHMENTS OF WINDOWS, DOORS, SLIDING GLASS DOORS � <br />EXP JT - EXPANSION JOINT STL -STEEL AND O.H. GARAGE DOORS ARE TO DELEGATED THE MANUFACTURER OF THESE <br />EXT - EXTERIOR STRUCT -STRUCTURAL ITEMS. THE MANUFACTURER OF THESE ITEMS SHALL SUBMIT ATTACHMENTS FOR <br />FIN FLR - FINISHED FLOOR TEMP -TEMPERED SITE INSTALLATION. t� <br />FIN - FIN THK - THICK OR THICKNESS <br />EW - EACH WAY TB - TOWEL BAR SEE ATTACHED SPECIFICATION SHEETS FOR MANUFACTURERS DESIGN CRITERIA `� G <br />FG -FIXED GLASS TOC -TOP OF CONCRETE AND INSTALLATION METHODS FOR WINDOWS, DOORS, SLIDING GLASS DOORS, �, ✓ <br />FD - FLOUR DRAIN TOM - TOP OF MASONRY OVERHEAD GARAGE DOORS, AND ROOFING. <br />FE - FIRE EXTINGUISHER TOP - TOP OF PLATE �i <br />FLR -FLOOR TP - TOILET PAPER HOLDER <br />FLOUR - FLUORESCENT TYP - TYPICAL 6. ALL DOORS INTERIOR & EXTERIOR ARE 6'-8" UNLESS OTHERWISE NOTED ALL <br />FTG - FOOTING UNO - UNLESS NOTED OTHERWISE SHOWER ENCLOSURES TO BE TEMPERED GLASS w° w w 2 o 0 <br />FIR DR - FRENCH DOOR VAC -VACUUM W t1I W w o m a m a a Y z o z <br />GALV - GALlANIZED VAL -VALANCE 7. ALL WINDOWS WITHIN 24" OF DOORS INTERIOR & EXTERIOR AND WITHIN 18" OF < U ¢ CY R -� 0 2 � 2 2 2 LL UQ 0 L- J O_ <br />GA -GAUGE VERT -VERTICAL FLR TO BE TEMPERED GLASS. (SECTION R308) I- 'o w z w - z z a <br />( ) Q � Z LL Ii - Z � ,� F- <br />GB -GRAB BAR VIF -VERIFY IN FIELD C'1 O O _j 0 CL z Y O Z z o w U a <br />O O�OOm Z U <br />LL O� <br />GFI / GFCI- GRCIUND FAULT CIRCUIT INTERRUPTOR VTR - VENT THROUGH ROOF DIMENSIONING: fn Z ¢ p w O W - W z o Qa. <br />GLS -GLASS V -VOLT o¢ o° a z <br />GWB - GYPSUM WALL BOARD WC - WATER CLOSET A. DIMENSIONS INDICATED ARE TO: ~ <br />GYPBRD - GYPSUM BOARD WH - WATER HEATER <br />HD - HEAD WL - WIND LOAD A.1. CMU WALL: OUTSIDE FACE OF WALL <br />HVAC - HEATING, VENTILATING, AIR CONDITIONING WP - WEATHERPROOF A.2. INTERIOR FRAMED WALLS: PLAN WEST (OR PLAN NORTH) FROM FACE OF / R <br />HT - HEIGHT WWM - WELDED WIRE MESH CORE -STUD / , _ <br />HB - HOIcE BIB W - WIDE OR WIDTH A.2.1. DIMENSIONS ARE NOT FROM ELEMENTS ATTACHED TO CORE STUD - I.E. 11j N <br />HC - HANDICAP WDW - WINDOW FURRING\ <br />INSUL - INSULATION W/ - WITH A.3. EXTERIOR FRAMED WALLS: TO OUTSIDE FACE OF STRUCTURAL CORE -STUD w <br />INT - INTERIOR WD - WOOD A.4. WINDOW OPENINGS: 0 � <br />LVL - LAMINATED VENEER LUMBER A.4.1. CMU WALLS: TO LEFT SIDE OF ROUGH OPENING S2 = ti LT - LAUNDRY TUB A.4.2. EXTERIOR FRAMED WALLS: TO CENTER OF OPENING O <br />LGT - LIGHT _� O O <br />MAX - MAXIMUM A.5. DOOR OPENINGS: M O <br />MATL - MATERIAL A.5.1. CMU WALLS: TO LEFT SIDE OF ROUGH OPENING <br />MFR -MANUFACTURER A.5.2. EXTERIOR FRAMED WALLS: TO CENTER OF OPENING Q J U') <br />MECH - MECHANICAL A.5.3. INTERIOR FRAMED WALLS: ADJACENT TO SIDE WALL: 5" RETURN MEASURED a LL IT <br />MTL - METAL FROM THE FINISH FACE OF ADJACENT WALL TO INTERIOR FACE OF DOOR Q W Q l <br />MC - MEDICINE CABINET FRAME <br />MIN - MINIMUM A.5.4. INTERIOR FRAMED WALLS: AWAY FROM SIDE WALLS: DIMENSIONED TO CENTER ~ W IZ M <br />OF DOOR 000 <br />A.6. SPECIAL AND CODE REQUIRED CLEARANCES -AS INDICATED ON PLANS OR FINISH Z V <br />SURFACE TO FINISH SURFACE <br />SYMBOL. LEGEND. A.6.1.EXAMPLE: 3-0 CLEAR INSIDE FINISH FOR ADA TRANSFER SHOWER Z <br />B. ALIGNMENT OF WALLS AND FINISHES AS SCHEDULED SHALL BE STRAIGHT, TRUE AND <br />W 0 <br />�A = STAIR CALL OUT HEIGHT OF SHEET NUMBER PLUMB. J 0 <br />-STEP DOWN 1 C. THE PRIORITY FOR PROJECT DIMENSIONS SHALL BE IN THE FOLLOWING ORDER: <br />\\ INT ELEV NUMBER C.1. CODE MINIMUM - MAXIMUM DIMENSIONS AND CLEARANCES <br />FOOTING NG OUT - STEP DOWN ARROW SHOWS C.2. LOAD BEARING CONCRETE MASONRY UNIT WALLS <br />C = SEE FOOTING SCHEDULE CALLOUT DIRECTION OF VIEW C.3. FRAMED WALLS EXTERIOR <br />ARROW SHOWS INTERIOR ELEVATION CA. FRAMED WALLS INTERIOR <br />0 = KEYNOTE CALL OUT DIRECTION OF VIEW MARKER C.5. DOORS AND WINDOWS <br />1 D. FLOOR ELEVATIONS ARE INDICATED TO THE FACE OF THE STRUCTURAL SLAB - <br />A9 ELEV NUMBER ARROW SHOWS UNLESS OTHERWISE NOTED <br />PRE -CAST LINTEL CALL SHEET NUMBER DIRECTION OF CUT E. VERTICAL DIMENSIONS ARE INDICATED FROM THE FLOOR ELEVATION TO THE FACE <br />OUT -SEE <br />SCHEDULE ENTEL ELEVAETERIOR TION MARKER 1 OF MATERIAL AT THE DIMENSION POINT - UNLESS OTHERWISE NOTED <br />Al SECTION NUMBER F. CEILING HEIGHTS ARE INDICATED FROM THE FLOOR ELEVATION TO FACE OF THE <br />STRUCTURAL MATERIAL ABOVE AS SCHEDULED <br />l� ELEV NUMBER SHEET NUMBER G. DIMENSIONS SHOWN ON THE DRAWINGS SHALL INDICATE THE REQUIRED SIZE, <br />LEDGER CALL OUT - LEDGER SCHEDULE SEE 4 2 SHEET NUMBER CLEARANCE AND DIMENSIONAL RELATIONSHIP BETWEEN PROJECT SYSTEMS AND <br />A15 <br />LOCATION OF CUT COMPONENTS - DIMENSIONS SHALL NOT BE DETERMINED BY SCALING THE <br />3 ARROW SHOWS DRAWINGS. <br />DIRECTION OF VIEW <br />MULTI VIEW INTERIOR SECTION <br />ELEVATION MARKER MARKER ® o 0 0 0 N N <br />'W � N N a a <br />O o o 0 0 <br />an N Z <br />N 1 <br />o o a o 0 0 <br />W I <br />1 Cr <br />Z <br />JUN 2 7 2073 .� ZW <br />O w Woz <br />O U <br />E N NARSW <br />U U <br />O OFa <br />CL <br />Virtual Review Assist. Inc. Z W n✓ m <br />for clans Review completed and ~ �W¢ <br />mpliance with the 2020 FBC 7 h E etion i� O � � p <br />L E N N A R TA M PA DIVISION by Debra Anne Klahr PX2300 <br />4600 W CYPRESS ST SUITE 200 ` 1 <br />NOTICE TO BUILDER &ALL SUBCONTRACTORS <br />UD 2 o zwo <br />TAM PA, FL 33607 o Z 0 gzx <br />IT IS THE INTENT OF DESIGN PROFESSIONAL LISTED IN THE TITLE Lo Z <br />813.574.5700 BLOCK THAT THESE DOCUMENTS ARE ACCURATE, PROVIDING z �� <br />LICENSED PROFESSIONALS CLEAR INFORMATION. EVERY ATTEMPT <br />HAS BEEN MADE TO PREVENT ERRORS: THE BUILDER AND ALL 0 <br />SUBCONTRACTORS ARE REQUIRED TO REVIEW ALL THE <br />INFORMATION CONTAINED IN THESE DOCUMENTS, PRIOR TO THE W <br />COMMENCEMENT OF ANY WORK. THE DESIGN PROFESSIONAL ARE <br />NOT RESPONSIBLE FOR ANY PLAN ERRORS, OMISSIONS,OR ¢ <br />MISINTERPRETATIONS UNDETECTED AND NOT REPORTED TO THE z z <br />DESIGN PROFESSIONAL PRIOR TO CONSTRUCTION. ALL C S W <br />CONSTRUCTION MUST BE IN ACCORDANCE TO THE INFORMATION <br />FOUND IN THESE DOCUMENTS. ANY QUESTIONS REGARDING THE N o <br />2216 INFORMATION FOUND IN THESE PLANS SHOULD BE DIRECTED TO THE N LAST PLOT DATE <br />DESIGN PROFESSIONAL LISTED IN THIS TITLE PAGE. NO BACK > . . May 5, 2023 <br />CHARGES WILL BE CONSIDERED FOR REIMBURSEMENT BY THE O <br />DESIGN PROFESSIONAL WITHOUT ADVANCED NOTIFICATION AND <br />APPROVAL BY THE DESIGN PROFESSIONAL. ,ammo,., , j COVER SHEET <br />