Laserfiche WebLink
RS&H <br />Architect's <br />Supplemental Instruction <br />Contractor: Berglund Construction <br />Project: <br />AdventHealth Zephyrhills <br />Kitchen Renovation <br />Reference: <br />Contract A104 <br />Drawing: <br />Shop Drawing: <br />Specification: <br />Other: <br />Q� ,V-- r-? 5-3, kr(-)i«,,,j <br />UP *C1, 5D <br />1715 N_ Westshore Blvd, Suite 600 O 813-289-5550 <br />?ampa, Florida 33607 F 813 289-5550 <br />rsandh.com <br />ASI- 01 <br />Date: 1-21-2021 <br />AEP File No: 504-0226-000 <br />Subject: Revision 4: Floor base and ceiling to wall protection WP-1 transition detail <br />The work shall be carried out in accordance with the following supplemental instruction issued in accordance with the <br />Contract Documents without change in Contract Sum or Contract Time. Proceeding with the Work in accordance <br />with these instructions indicates your acknowledgement that there will be no change in Contract Sum or Contract <br />Time. <br />DESCRIPTION: See summary of revisions below. Refer to clouded revisions on attached sheets for additional <br />information. <br />1. Sheet A104 <br />• REVISE floor base to wall protection transition detail 3 per RFI 47 and mockup review. <br />• ADD ceiling to wall protection detail for clarification <br />• REVISE floor plan and schedule: QR-1 to Urethane cement floor <br />• REVISE toilet room floor to QR-1 and wall paint to P-1 <br />ATTACHMENTS: A104 <br />By: Yoo-Jin Kim 1-21-2021 <br />Name Date <br />RS&H <br />ASI #1 <br />Page 1 of 1 <br />