Laserfiche WebLink
<br />BUILDING PERMIT <br /> <br />CITY OF ZEPHYRHILLS <br />(813) 788-6611 <br /> <br />Permit N '? <br /> <br />_ 3560 J3 <br /> <br />Date /0- 1<3 - 7'3 <br /> <br />GDI~ ELECTRICAL PLUMBING <br /> <br /> <br />P'opert'{ owne/;:X ~ ~..:i!fl <br />Job Address: '-~ - / ---'- _ ,_ <br />Parcell.D. # <br /> <br />MECHANICAL <br /> <br />Sewer Conn <br /> <br />Water Conn: <br /> <br />Water Meter: <br />T.I.F.'s: <br /> <br />Zoning: <br />Description of Work <br /> <br /> <br />Radon Gas: <br /> <br />NO OCCUPANCY BEFORE C,Q, <br /> <br />FINAL <br /> <br /> <br />Complete Plans, Specifications and Fee Must Accompany Application. <br />All work shall be performed in accordance with City Codes and Ordinances. <br /> <br />C,Q. <br /> <br />Inspector <br /> <br /> <br />pe'm;tFe~ <br /> <br />Signature _~ <br />--- <br />Company <br /> <br />Address <br /> <br />Telephone# <br /> <br />d <br /> <br />Valuation or <br />Contract Price <br /> <br />d'79. 07) <br /> <br />City License Registration # .:2. 7...g <br />State Certified License# <br /> <br /> <br /> <br />BUILDIN <br /> <br />ELECTRICAL <br /> <br />PLUMBING <br /> <br />MECHANICAL <br /> <br />Tp, Servo <br />Rough In <br />Meter Can <br />Const. Pole <br />Pool <br />Pre-Meter <br />Final <br /> <br />Ftr, <br />Pre SLB <br />Lintel <br />FRM, <br />Insul. CL <br />WL <br /> <br />SLB <br />Tub Set <br />Water <br />Sewer <br />Final <br /> <br />Breakers <br />Ducts Insl. <br /> <br />Compressor <br />Final <br /> <br />Driveway <br /> <br />REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a <br />charge of Fifteen and 00/100 Dollars ($15.00) shall be made for each trip for each trade: <br /> <br />a. Wrong Address <br />b. Condemned work resulting from faulty construction, <br />c. Repairs or corrections not made when inspection called. <br />d. Work not ready for inspection when called. <br />e, Permit not posted on job site, <br />f. Plans not at job site, <br />g, Work not accessible, <br /> <br />The payment of inspection fees shall be made before any further permits will be issued to the person owning <br />same, <br />