My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
15-16322
Zephyrhills
>
Building Department
>
Permits
>
2015
>
15-16322
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 9:17:22 AM
Creation date
3/10/2016 9:17:21 AM
Metadata
Fields
Template:
Building Department
Company Name
CITY OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
15-16322
Building Department - Name
ZEPHYRHILLS FIRE DEPARTMENT
Address
38410 6TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(vii) schedule and conducf�nreekly progress meefiings vvith the Owner and Professional to review <br /> such matters as construcfion progress, schedule, shop drav►ring sfiatus, and other information as <br /> necessary; <br /> (viii) make provision for Project security to protecfi fihe Project sifie and materials stored off-site <br /> againsf theft, vandaiism, fire and accidents as required by the General Terms and Conditions; , <br /> and <br /> 2.5(b) The Contractor shall promptly reject any Work(i) which does not conform <br /> fo the Construction Documents, if applicable; or (ii) �nrhich does not comply vuith any applicable <br /> law, statute, building code, rule or regulafiion of any public authority flr agency of which it is <br /> a,vvare. <br /> 2.5(c) The Contractor shall comply vvith Owner's policies applicable to this <br /> Agreement as referenced herein by reference. <br /> 2.5(d) The Contractor shall cause its subcontractors and suppliers to comply with <br /> the Project Construcfion Schedule and applicable sub-schedules. The Contractor shall obtain <br /> and review schedules from subcontractors and suppliers, coordinate sub-schedules with the <br /> Construction Schedule, and enforce compliance vvith all applicable schedules to ensure timely <br /> completion of the Work. If at any time a Project is delayed, the Contractor shall immediately no- <br /> tify the Owner of the probable cause(s) and possible alternatives, and make recommendations <br /> to minimize expense and/or delay to the.Owner. <br /> 2.5(e) Contractor and its subcontractors shall participate in, and cooperafie with, <br /> construction phase commissioning, validation, and other quality assurance and quality control <br /> processes. <br /> ARTICLE 3. THE OWRIER'S REPRESENTATIVE - <br /> The Owner's Representative for this Project is set forth on Exhibit A. The Owner's repre- <br /> sentative shall be the contacfi person in dealing with the Contractor on all design and technical <br /> matters, and will administer the Contract for Construction. Unless otherwise directed by Owner, <br /> the Owner and Contractor shall communicate with each other in the first instance through the <br /> Owner's Representative. The Owner's instructions to the Contractor will be issued through the <br /> designated Owner's Representative. <br /> ARTICLE 4. TIME OF COMMEIVCEMENT AND COMPLETION <br /> Contractor shall commence the Work within ten (10) calendar days after the date indi- <br /> cated on the Notice to Proceed, and shall be completed within 60 days from the commencement <br /> date. <br /> ARTICLE 5. COMPENSATION OF CONTRACTOR <br /> 5.1 The Owner shall pay and the Confractor shall accept, as full and complete payment <br /> for the Contractor's timely and complete performance of its obligations hereunder the fixed <br />
The URL can be used to link to this page
Your browser does not support the video tag.