My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
15-16510
Zephyrhills
>
Building Department
>
Permits
>
2015
>
15-16510
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2016 8:37:13 AM
Creation date
6/15/2016 8:36:03 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
15-16510
Building Department - Name
MOSS,S ARDELL
Address
38444 5TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5: ' �� <br /> � <br /> � <br /> I <br /> I ' I <br /> I <br /> � <br /> � <br /> Cross Construct+on Company, Inc ! <br /> 25221 Wesley Chapel Blvd <br /> Lutz, FL 33559 <br /> 893.973.4191 (F}813.948.6722 � <br /> = SUBCONTRACTOR AGREEMENT ; <br /> I <br /> This agreement made and entered into between Cr,oss Construction Company, Inc(hereafter <br /> referred to as"Contractor")and ' <br /> Cox Fire Protection Inc <br /> 7910 Professional Place <br /> Tampa, FLI 33637 <br /> (hereafter referred to as"Subcontractor"),to perform the work identified in accordance with the <br /> contracf documents. ; <br /> PROJECT LOCATION: 38884 5`h Avenuej <br /> Zephyrhills, FL i <br /> CUENT: FPS-RX <br /> I <br /> REPRESENTATIVE: Cross Construction Company,Inc <br /> PROJECT PIUMBER: CC903-15 i <br /> BONDING: [x] Not Required [ ]Required <br /> SCOPE OF WORK: Subcontractor agrees to furnisih all labor and material necessary to <br /> complete: i <br /> Provide engineering,materials,permitting,installation&test labor for fire alarm as <br /> required by code including cellular dialer monitoring transmissio�protocol; approximately <br /> (6)horn/strobes,(6)strobes,(4)manual pull stations,an ADDRESSABLE control panel(as <br /> required by Pasco County),front lobby annunciator 8�cellular dialer will be <br /> instalted.......................................................!...............................................$10,500.00 <br /> Deduct for dedicated phone line monitoring.....!.................................................($500.00} <br /> CHANGES: The Subcontractor may submit Requ Ist for Change Order(s)consisting of <br /> additions, deletions or modifications. The cost or credit and its effect on timing will be determined <br /> by mutual consent in advance and documented by a written Change Order signed by the <br /> Contractor. All Changes to Contract Sum or Contract Time shall be changed ONLY by written <br /> Change Order. <br /> i <br /> PAYMENTS: The subcontractor will submit final invoice for project after contract is 100% <br /> campleted in the amount of 10 500.00 and payment will be made NET 30 from the day Cross <br /> Construction Company's final job inspection and approvaf of work completed, receipt of <br /> subcontractor's invoice and the Clients' Final Paym'ent is received. The parties agree that the <br /> Contractor's obligation to pay does not arise and is�specifically conditioned upon payment for the <br /> services rendered being received by the Contractor. RETAINAGE:A Retainage Fee of Five <br /> Percent(5%)will be hefd by the Contractor on the contracted amount and will be applied to all <br /> subsequent change orders. Payment of Retainageishall be made when the work is complete, <br /> and the contract full performed and the Clients'Final Payment is received. LIENS: <br /> Subcontractor agrees to pay all bills when due for materials and labor used on Contractor's jobs. <br /> Subcontractor agrees to keep such jobs free and clear of inechanics'or material men's claims or <br /> liens. The Subcontractor agrees to provide a Release of Lien with each Draw Request. <br /> Contractor may,at its option,make any checks payable to Subcontractor and anyone or more of <br /> its suppliers or workers who have filed a Notice to Owner. BACK CHARGES: The Contractor <br /> reserves the right to Back Charge the Subcontracto'r for the repair and/or completion of any <br /> damaged or defective work caused by Subcontractor or Subcontractor's employees or <br /> representatives during the completion of the contract. Any work or damage pe�formed by the <br /> Subcontractor that affects the integrity of existing work performed by another Subcontractor,or <br /> the existing structure,including common areas, elevators,or firewall penetrations made by you, <br /> it� <br />
The URL can be used to link to this page
Your browser does not support the video tag.