Laserfiche WebLink
' � (21.1)Attornevs'Fees and Costs. In the event of a dispute arising under this Agreement,whether or not a lawsuit or other proceeding is filed, <br /> the prevailing party shall be entitled to recover its reasonable attorneys'fees and costs,including attomeys'fees and costs incurred in litigating entitlement <br /> to attorneys'fees and costs,as well as in determining or quantifying the amount of recoverable attomeys'fees and costs. The reasonable costs to which the <br /> prevailing party is entitled shall include costs that are ta�cable under any applicable statue,rule,or guideline,as well as non-taxable costs,including,but <br /> not limited to,costs of investigation,copying costs,electronic discovery costs,telephone charges,mailing and delivery charges,information technology <br /> support charges,consultant and expert witness fees,travel expenses,court reporter fees and mediator fees,regardless of whether such costs are otherwise <br /> taxable. <br /> (22)Notwithstanding any provisions of the general and special conditions of the contract with the Owner;work stoppages,slowdowns or failure <br /> of the Subcontractor to begin or continue work because of strikes,picketing,boycott or other voluntary or involuntary cessation of work may be cause for <br /> the Contractor to terminate this contract as hereinafter provided in Section(21). <br /> EX�IIBIT "A" <br /> (1) This Contract will become effective and in full force and effect only upon written notice by Contractor to Subcontractor to proceed. <br /> (2) Subcontractor waives all rights against Contractor and Owner for damages caused by fire or other perils to the extent covered by insurance <br /> for the work. <br /> (3) AIA Document A201,General Conditions,2007 Edition,shall control where not conflicting with this subcontract agreement. <br /> (4) All sections of the specifications apply to Subcontractor as applicable. <br /> (5) The completion date for this project is TBD,20 16 and this Subcontractor will perform his work in such a manner that this date will be <br /> met. The subcontractor is subject to a day liquidated damages for delays caused by subcontractor if such delays cause the contractor to become <br /> liable to pay liquidated damages as prescribed in contract documents between Owner and Contractor. <br /> (6) Subcontractor shall furnish sufficient manpower to meet Contractor's schedule,regardless of overtime considerations. <br /> (7) Subcontractor represents to be completely familiar with goveming codes applicable to the work. Should any conflicts exist between the <br /> contract documents and the governing codes,the codes will govem. Furthermore,for any changes required in the contract documents to conform to the <br /> applicable codes,this work will be performed at no expense to the Owner,Architect,Engineer,or Contractor. <br /> (8) The Subcontractor will not discriminate against any employee or applicant because of race,color,religion,sex,or national origin. The <br /> subcontractor will take a�rmative action to insure that applicants are employed and that employees are treated during employment without regard to their <br /> race,color,religion,sex,or national origin. Such action shall include,but not be limited to the following: employment,upgrading,demotion or transfer; <br /> recruitment,or advertising;layoff or termination;training,including apprenticeship. The Subcontractor agrees to post in conspicuous places,available to <br /> employees and applicants for employment,notices to be provided setting forth the provisions of this nondiscrimination clause. <br /> (9) Subcontractor shall not proceed with any work under this subcontract if any conditions exist which in any way limit or void warranty <br /> hereunder, except with prior written waiver of warranty by Contractor's project manager furthermore, Subcontractor to inspect all substrates prior to <br /> performing his work to report any defects to the project superintendent. Installation of work constitutes acceptance of substrates. <br /> (10) If Subcontractor's work requires excavation of any kind,for any purpose,Subcontractor shall be responsible for backfill and recompaction <br /> of his excavations to the satisfaction of the job superintendent,Owner('s)representative or Engineer. Subcontractor agrees to pay for all re-testing. <br /> (11) Subcontractor to provide all temporary facilities,and protection for his stored materials if required for the execution of his work. <br /> (12) Subcontractor to provide all cutting and patching required for the installation of his work. <br /> (13) Subcontractor to provide all necessary backing and supports for the installation of his equipment or Owner supplied equipment. <br /> Subcontractor is responsible for installing. <br /> (14) Subcontractor shall furnish and install ail items not specifically mentioned or shown in the plans and specifications but necessary for the <br /> comp(etion of the installation of his work. <br /> (15) Subcontractor shall take all precautions to protect the work of other trades from damage caused by his operation. Should damage occur, <br />� Contractor shall have the right to correct such damage at the Subcontractor's expense. <br /> (16) Subcontractor will ensure that all his materials and equipment are being safeguarded by Subcontractor and that C.W Hayes Construction <br /> Company will not be responsible for materials either misplaced or stolen under his contract. <br /> Int <br /> �l�I•�J_ <br /> 4 <br />