_ , ` ` (17) Any request for payments for materials stored on site wil l be based on 90%of the suppliers actual invoice amounts upon written approva] �� <br /> of Contractor. '� <br /> (18) All required measurements shall be taken by the job superintendent and the Subcontractor's representative. I, <br /> (19) Subcontractor shall submit to the Contractor a complete set of as-built drawings prior to receiving final payment. Subcontractor is to <br /> update record set of drawings at jobsite on a daily basis. <br /> (20) All work to be done in compliance with all O.S.H.A.safety standards and the subcontractor shall have their Materia]Safety Data Sheets <br /> information on site prior to commencement of work and throughout their scope of work. <br /> (21) If this contract is a unit price contract estimated quantities are based on take offs from plans. Payment will be made based on actual <br /> .quantities installed and approved by C.W.Hayes Construction Company representative. <br /> (22)Any materials,equipment or labor charged to the contractor's accounts when this subcontract includes such materials,equipment or labor <br /> will be assessed a 12%mark up by contractor for processing which will be deducted from the subcontract amount. <br /> (23)A qualified Subcontractor Superintendent must be on the jobsite at all times during the subcontractor's course of construction and during all <br /> Subcontractor's inspections with Governing Authorities. <br /> (24) Scope of Work includes,but not necessarily limited to: <br />�� A. Provide all labor,material,and equipment to perform all fire sprinkler work as detailed on plans prepared by Comelison Engineering and <br /> Design,Inc.date 2/22/16 page Site Plan,plans prepared by LB Manske date 1/5/16 page D1.0,D2.0,A1.0,A2.0,A3 0,A4.0,A5.0,A5.1,A7.0, <br /> A7.1, Structural General Notes,S1.1,S1.2,S2.1,S3 1,E0.0,E1.0,E2.0,E3.0,M1.0,MP0.1,PI 0,PI.1,contract date 1/5/16 page LS1. <br /> B. Modify existing wet system to current codes <br /> C. To include all required testing per city,state federal and local codes. <br /> D. Coordinate approved layout with Superintendent,HVAC,Mechanical and Electrical trades to avoid conflict with structure and layout of each <br /> trade. <br /> E. Coordinate with Electrical trade for panel placement and needs. <br /> F. Ensure that all pipe,sizing,fittings and valves are in good condition to install. <br /> G Ensure that all pipes are reamed,valves are accessible and gravity slope to drain is provided. <br /> H. Hangers will be proper type and size and spaced accordingly;meet all seismic loads. <br /> I. No unscheduled cutting of structural members. <br /> J Verify all test connections and low point plugs. <br /> K. All penetrations needing fire caulk or sleeves are furnished and installed per code. <br /> L. Verify heads are in accordance with NFPA. All heads must be new,unpainted and ensure proper temperature rated placement. <br /> M. System must be installed to allow complete drainage of system. <br /> N. Coordinate with the Superintendent drain locations;specifically where drainage will not stain concrete or paved areas. <br /> O. Wet pipe systems will be tested at check alarm,check valve assembly conformance and water flow indicators for conformance with connection <br /> diagram. Test water flow alann signal. <br /> P. All final tests will be conducted after fire alarm panel is activated and in test mode with inspector,fire alarm subcontractor,electrician and fire <br /> department,etc. <br /> Q. Dry pipe systems check valve installation for conformance to connection diagram;verify all proper installation of air compressors and tanks as <br /> provided. Observe test of alarm signal time etc. <br /> R. Confirm all alarm devices have been provided and are operable. <br /> S. Ensure fire alarm tie of system is complete. <br /> T Verify system is completely cleaned,painted insulated,tested and approved as required. <br /> U. Provide a mounted box of spare heads. <br /> V. Confirm that expansion requirements are provided for if needed. <br /> W. Ver�fy all system supports,anchorage,sway and seismic bracing is in accordance to NFPA,IBC and all other pertaining codes. <br /> X. Provide a 3 ring binder with plastic sleeves,to include As-built drawing,sprinklers head specifications and sizes with marked locations and all <br />' valve and gauge information for system to be left in fire sprinkler room. <br /> Y. Provide As-built drawing to GC upon completion of project. <br /> Z. All pipe fitting,reaming and turning will be done over areas of floor with heary covering to ensure no oils are leaked during fabrication. <br /> AA. Furnish all equipment needed to install system correctly and safely. <br /> AB. GC will provide adequate lay down yard. All materials stored will be covered as directed by subcontractor and kept in good fashion. <br /> AC. Al(work will be completed and installed in a professional manner. <br /> AD. Project will be run with job safety and job cleanliness in mind. Subcontractors will be required to ensure all normal job safety protocol is being <br /> met. <br />, Int 9r�� <br />� 5 I <br /> J <br />