Laserfiche WebLink
� ; AE. �Subcontractors will be responsible for 100%of their daily cleanup. <br /> AF. There will be areas on site for storage containers/units as needed;as determined by GC. <br />� AG GC will provide power,water and dumpster at jobsite(excludes site demolition). <br /> li AH. All subcontractors�vill be responsible for their own scaffolding,lifts,ladders,etc.to perform. <br /> AI. All subcontractors will be responsible for all of their lifting and crane needs. All cranes will bring a crane lift diagram and their current <br /> I operator's certification. All forklift and high reach operators will also need to have their certifications on site when using said equipment. <br />� Those will be copied and kept in Superintendent's office on file. <br /> AJ All subcontractors are to be prompt and ready to follo�v construction schedules that will be released. <br /> AK. Subcontractors must have a foreman on site when performing work. <br /> AL. All subcontractor foremen while working on site will attend weekly Superintendent's Project Meeting. <br />� THIS IS A HARD HAT PROJECT <br />� <br /> I � <br />�, <br />� <br /> Int ��� <br />''I . <br /> 6 � <br />