' ` i <br /> . i <br /> . ; <br /> Dr.Michael Caselnova's Office 4 <br /> Geohazards Project No. 2008674 <br /> December 9,2008 � <br /> i <br /> I <br /> ! <br /> 8.0 MONITORING BY THE GEOTECHIVICAL ENGINEER OR HIS OR HER , <br /> REPRESENTATIVE <br /> General <br /> The Geotechnical Engineer or his or her representative will monitor the pressure grouting � <br /> operations to document compliance with the specifications outlined above and the duties discussed j <br /> below. All injection pipe installations and grouting operations shall be performed in the presence i <br /> of the Geotechnical Engineer's representative. The Geotechnical Engineer or his or her � <br /> representative shall assume responsibility for verifying the quantity of grout pumped,intervals of i <br /> grouting and deciding if additional or less grout is necessary. <br /> Compliance I <br /> The Geotechnical Engineer or his or her representative may stop the grouting operation at any time i <br /> if, in his or her judgment,the operation does not comply with these specifications or the work is ' <br /> unsuitable. <br /> i <br /> Daily Records � <br /> The Geotechnical Engineer or his or her representative will malce aIl measurements of ground , <br /> heave or settlement,installed pipe lengths and grout quantities pumped. Records of each day's i <br /> grouting operation will be maintained for the benefit of the insurance company and Contractor. � <br /> The grout and pipe quantities recorded by the Geotechnical Engineer's representative shall be ` <br /> considered the final amounts for pay purposes. � <br /> Ground/House Movement ( <br /> During grouting, the Contractor and Geotechnical Engineer or his or her representative shall � <br /> observe any vertical movement of the ground and house using a transit/level. If a downward <br /> movement of tfie ground surface is observed,the grouting operation shall cease and observations ' <br /> shall continue for 30 minutes. Likewise if there is any upward movement of the house, grouting <br /> should be temporarily suspended. If the ground does not return to its original grade,pumping shall ! <br /> be resumed at a lower rate of injection. If upward movement is observed,the grouting operation i <br /> shall cease. � <br /> Existing Utilities/Structures � <br /> The Contractor shall exercise care when grouting beneath and adjacent to any underground utilities. ; <br /> The Contractor is responsible for ensuring the grouting operation does not damage existing utilities, f <br /> wells, septic tanks, etc. ! <br /> � <br /> i <br /> ; <br /> I <br /> David Bloomquist,PhD,PE � <br /> Geotechnical Engineer � <br /> ; <br /> Florida License Number 37235 ! <br /> i � <br /> i <br /> I <br /> i <br /> � <br /> � <br /> I <br />