Laserfiche WebLink
i , , <br /> �_ * � // A�' ,_ � � :.� <br /> � � -. <br /> � ' 'May 4� 1989 ��ca� � �—/��% �'szJ �/, <br /> I ' <br /> i City of Zephyrhills <br /> � 603 8th Street <br /> j Zephyrhills, FL 34248 <br /> the � <br /> � Att: Mr. Bruce Bahr-- _ <br /> � Building Official - <br /> edge group � . �_ <br /> � Re: East Pasco Medical Center � � <br /> aj "Second F1oor Over Emergency Room" project <br /> P� <br /> Dear Mr. Bahr: - <br /> architects� <br /> d e sig n ers� Chief Fenton has asked that we write this letter to properly <br /> convey what is planned for the Second Floor area over the new <br /> consultants' ' Emergency Room. Plans had been completed for this area, for it <br /> p I a n n e r s' to be cons truc ted as a shell wi th no finish work of any kind <br /> � inside. Everything within the shell was non-combustible, it was <br /> i n t e r i o r s; not accessible from the Hospital, and as such was not planned to <br /> ; be fire sprinklered at this time. It essentially was to be an <br /> 444 BUNKER ROAD att1C space. <br /> WEST PALM BEACH <br /> FL 33405-369i However, we are now working on plans for the work to go into <br /> 407 585-9307 this space which will be submitted for normal permitting and <br /> , review when ready. When this work is built, the space will be <br /> � fully fire sprinklered. The current plan is for it to <br /> � accommodate Labor rooms, a Delivery room, and a Cardiac <br /> � Catheterization room <br /> PRINCIPAL ' � plus ancillary spaces. We felt that the <br /> I Hospital should not be required to have fire sprinkler lines and <br /> DonaldR.Edge,A.IA.I heads installed into a space that does not require them now, <br /> ARCHITECTS � knowing that in a few months the entire sys tem would need to be <br /> JoeA.Rainwater,A.lAI. T2—WOr1Ced t0 accommodate the actual llS3ge. • <br /> BUSINESS DEV. I We hope that you agree that the following proposed phasing is a <br /> GeorgeFSauers � Prud2llt and safe path for t�11S work: • <br /> I • <br /> SECRETARY i - Phase 1 - a. Build the Second Floor structure and roof. <br /> Winifred M.Kennedy I b. D='y 1 t lII. <br /> ic. No fire sprinklers in the shell yet. <br /> Id. Proceed with the First Floor work. <br /> iPhase 2 - Perform the interior Second Floor work, including <br /> ifire sprinklers, etc. _ - <br /> iI hope this clarifies the intent of the proposed work, and that <br /> it can be allowed to proceed ahead. ' <br /> i • <br /> I <br /> i , <br /> � Yours very truly, <br /> I <br /> i <br /> � Donald R. Edge <br /> FAX NO 407 585-9628 Archi tec t � <br /> � He who builds according to every man's advice will have a crooked house: Danish proverb <br /> i <br /> i <br /> I � <br />