My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (7)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:27:32 AM
Creation date
3/23/2017 8:51:04 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
O.B. AND FUTURE CATH LAB ADDITION
Owner
EAST PASCO MEDICAL CENTER
Building Plans - Permit #
0373B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� I <br /> ' t , <br /> � <br /> � " , <br /> , ' <br /> � <br /> , � � , <br /> � <br /> i <br /> EAST'' PASCO MEDICAL CENTER <br /> O.B.; ADDITION/CON: EXEMPT <br /> CATH LAB ADDITION/NON-REVIEWABLE <br /> LOG !NO. H-425-G <br /> NOVEMBER 7, 1989 <br /> ARCHITECTURAL <br /> i <br /> A-1 � Life Safety Plan, Sheet A-1. 5 : The length and width <br /> � dimensions in 5moke Compattment 3A-1 total more than <br /> the allowable 300 feet. This compartment shall be <br /> ,i further subdivided to comply with NFPA-101-13 . 3 .7 . <br /> A-2 � Provide disposable paper towel and soap dispensers at <br /> each lavatory and hand washing sink. <br /> MFC�MCQ/sl <br /> MECHANICAL <br /> I <br /> AC-l� Provide a duct smoke detector in the supply and return <br /> ; of all air handling units of over 2 , 000 cfm capacity. <br /> R f i�estat may be used in lieu of a smoke detectoz in <br /> � the retuin air ducts of air handlers laLger than 2 , 000 <br /> cfm but smaller than 15, 000 cfm. Example : AHU-2 . <br /> The above Lequitements shall be shown clearly on the <br /> � mechanical plans by the mechanical design <br /> professional . The contractor shall not be assigned <br /> the, responsibility of determining smoke detector <br /> � r�quirements . Clarify Note 3 of the secondary drain <br /> � pan detail on Sheet M-5 . <br /> AC-2� The contractor shall not be assigned the <br /> � responsibility of determining fire damper <br /> requirements . Revise General Note 6 , Sheet M-1. <br /> AC-3 Adequate space shall be provided around mechanical <br /> equipment for servicing filters, removing fans and fan <br />', shafts , chanqing motors and removing coils . Response <br /> ;� to this comment is not required. Compliance shall be <br /> verified at the HRS inspection. <br /> i <br /> � <br />' AC-4 P=ovide the pressure differential test specified in <br /> the duct smoke detecto= manufacturer ' s installation <br /> , a instructions . � Complete written documentation of test <br /> ! results shall be provided at the final HRS <br /> inspection. Test results may be incorporated into the <br /> � test and balance =epott. <br /> I <br /> Page 1 of 6 <br /> d <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.