My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (7)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:27:32 AM
Creation date
3/23/2017 8:51:04 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
O.B. AND FUTURE CATH LAB ADDITION
Owner
EAST PASCO MEDICAL CENTER
Building Plans - Permit #
0373B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I � , <br /> EAST` PASCO MEDICAL CENTER <br /> O.B.;/ CON: EXEMPT <br /> CATH LAB ADDITION/NON-REVIEWABLE <br /> LOG NO. H-425-G <br /> NOVEMBER 7, 1989 <br /> FP-2�* Provide the results of a recent f low test to determine <br /> the adequacy of the water supply before construction <br /> � begins . This information is usually readily available <br /> from the fire d�partment or from assistance by a fite <br /> protection conttactor . <br /> FP-3 Provide sufficient information regarding the �xisting <br /> fire protection system(s) on the plans to make all <br /> i conditions clear . Indicate all existing piping and <br /> � pipe sizing involved in this project as called for on <br /> Sheet FP-l. <br /> MF C:,MAN/s 1 <br />� I <br /> � <br /> ELEC�TRICAL <br /> f <br /> Sheet E-l: <br /> � <br /> � <br /> E-l ; All double egress corridor doors requiie an exit light <br /> � on each side of the door with the light placed over <br /> f the door leaf which opens in the direction of exit <br /> ; travel . <br /> E-2 Delivery/Section 2308 : <br /> i A. Each surgical light shall be connected to a <br /> dedicated critical branch circuit . <br /> B. Provide general purpose li htin connected to a <br /> g 9 <br /> normal branch circuit. <br /> C. Connect all receptacles to the critical branch. <br /> D. Each delivery room shall have an emergency <br /> communication system that can be activated I <br /> without the use of hands, and shall be connect�d , <br /> with the ob.�tetrical suite station. '� <br /> E. All equipment requited to provide heating for I� <br /> areas listed in NEC 517-64 (b) (1) except patient <br /> rooms shall be connected to the equipment � <br /> emergency branch arranged for automatic or manual ' <br /> r �� <br />'r Page 3 of 6 <br /> , <br /> f III <br />
The URL can be used to link to this page
Your browser does not support the video tag.