My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (12)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 9:25:35 AM
Creation date
4/3/2017 9:20:12 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Contractor
POOLE CONSTRUCTION
Description
ER RENOVATION REVISION #5
Owner
EAST PASCO MEDICAL CENTER
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> � <br /> ; � <br /> _ � <br /> - �. <br /> _ + <br /> � <br /> �vzszoN No. � <br /> � <br /> i <br /> JA i ARY 12,ZQOQ <br /> CATH LA.B REN4VATION <br /> EAS�T PASCO MEDICA.L CENTER <br /> � ZEPHYRHI:LLS, FLQRTDA <br /> � � _ - <br /> ESA JOB NC3. 99086.00 <br /> PDG JQB NO. 9�027.12 <br /> � <br /> AHCA LOG NCI. H-425-AI <br /> � :, <br /> PH,C}ENIX DESIGN GR4TJP, I�tC. ' � <br /> 1Q4-WQQL}MONT BLVD, SUITE 218 <br /> NASHVILLE,TEl�iI�ESSEE 37205 <br /> � � <br /> This Addendum forms a part of the Contract Documents and rnodifies the original Bidding <br /> Documents, dated December 8, 1999, as outlined here in addition to being shQwn on the <br /> sketches as Uelta 2, dated January 12,200Q. _ � <br /> ; <br /> � <br /> � t <br /> CHA;NGES T4 TH�DRAWINGS <br /> , . <br /> f <br /> Sheet M-1 - General Notes and Legend- HVAC: <br /> i <br /> l.� Add General Renovation Note R21 as follows. <br /> � "R21. Maintain constructian areas under negative pressure at all times." <br /> � <br /> Sheet M-2- Demolitian and New Work Floor Plans-HVAC &Piping: <br /> 1I Revise the return air ductwork as in:dicated on attached drawzn sheet M-2 Delta <br /> � � <br /> No. 1, dated January 12,�000. " <br /> 2. Add duct size 10"diameter to suppiy duct runout to the supply diffuser above the <br /> � Holding Area.as indicated on attached drawing sheet M-2, Delta 1`+Ta. 1, dated <br /> � January 12, 200Q. <br /> I <br /> Sheet P-1 - Second Flaor Plan DemolitionJ New Work- Plumbzng: <br /> i1. Added Medical Gas Schedule reflectin. the addition af new med'zcal as wall autlets <br /> � � <br /> in existing Cath Lab. Refex to clouded axea located on drawing P-1,labeled as <br /> Delta No. l;-dated January 12,20Q0. <br /> ADDENDUM N0. 1 Page 1 of 2 99086.00 <br /> � <br /> i � <br /> . ; <br />
The URL can be used to link to this page
Your browser does not support the video tag.