Laserfiche WebLink
. ' <br /> . , <br /> -� ~ - <br /> � i <br /> i <br /> � <br /> 2. ;Added Plumbing Keynote No. 5 to reflect the new vacuum and air line connections <br /> ;to serve the new medical gas wall outlets in e�sting Cath Lab. Refer to clouded <br /> � <br /> area located on drawing P-1, labeled as Delta No. 1, dated January 12, 2000. <br /> 3. �� Made new 3/4"vacuum and �/2' air connection to e�risting 3/4"vacuum and �/2" air <br /> �; lines to serve new medical gas wall outlets located in existing Cath Lab. Refer to <br /> clouded area located on drawing P-1, labeled as Delta No. 1, dated January 12, <br /> 2000. ` <br /> 4. ; Added e�sting medical gas alarm panel serving e�sting Cath Lab to demolition <br /> plan. Refer to clouded area located on drawing P-1, labeled as Delta No. 1, dated <br /> ; January 12, 2000. <br /> Sheet�E-3—Power & Systems Second Floor Plan <br /> 1. ' Revise circuit for fire smoke dampers. Refer to clouded area located on drawing E- <br /> �- 3, labeled as Delta No. 1, dated January 12, 2000. � <br /> 2. ' Add code blue buttons and dome light. Refer to clouded area located on drawing <br /> E-3, labeled as Delta No. 1, dated January 12, 2000. <br /> i � <br /> Sheet E-4—Electrical One Line and Notes <br /> 1. Add note detailing shunt trip breaker connections. Refer to clouded area located <br /> on drawing E-4, labeled as Delta No. 1, dated January 12, 2000. <br /> 2. Add notes detailing adjustments of existing upstream breakers. Refer to clouded <br /> area located on drawing E-4, labeled as Delta No. 1, dated January 12, 2000. <br /> � <br /> ' � i <br />