Laserfiche WebLink
' <br /> 1 . Identifications of project . ' � <br /> 2 . Description of affected work. � <br /> 3 . Necessity for cutting. <br /> 4 . Effect on other work, and on structural integrity of ' <br /> project . <br /> 5 . Description of proposed work. Designate scope of : , <br />� a. Cutting and patching <br /> b. Trades required to perform work. ' <br /> c . Products proposed to be used. <br />' d. Extent of refinishing. , <br />, 6 . Alternatives to cutting and patching. ' <br /> 7 . Designation of party responsible for cost of cutting � <br /> and patching. ' <br /> C . Submit cost estimate for cutting and patching requestad by � <br /> Owner prior to starting work. <br /> D. Should conditions of work, or schedule, require a change ' <br /> of materials or methods, submit written recommendations to <br /> Architect, including: ' <br /> 1 . Conditions which cause requirement for change . <br /> 2 . Recommendations for alternative materials or methods . <br /> ' <br /> 3 . Submittals as required for substitutions . <br /> 4 . Cost estimate for changing materials and methods . , <br /> E. Submit written notice to Architect designating time work <br />' will be uncovered for his observation. <br /> , <br /> 1 . 04 RESPONSIBILITY FOR COSTS <br /> A. Costs caused by ill-timed or defective work, and worl{ not ' <br /> complying with requirements of contracts, including costs <br /> of additional services of the Architect or other ' <br /> consultants shall be paid by the party responsible for <br /> ill-timed, defective, or noncomplying work as determined <br /> by the Architect . <br /> B. Cost of work done on instructions of Owner, other than , <br /> defective or noncomplying work will be paid by the Owner. <br /> � <br /> November 25 , 1998 01045-2 98088 . 00 � <br />