Laserfiche WebLink
� ` - _ ' . <br />� ' PART 2 PRODUCTS <br /> � 2 . 01 MATERIALS <br /> A. Provide materials required for original construction. <br /> � B. For any , change in materials, submit request for <br /> substitution as specified above. <br /> '' PART 3 EXECUTION <br /> 3 . 01 INSPECTION <br /> ' A. Inspect existing conditions including elements subject to <br /> movement or damage during: <br /> ' 1 . Cutting and patching. <br /> � ` B. After uncovering work, " inspect conditions affecting <br /> installation of new products . <br /> 3 . 02 PREPARATION <br /> � A. Before cutting: <br /> � 1 . Shore, brace, and support as necessary to maintain <br /> structural integrity. <br /> ' 2 . Protect other parts of project from damage. <br /> 3 . 03 PERFORMING WORK <br /> � A. Fit and adjust materials to provide a finished and <br /> complete installation. <br /> � B. Cut and remove materials, to ensure other work will not be <br /> damaged, and new materials can be properly installed. <br /> C . Restore work to ensure compliance with specifications . <br /> � � D. Refinish surfaces to provide an even uniform appearance. <br /> ' 1 . Continuous surfaces : Refinish to nearest intersections . <br /> 2 . Assemblies : Refinish entire assemblies . <br /> � <br /> END OF SECTION I <br /> ' I <br /> � <br /> ' Novernber 25 , 1998 01045-3 98088 . 00 I <br />