My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (36)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:34:37 AM
Creation date
4/11/2017 10:31:18 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
ANGIO/HUMAN RESOURCE RENOVATIONS
Owner
EAST PASCO MEDICAL CENTER
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> The Architect or his representative (Testing and � <br /> Inspection Agency) shall select the samples of materials <br /> for testing. In no case shall the vendor be considered a ' <br /> representative of the Architect for this purpose . <br /> 1 . 07 Copies of test or inspection reports are to be issued <br /> within 48 hours of the test or inspection. The following , <br /> information is to be included: <br /> Name and Address of Test Agency ' <br /> Date <br /> Project Name <br /> Project Location ' <br /> Project Contractor <br /> Material Supplier <br /> Specified Strength <br /> Type of Material , <br /> Time Sampled <br /> Name of Person Performing Tests <br /> Quantity Represented ' �, <br /> Weather Conditions <br /> Results of Tests <br /> Date Tested ' <br /> Location of Material Tested <br /> Remarks <br /> Distribution of Reports <br /> 1 . 08 Make the premises available to the Architect and to the ' <br /> Testing and Inspection Agency and shall cooperate with the <br /> Testing Agency. , <br /> 1 . 09 Notify the Testing Agency 24 hours prior to the required <br /> testing and inspection. <br /> 1 . 10 The Architect will make decisions or set guidelines for , <br /> acceptance or rejection of materials based on test <br /> results . , <br /> 1 . 11 Advise the Architect immediately of improper testing <br /> procedures, unqualified personnel performing test, , <br /> unnecessary testing or incorrect test results . <br /> 1 . 12 Neither the observations of the Architect in his <br /> administration of the contract, nor inspections, tests or ' <br /> approvals by persons other than the Contractor shall <br /> relieve the Contractor from his obligations to perform the <br /> work in accordance with the Contract Documents . ' <br /> END OF SECTION � <br />� ' <br /> November 25 , 1998 01400-2 980�8 . 00 ' <br />�I <br />
The URL can be used to link to this page
Your browser does not support the video tag.