My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (36)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:34:37 AM
Creation date
4/11/2017 10:31:18 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
ANGIO/HUMAN RESOURCE RENOVATIONS
Owner
EAST PASCO MEDICAL CENTER
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> ' <br /> � SECTION 01500 <br /> i <br /> ' TEMPOR.ARY FACILITIES <br /> PART 1 GENERAL <br /> , 1 . 01 RELATED REQUIREMENTS <br /> ' � A. Contractor' s use of premises : Section 01010 . <br /> B. Final cleaning: Section 01700 . <br /> ' i . 02 ELECTRICITY AND LIGHTING <br /> A. Provide service required for construction operations, with <br /> � poles, branch wiring, distribution boxes and other <br /> appurtenances located to allow service and lighting by <br /> ' means of construction type power cords . Pay for costs of <br /> ' energy used. <br /> � B. Arrange with local electric power company and pay fees for <br /> tapping onto existing electric power source and providing <br /> , meter for temporary construction lights and power. <br /> � <br /> C. Connect to existing service inside the meter for 110 and <br /> ' , 220 volt power for lights and power required, and provide <br /> � branch wiring and distribution boxes located to allow <br /> service and lighting by means of construction type power <br /> ' cords . <br />�� � 1 . Do not use the Owner' s source for o eration of electric <br /> A <br /> heat. <br /> ' 2 . The Owner will pay costs of energy used except as <br /> follows : <br /> , a. If higher voltages are required, make arrangements <br /> i with local electric power company; make connections <br /> ' to primary source; and pay installation fees and <br /> , meter charges . <br /> D. Provide lighting for construction operations . <br /> ' � � <br /> E. Existing and permanent lighting may be used during <br /> construction. Maintain lighting and make routine repairs . <br /> 1 I <br /> F. When temporary items are no longer required, remove the <br /> system. <br /> ' <br /> �. <br /> ' I � <br /> November 25 , 1998 01500-1 98088 . 00 <br /> 1 � <br /> j � <br />
The URL can be used to link to this page
Your browser does not support the video tag.