My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (36)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:34:37 AM
Creation date
4/11/2017 10:31:18 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
ANGIO/HUMAN RESOURCE RENOVATIONS
Owner
EAST PASCO MEDICAL CENTER
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 I <br /> � � <br /> ' SECTION 01700 <br /> ' ; CONTRACT CLOSEOUT <br /> I <br /> I <br /> PART 1 GENER.AL <br /> ' 1 . 01 DESCRIPTION <br /> I <br /> � A.I Definitions : Closeout is hereby defined to include <br /> ' general requirements near the end of Contract time, in <br /> � preparation for final acceptance, final payment, normal <br /> termination of contract, occupancy by Owner and similar <br /> ' actions evidencing completion of the work. Specific <br /> ' requirements for individual units of work are specified in <br /> sections of Divisions 2 through 16 . Time of closeout is <br /> ' directly related to "Substantial Completion" and; <br /> therefore, may be either a single time period for entire <br /> � work or a series of time periods for individual parts of <br /> , � , the work which have been certified as substantially <br /> � ; complete at different dates . That time variation (if any) <br /> shall be applicable to other provisions of this section, <br /> regardless of whether resulting from "phased completion" <br /> ' � originally specified by the contract documents or <br /> subsequently agreed upon by Owner and Contractor. <br /> ' 1 . 02 � PREREQUISITES TO SUBSTANTIAL COMPLETION <br /> A. General : Prior to requesting Architect' s inspection for <br /> ' certification of substantial completion, as required by <br /> , I General Conditions (for either the entire work or portions <br /> � thereof) , complete the following and list known exceptions <br /> in request : <br /> ' 1 . In progress payment request coincident with or first <br /> following date claimed, show either portion of work <br /> ' , claimed as "substantially completed" , or list <br /> ' incomplete items, value of incompletion, and reasons <br /> for being incomplete . Include supporting documentation <br /> ' for completion as indicated elsewhere in these contract <br /> documents . <br /> � i 2 . Submit statement showing accounting of changes to the <br /> � Contract Sum. <br /> 3 . Advise Owner of pending insurance changeover <br /> ' requirements . <br /> i <br /> � 4 . Submit specific warranties, workmanship/maintenance <br /> � bonds, maintenance agreements, final certifications and <br /> isimilar documents . <br /> � <br /> 1 ; � <br /> � � <br /> � November 25 , 1998 01700-1 98088 . 00 <br /> i I <br />
The URL can be used to link to this page
Your browser does not support the video tag.