' <br /> 5 . Obtain and submit releases enabling Owner' s full and � <br /> unrestricted use of the work and access to services and <br /> utilities, including (where required) occupancy , <br /> permits, operating certificates, and similar releases . <br /> 6 . Deliver tools, spare parts, extra stocks of materials, <br /> and similar physical items to Owner. , <br /> 7 . Make final changeover of locks and transmit keys to <br /> Owner, and advise Owner' s personnel to changeover in ' <br /> security provisions . <br /> 8 . Complete start-up testing of systems, and instructions ' <br /> of Owner' s operating/maintenance personnel . <br /> Discontinue (or change over) and remove from project <br /> site temporary facilities and services, along with <br /> construction tools and facilities, mockups, and similar ' <br /> elements . <br /> 9 . The Contractor is responsible for making all punch ' <br /> lists and execution of same prior to his request for <br /> substantial completion. <br /> B. Inspection Procedures : Upon receipt of Contractor' s � <br /> request, Architect will either proceed with inspection or I <br /> advise Contractor of prerequisites not fulfi�led. � <br /> Following initial inspection, Architect will either ' <br /> prepare Certificate of Substantial Completion, or advise <br /> Contractor of work which must be performed prior to <br /> issuance of Certificate; and repeat inspection when ' <br />' requested and assured that work has been substant_ally <br /> completed. Results of completed inspection will form <br /> initial "punchlist" for final acceptance. <br /> 1 . 03 PREREQUISITES TO FINAL ACCEPTANCE , �� <br /> A. General : Prior to requesting Architect' s final inspection , <br /> for certification of final acceptance and final payment, <br /> as required by General Conditions, complete the following <br /> and list known exceptions (if any) in request : � <br /> 1 . Submit final payment request with final releases and <br /> supporting documentation not previously submitted and <br /> accepted. Include certificates of insurance for ' <br /> products and completed operations where required. <br /> 2 . Submit updated final statement, accounting for ' <br /> additional (final) changes to the Contract Sum. <br /> 3 . Submit certified copy of Architect' s final punchlist of , <br /> itemized work to be completed or corrected, stating <br /> that each item has been completed or otherwise resolved <br /> for acceptance, endorsed and dated by Architect . <br /> ' <br /> November 25 , 1998 01700-2 98088 . 00 ' <br />