My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (36)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:34:37 AM
Creation date
4/11/2017 10:31:18 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
ANGIO/HUMAN RESOURCE RENOVATIONS
Owner
EAST PASCO MEDICAL CENTER
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i , <br /> ` sheet information. Mark identification on both front and ' <br /> spine of each binder. <br /> C . The Contractor and his mechanical and electrical ' <br /> subcontractors will each keep one set of drawings in the <br /> job office and make a daily record of all changes in ' <br /> location of equipment, partitions, materials, etc . , as <br /> approved by Architect. At the conclusion of the job, the <br /> Owner will furnish sepias to the Contractor and the <br /> mechanical and electrical subcontractors who will ' <br /> , incorporate all changes on the sepias . This includes all <br /> Change Order sketches issued by the Architect during the <br /> progress of the Work. The revised sepias are to be turned ' <br /> over to the Owner at the conclusion of the project . <br /> PART 2 PRODUCTS ' <br /> NOT APPLICABLE <br /> ' <br /> PART 3 EXECUTION <br /> 3 . 01 CLOSEOUT PROCEDURES ' <br />' A. General Operating/Maintenance Instructions : Arrange for <br /> each installer of work requiring continuing maintenance t <br /> (by Owner) or operation, to meet with Owner' s personnel, <br /> at project site, to provide basic instruction needecl for <br /> proper operation and maintenance of entire work. Include � <br /> instructions by manufacturer' s representatives SNhere <br /> installers are not expert in the required procedures . <br /> Review maintenance manuals, record documentation, tools, ' <br /> spare parts and materials, lubricants, fuels, <br /> identification system, control sequences, hazards, <br /> cleaning and similar procedures and facilities . For <br /> operational equipment, demonstrate start-up, shutdown, ' <br /> emergency operations, noise and vibration adjustments, <br /> safety, economy/efficiency adjustments, and similar <br /> operations . Review maintenance and operations in relation ' <br /> with applicable warranties , agreements to maintain bonds <br /> and similar continuing commitments . <br /> 3 . 02 FINAL CLEANING ' <br /> A. General : Specific cleaning for specific units of work is <br /> specified in sections of Divisions 2 through 16 . General � <br /> cleaning during progress of work is specified in General <br /> Conditions : <br /> 1 . Provide final cleaning of the work, at time indicated, ' <br /> consisting of cleaning each surface or unit of work to <br /> normal "clean" condition expected for a first class <br /> building cleaning and maintenance program. Comply with , <br /> November 25 , 1998 01700-4 98088 . 00 ' <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.