My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (37)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (37)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:41:22 AM
Creation date
4/11/2017 10:41:05 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
ADMINSTRATION RENOVATIONS
Owner
EAST PASCO MEDICAL CENTER
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� �i <br /> ,� <br /> i <br /> � � <br /> SECTION 01010 -SUMMARY OF WORK <br /> � ! <br /> PART 1 -GENERAL <br /> ' ' <br /> 1�.1 WORK COVERED BY CONTRACT DOCUMENTS <br /> � <br /> ' ,! <br /> j A. Renovation of approximately 6936 square feet of the existing facility for a new administration <br /> � area. This will consist of the administration offices, boardroom, and kitchen with new <br /> � receptions area and waiting area. Also a new corridor will be added along with the relocation of <br /> � ; the telephone equipment. The project will also consist of an addition of a new vestibule of <br /> approximately 420 square feet to the existing main entry. <br /> ' 1.2 RELATED REQUIREMENTS <br /> i ' A. AIA A201 1987 Edition. <br /> , B. Supplementary Conditions to AIA A201, Section 00800. <br /> � I <br /> _ 1.3 OWNER FURNISHED/CONTRACTOR INSTALLED EQUIPMENT <br /> i <br /> ' E A. Equipment fumished by Owner to be installed by Contractor is listed in Owner <br /> , Furnished/Contractor Installed Equipment Brochure. <br /> � B. Owner's Responsibilities: <br /> � I <br /> � 1. Arrange for delivery of shop drawings, product data, samples, manufacturer's <br /> ' � instructions, and certificates to the Contractor. <br /> ` 2. Submit claims for transportation damage. <br /> 3. Inspect deliveries jointly with the Contractor. <br /> , 4. Arrange for replacement of damaged, defective, or missing rtems. <br /> 5. Arrange for manufacturer's field services. <br /> 6. Arrange for and deliver manufacturer's warranties and bonds to the Contractor. <br /> � C. , Contractor's Responsibilities: <br /> � 1. Review shop drawings, product data, samples and other submittals. The Contractor shall <br /> � I notify the Architect and engineers of any conflicts in vendor drawings and that of the <br /> IContract Documents before proceeding with installation. <br /> 2. Receive and unload products at the site. <br /> , 3. Inspect deliveries and record shortages, and damaged or defective items. <br /> I 4. Protect equipment from damage and from exposure to elements. <br /> j 5. Handle products at site including uncrating, inventory and storage of equipment. <br /> i6. Assemble, install, connect, adjust, and finish products. <br /> � 7. Provide installation inspections required by public authorities. <br /> , 8. Repair or replace items damaged by the Contractor or his operations. <br /> � <br /> � March 3,2000 01010-1 99048.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.