My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (37)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (37)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:41:22 AM
Creation date
4/11/2017 10:41:05 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
ADMINSTRATION RENOVATIONS
Owner
EAST PASCO MEDICAL CENTER
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> 1.4 FIXED EQUIPMENT LIST � <br /> A. FIXED EQUII'MENT LIST includes items to be: � <br /> 1. Owner specified, Owner furnished and Coniractor mstalled. <br /> 2. Owner specified, Owner furnished and Owner installed. <br /> 3. Architect specified,Contractor furnished,and Cantractar installed. � <br /> 4. Kitchen Equipment specified, furnished and installed. <br /> 1.5 WC?RK SEQUENCE � <br /> A. A scheduling sequence meeting shauld be held with the 4wner's representative prior' ta any � <br /> renovation work being done. Coordinate progress schedule with the Owner's representative. <br /> B. Construet work in stages to provide continuous public usage. L7o not close off public usage of � <br /> facilities until use of ane stage of work will provide alternate passage. <br /> 1.6 CONTRACTOR USE OF PREMI5ES � <br /> A. Caardinate use af the premzses under drrection of Architect. Contractor will submit plan ar <br /> discuss lacations on the site of storage areas, layout areas and offices wrth the Architect for � <br /> appraval. . <br /> B. Do nat unreasonably encumber site under this contract. � <br /> C. Da not load structure with weight that will endanger stzucture. <br /> D. Assume full responsibility far protection and safekeeping af products stored on premises. � <br /> E. Obtam and pay for additional starage and work areas if required for operations under this � <br /> contract. <br /> F. Keep site clean and building braom clean at aIl times. Vacuum passages between existing and <br /> new or renovated spaces on a daily basis and/or as the need occurs. � <br /> 1.7 OWNER OCCTJPANCY � <br /> A. Owner will occupy premises during entire construction period to conduct his operations. <br /> Cooperate with Owner in scheduling operations to rnmirnize canflict and to facilitate Qwner � <br /> usage. <br /> 1.8 PARTIAL OWNER OCCUPANCY � <br /> A. Schedule and substantially complete designated portians of work for C?wner's occupancy prior <br /> to Substantial Completion af the entire work. � <br /> B. Owner will occupy designated areas far the purpose of storage of furnishings and equipment <br /> and/or installatian of equipment. � <br /> March 3, 2000 01010-2 99048.00 � <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.