Laserfiche WebLink
' <br /> 1.5 COORDINATION OF SPACE , <br /> A. Coordinate use of project space and sequence of installation of inechanical and electrical work , <br /> which is indicated diagrammatically on the drawmgs. Follow routings indicated for pipes, ducts <br /> and conduits as closely as practicable, with due allowance for available physical space; make <br /> runs parallel with lines of building. Utilize space efficiently to maximize accessibility for other <br /> installations, for maintenance,and for repairs. ' <br /> B. In finished areas, except as otherwise indicated, conceal pipes, ducts and wiring� in the <br /> construction. Coordinate locations of fixtures and outlets with finish elements. ' <br /> 1.6 COORDINATION OF CONTRACT CLOSEOUT ' <br /> A. Coordinate completion and cleanup of work of separate sections in preparation for Substantial <br /> Completion of portions of the work designated for Owner occupancy designated in Section � I <br /> 01010. <br /> B. Coordinate completion and cleanup of work of separate sections in preparation for Sub'stantial <br /> Completion. , <br /> C. After Owner occupancy of the premises, coordinate access to site by various sections for � <br /> correction of defective work and work not in accordance with the Contract Documents, to <br />' minimize disruption of the Owner's activities. <br /> D. Assemble and coordinate closeout submittals specified m Section 01700. � <br /> PART 2 -PRODUCTS ' <br /> Not Used. <br /> PART 3 -EXECUTION <br /> ' <br /> Not Used. � , <br /> END OF SECTION 01040 , <br /> , <br /> ' <br /> ' I <br /> , <br />, March 3, 2000 01040-2 99048.00 ' <br /> l I <br />