Laserfiche WebLink
� ' <br /> 6. Alternatives to cutting and patching. ' <br /> 7. Designation of party responsible for cost of cutting and patching. <br /> C. Submit cost estimate for cutting and patching requested by Owner prior to starting work: � <br /> D. Should conditions of work or schedule require a change of materials or methods, submit written ' <br /> recommendations to Architect, including: <br /> 1. Conditions which cause requirement for change. <br /> 2. Recommendations for alternative materials or methods. � <br /> 3. Submittals as required for substitutions. <br /> 4. Cost estimate for changing materials and methods. <br /> E. Submit written notice to Architect designating time work will be uncovered for his observation. ' <br /> 1.4 RESPONSIBILITY FOR COSTS , <br /> A. Costs caused by ill-timed or defective work, and work not complying with requirements of ' <br /> contracts, including costs of additional services of the Architect or other consultants, shall be <br /> paid by the party responsible for ill-timed, defective, or noncomplying work as determined by <br />, the Architect. ', ; <br /> B. Cost of work done on instructions of Owner, other than defect:ve or noncomplymg work, will <br /> be paid by the Owner. <br /> , <br /> PART 2 -PRODUCTS <br /> � <br /> 2.1 MATERIAI_S <br /> A. Provide materials required for original construction. � <br /> B. For any change in materials, submit request for substitution as specified above. <br />� ' <br /> PART 3 -EXECUTION <br /> � <br /> 3.1 INSPECTION <br /> A. Inspect existing conditions includmg elements subject to movement or damage during: ' <br /> 1. Cutting and patching. <br /> 2. Excavating and backfilling. , <br /> B. After uncovenng work, inspect conditions affecting installation of new products. <br /> ' <br /> , ' <br /> March 3, 2000 01045-2 99048.00 , <br />