My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (38)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:46:50 AM
Creation date
4/11/2017 10:46:35 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
RADIOLOGY AND ELEVATOR RENOVATION
Owner
EAST PASCO MEDICAL CENTER
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 . Identifications of project. <br /> ' <br /> 2 . Description of affected work. , <br /> 3 . Necessity for cutting. <br /> 4 . Effect on other work, and on structural integrity of ' <br />' project. <br /> I 5 . Description of proposed work. Designate scope of : , <br /> a. Cutting and patching <br /> b. Trades required to perform work. ' <br /> c . Products proposed to be used. ' <br /> d. Extent of refinishing. <br /> 6 . Alternatives to cutting and patching. ' <br /> 7 . Designation of party responsible for cost of cutting <br /> and patching. ' <br /> C. Submit cost estimate for cutting and patching requested by <br /> Owner prior to starting work. � <br /> D. Should conditions of work, or schedule, require a change <br /> __, of materials or methods, submit written recommendations to ' <br /> Architect, including: <br /> 1 . Conditions which cause requirement for change. <br /> 2 . Recommendations for alternative materials or methods . , <br /> 3 . Submittals as required for substitutions . <br /> ' <br /> 4 . Cost estimate for changing materials and methods . <br /> E. Submit written notice to Architect designating time work ' <br /> will be uncovered for his observation. <br /> 1 . 04 RESPONSIBILITY FOR COSTS ' <br /> A. Costs caused by ill-timed or defective work, and wor}c not <br /> complying with requirements of contracts, including costs ' <br /> of additional services of the Architect or other <br /> consultants shall be paid by the party responsible for <br /> ' ill-timed, defective, or noncomplying work as determined <br /> by the Architect. ' <br /> B. Cost of work done on instructions of Owner, other than <br /> defective or noncomplying work will be paid by the Owner. , <br /> January 22 , 1999 01045-2 . 98105 . 01 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.