Laserfiche WebLink
, <br /> I I <br /> ' I � <br /> ' PART 2 PRODUCTS <br /> ' 2 . OI1 MATERIALS <br /> A. Provide materials required for original construction. <br /> ' ' <br /> B. For any change in materials, submit request for <br /> � , substitution as specified above. <br /> ' � I <br /> iPART 3 EXECUTION <br /> 1 ' I <br /> � 3 . 0,1 INSPECTION <br /> � � <br /> I A. Inspect existing conditions including elements subject to <br /> I movement or damage during: <br /> ' <br /> ; � 1 . Cutting and patching. <br /> ' B. After uncovering work, inspect conditions affecting <br /> � installation of new products . <br /> I <br /> ' 3 . 02 PREPAR.ATION <br /> ' A. Before cutting: <br /> 1 . Shore, brace, and support as necessary to maintain <br /> structural integrity. <br /> , _� I <br /> 2 . Protect other parts of project from damage. <br /> ' 3 . 03 PERFORMING WORK <br /> A. Fit and adjust materials to provide a finished and <br /> � � complete installation. <br /> � � B. Cut and remove materials, to ensure other work will not be <br /> � damaged, and new materials can be properly installed. <br /> , ; <br /> � ; �C. Restore work to ensure compliance with specifications . <br /> ' � D. Refinish surfaces to provide an even uniform appearance. <br /> I 1 . Continuous surfaces : Refinish to nearest intersections . <br /> , 2 . Assemblies : Refinish entire assemblies . <br /> � <br /> � - <br /> , I <br /> I END OF SECTION <br /> � <br /> ' � <br /> ' I . <br /> I Jaivary 22, 1999 01045-3 98165 . 01 <br /> i I <br />