Laserfiche WebLink
i � <br /> � ( � <br /> I � <br /> � � � , <br /> � f SECTION 01400 <br /> � ' I <br /> TESTS & INSPECTIONS <br /> � � PART 2 GENERAL <br /> � 1. 0i1 The Tes�ing Agenc� will be selected by the Architect. The <br /> � � Owner will pay for tests and anspections unl.ess otherwi�e <br /> ! � specified. <br /> • i i <br /> ( 1 . 0;2 The responsibility of the Testa.ng Agency shall be to tes�, <br /> ��, j � z.nspect and report. Work and materials not complying wi�h <br /> " i � these specifications and referenced codes, standards and <br /> � � ( specificatians shall be reported ta the Contractor and <br /> Architect immedia�.ely. Field notes confirming such <br /> ' � notification are to be submit�.ed with te�t anc3 inspection <br /> 1 I reports . Gopies af field no�.es are to be left with the <br /> '� � � proaect sup�rintendent priar �o leaving the construction <br /> , � site. Field nates shall anciu.de the message given to the <br /> Con�rac�.or, date and time of znessage, name of Contractor' s <br /> � ; Representative in£ormed, nature of discrepancy, action <br /> taken by Contractor, and narne of Te�ting Agency <br /> � � Representative. <br /> � ; 1 . 03 Tests and i.nspections of materials and pracesses will be <br /> required as set forth in the apprapriate �ections of the�e <br /> I f specificatians and as directed by the Archztec�. <br /> � �-_� � Labaratory and fiel.d p�rsonnel are ta be qualified with a <br /> minimum of �wo year� experience. <br /> � 1 . 04 Dispose of or correct ma�.erials and work n.ot complying <br /> with the specifications in. an approved manner. Should the <br /> contrac�or elect ta accept ma�.erial or wark not complying <br /> � � ta the �pecifications, he thereby a�sumes full <br /> responsibility for the material ox work and design, tes�G, <br /> inspection, and correc�.ive ac�.ion should the material nat <br /> canfarm to appropriate codes . <br /> � �.. 05 Whenever extra testing desi.gn andJor znspectians are <br /> ' n.ecessi�ated by the fault or error o� the Cantractar, ar <br /> � � � by �,he nancompl.iance o� the materials or warkmanship with <br /> � � the requirements of these plans an.d speci�ica�ionS, or for <br /> � f the conv'enience of the Con�.ractor, the Owner will pay far <br /> i � � �uch extra te�ts and inspec�ions but will deduct the <br /> � , ; amounts of such payments £rom paymen�s due ta the <br /> i Con�.rac�.or. Addztional work for the Archi�ect shall be <br /> � at the rate of 2 . 5 times direct personnel expense plus the <br /> � ( cost of direct e�ense. <br /> � � I <br /> � 2. 06 The reports shall indicate that the materials were �.ested <br /> � in accordance with the requirements of the Specificatiora.s <br /> � � and referenced codes, and �ha1.l state whe�her the material <br /> ; ar material� passed or failed ta pass thase requirementS . <br /> � i Janua 22, 1999 01400-1 98165 . 01 <br /> I � <br /> � i <br />