My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (38)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:46:50 AM
Creation date
4/11/2017 10:46:35 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
RADIOLOGY AND ELEVATOR RENOVATION
Owner
EAST PASCO MEDICAL CENTER
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ll <br /> �r <br /> The Architect or his representative (Testing and <br /> Inspection Agency) shall select the samples of mat?rials <br /> for testing. In no case shall the vendor be considered a �r <br /> representative of the Architect for this purpose. <br /> 1 . 07 Copies of test or inspection reports are to be issued ;'� <br /> within 48 hours of the test or inspection. The following <br /> information is to be included: <br /> Name and Address of Test Agency �� <br /> Date <br /> Project Name �� <br /> Project Location <br /> Project Contractor - <br /> Material Supplier <br /> Specified Strength �� <br /> Type of Material <br /> Time Sampled <br /> Name of Person Performing Tests ` <br /> Quantity Represented y <br /> Weather Conditions <br /> Results of Tests 1� <br /> Date Tested <br /> Location of Material Tested <br /> Remarks <br /> Distribution of Reports <br /> 1 . 08 Make the premises available to the Architect and to the <br /> �-_; Testing and Inspection Agency and shall cooperate with the � <br /> Testing Agency. <br /> 1 . 09 Notify the Testing Agency 24 hours prior to the required <br /> testing and inspection. � <br /> 1 .10 The Architect will make decisions or set guidelines for <br /> acceptance or rejection of materials based on test 1� <br /> results . <br /> 1 . 11 Advise the Architect immediately of improper testing <br /> procedures, unqualified personnel performing �.est, �, <br /> unnecessary testing or incorrect test results . <br /> 1 . 12 Neither the observations of the Architect in his � <br /> administration of the contract, nor inspections, tests or <br /> approvals by persons other than the Contractor shall <br /> relieve the Contractor from his obligations to perform the �' <br /> work in accordance with the Contract Documents . <br /> END OF SECTION � <br /> � <br /> January 22 , 1999 01400-2 98165 . 01 � I <br />
The URL can be used to link to this page
Your browser does not support the video tag.