My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (51)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (51)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 2:13:08 PM
Creation date
4/12/2017 2:06:39 PM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
OUTPATIENT SURGERY
Owner
EAST PASCO MEDICAL CENTER
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� the edge group, p.a. OIYNER p <br /> ARCHITECT D , <br /> I 444 BUNKER ROAD, WEST PALM BEACH CONTRACTOR ❑ <br /> � FLORIDA 33405-3694 EOJ/585-9307 <br /> I 4o-r FIELD ❑ � <br /> South Addition,OP/Surgery, Phase II <br /> C H A N G E O R D ER No. 1 Date: 5/15/95 ARCHITECTS PROJECT No. 9301 _07 <br /> Own�r: � T0: r � <br /> � East Pasco Medical Center � Poole Construction Co. , Inc. <br /> 7050 Gall Blvd. P.O. Box 952318 <br /> Zephyrhills, FL 33541-1399 I � Lake Mary; FL 32795-2318 � <br /> � .-1 <br /> You are directed to make the following changes in the above project: i <br /> i <br /> The cost quoted includes all labor and material (re: paragraph 4 of General Conditions) necessary to <br /> complete the work as indicated herein and in the construction documents where they apply. Conflicts <br /> w:ill. be gove-r-r�ed b}• t:his ('hange Orc'.�� foi this parr. of the work only. , <br /> The following changes are in response to AFiCA letter dated March 9, 1995. <br /> Drawing E-3 Provide circuit for P.H. Controller (Comment E-34) . <br /> Drawing E-12 Revise electrical panels as indicated on the revised drawing. (comment E- <br /> 35) <br /> Drawi.ng E-3 Add 3-pole breaker for pool floor hydraulic lifter to an equipment <br /> circuit, 1HE1. (Comment E-38) ' <br /> Draw ng 1�t-1 At the duct penetration in the 2-hour wall between Rooms G91 and G92, add <br /> a fire/smoke damper. (Comment AC-19) <br /> Drawing M-1 Add a 90$ efficiency filter in PAHU-1. Add motor for 2^ w.c. external _ <br /> & M-£3 3 HP.. (Comment AC-2 0) i <br /> Draw:�ng M;3 Add return•air grilles and ducts in closets 136A and 1368. (Comment Ac- <br /> I 21� ' <br /> Drawbng P�7 Change the lavatory in Toilet 134D from Fixtu're L-4 to a wall-hung type, <br /> Fixture L-2 (Comment P-6) i <br /> Drawing P�7, Add lavatory type L-2 in Hydrotherapy Room 135. (Comment P-7) <br /> P-9 & P-11 . <br /> i <br /> BY: � <br /> The original Project Cost was . . . . . . . . . . . . . . . � . . . . . $ <br /> i <br /> Net cfiange by previous Change Orders . . . . . . . . . . . .i . . . . . $ <br /> The Cost prior to this Change Order was . . . . . . . . . . ;. . . . . . $ <br /> The Cost will 'be (increased) (decreased) (unchanged) <br /> by this Change Order . . . . . . . . . . . . . . . . . . . . . . . $ <br /> The new Cost including this Change Order will be . . . . . . . . . . $ ' <br /> T e Edge Group, P.A. <br /> 444 Bunker Road <br /> W st P a a. 33405 <br /> B� � BY G- ��-�"� BY , /� <br /> D ITE �7�I� DAT� r ..� , DATE ����,�/``� <br /> � I <br />
The URL can be used to link to this page
Your browser does not support the video tag.