My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (53)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (53)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 2:37:28 PM
Creation date
4/12/2017 2:28:06 PM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
SOUTH ADDITION
Owner
EAST PASCO MEDICAL CENTER
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� l , <br /> ; <br /> , . <br /> � <br /> �, , <br /> � . <br /> � <br /> � , � <br /> I�age 3 � ' <br /> 9eptember 6, 1994 � , <br /> Mr. James R. Gregory <br /> i <br /> i <br /> i i <br /> Comment: A-13 Sheet A5-12: I <br /> I <br /> � � B. Detail 4: Show the 1-hour rated wa�l assembly and the <br /> i safing at the edge of the floor slabs. , <br /> i <br /> � ; The response to this comment generaled the following: <br /> � . <br /> A. The 1-hour rated separation sYiall ,be a listed <br /> assembly, provide the design number for the <br /> j ' walls above and below the glass, these shall be <br /> ; , 1-hour rated assemblies from floor-to-floor or , ' <br /> floor-to-roof deck, revise accordingly. <br /> I _ i <br /> I ; B. Provide safing at the edge ofithe second floor <br /> I slab, sealed against the passage of smoke at the ; <br /> top side, revise accordingly. � '', <br /> ;I � � � � <br /> Response: The 1-hour rated assembly has been revised and is listed <br /> ' assembly UL DES-U465. Safing has been added at the edge of <br /> the Second Floor slab to prohibit passage �of smoke into <br /> cavity of wall. See revised A5-12, Addendum #2, dated <br /> i ; 9/6/94. <br /> C�',omment: A-21 Sheet Al-5: <br /> i , <br /> I� A. Provide an exit light at the north end of Waiting <br /> � � 160C. Visible from Waiting 160C and 161. - i ; <br /> ,I � � ; <br /> Response: The exit sign has been added. See revised drawing E-24, � <br /> il Addendum #2, dated 9/6/94. I i, <br /> New Comment A-22 Sheet A4-40: Section 1 shows a return air plenum above a 1- 1'� <br /> � hour ceiling of drywall on metal suspension, provide a � <br /> I design number for this assembly and coordinate with <br /> Mechanical Sheet M-18. <br /> � � <br /> Response: � This air plenum has been eliminated. The �smoke evacuation ! ' <br /> , j system is now ducted. See revised drawings A4-40, A4-42, ' <br /> � and M-18, Addendum #2, dated 9/6/94. I � ' <br /> � � � � <br /> , ! � <br /> � <br /> � � <br /> I � ii <br /> I <br /> I <br /> i <br /> - i <br /> I i <br /> � <br /> i <br /> ; , i <br /> I i , �� <br /> I ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.