My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (53)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (53)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 2:37:28 PM
Creation date
4/12/2017 2:28:06 PM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Description
SOUTH ADDITION
Owner
EAST PASCO MEDICAL CENTER
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f ' <br /> •t - -: <br /> � the edge group, p.a. <br /> 444 BUNKF1t.ROAO WEST PA1JA BfJ1CH � � <br /> fLORIDA 33405-36B4 407/585-8307 , <br /> I i <br /> EA3T PASCO (MEDICAL CENTER ; I <br /> SOUTH ADDITION-PHA3E IV: ATRIUM I,OBBY � � <br /> AIHCA LOG #H-425-5 <br /> i i , <br /> ADDENDUM No. 2 - September 6, 1994 <br /> Issued to Poole Construction Company. <br /> ; I <br /> I � <br /> The intentiand purpose of this Revision is to augment or modify the Contract <br /> Documents (Project Manual and/or Drawings) . This Revision shall supersede <br /> conflicting requirements of the Contzact Documents. Mechanical and Electrical <br /> drawings by Peninsula Engineering are attached. All are signed and sealed. <br /> This Addenda and documents are the responses to AHCA comments of July 13, <br /> 1994. <br /> A�. DRAWING REVI3ION <br /> � Architectural � <br /> � <br /> i <br /> 1. �' A2-12 Revised Third Floor Reflected Ceiling Plan, Fourth Floor <br /> Plan, Fourth Floor Reflected Ceiling Plan. <br /> 2. A4-40 Revised building section. <br /> 3. � A4-41 Revised, existing window replacement requirements. <br /> 4. A4-42 Revised building section/revised window requirement. <br /> 5. A5-12 Revised wall section. <br /> 6. A6-4 Revised window details. <br /> 7. ETO Gas Sterilizer renovations (this is a separate issue, <br /> submitted at part of the Atrium project as recommended and <br /> permitted by AHCA. ) - <br /> I � <br /> B. 3UPPLEMENTAL DRAWING3 <br /> I . <br /> � Architectural j <br /> 1. SD-2 Relocate door at Vestibules (refer to A1-5�, A2-8 and A4-23) . <br /> , 2. SD-5 Building Section/Mechanical 402�. _ <br /> 3. SD-6 Building Section/Mechanical 402. <br /> 4. SD-11 East Elevation/Elevator relief louver (refer to A3-16) . <br /> 5. � SD-16 Detail of rated duct enclosure-Third Floor (refer to A2-12. ) <br /> I C. PROJECT MANUAL I <br /> Architectural <br />� ' I <br /> , � � , <br /> 1. D5-26 Added Door 401A in 1-hour rated wall� - Fourth Floor. � � <br /> 2. � RFS-25 Revised room name to Future Corridor' (401) . <br /> � , ; <br /> ' , � , <br /> I � <br />
The URL can be used to link to this page
Your browser does not support the video tag.