My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 GALL BLVD (61)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 GALL BLVD (61)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 11:42:11 AM
Creation date
4/18/2017 11:39:24 AM
Metadata
Fields
Template:
Building Plans
Street #
7050 GALL BLVD
Location
GALL BLVD
Contractor
POOLE CONSTRUCTION
Description
ADDENDUM #1 ER ADDITION
Owner
EAST PASCO MEDICAL CENTER
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ---_� _ .�_ ________ _ � ��_____e...� <br /> 1 <br /> i <br /> � �' � <br /> { <br /> Pho�nix De�ign Group Project Addendum No. 1 � <br /> 104 Woodmont Blvd Suite 218 <br /> Nashville, TN s�2os September 15, �1999 <br /> 615-386-9287 vo`i�ce 615-385-0922 fax <br /> i <br /> Project: EastlPasco Medical Center ER Renovation To: Jim Breslin <br /> Location Zephyrhills, FL From: Jon Long <br /> Subject: Addendum No. 1 Project 98027.06 <br /> Addendum No. 1 <br /> East Pasco Medical Center <br /> ER Renova�ion and Addition <br /> Zephyhills, FL <br /> ESA Project No. 98033.00 <br /> PDG Project No. 98027.06 <br /> This Addendum forms an integral part of the Contract Documents and modifies the original Documents <br /> dated August 25, 1999 as outlined here in addition to being shown on the drawings as Delta 1, dated <br /> September 5, 1999. <br /> CHANGES TO THE DRAWINGS <br /> Sheet E0.02—Electrical Site and Powerhouse Plan: <br /> 1. Add �els ECB and E B to electrical owerhouse lan as shown on attached sketch ESK-1 dated <br /> P ,� Q P P � <br /> Septem er 15, 1999. <br /> Sheet E1.0 —Lighting First Floor Plan: <br /> 1. Revise 'ghting layout in admitting area as shown on attached sketch ESK-2, dated September 15, <br /> 1999. <br /> Sheet E2.0 i —Power and Systems First Floor Plan: <br /> 1. Revise power and systems layout in admitting area as shown on attached sketch ESK-3, dated <br /> September 15, 1999. <br /> Sheet E6.0 —Electrical One Line Diagram: <br /> 1. Revise one line diagram to include panels ECB and EQB and correct wire and breaker size on <br /> genera��r as shown on attached sketches ESK-4 and ESK-5, dated September 15, 1999. <br /> Addendum 'o. 1 Page-1 Phoenix Design Group, Inc. <br /> � 104 Woodmont Blvd•Suite 218•Nashville,TN 37205•(615)386-9287 <br /> i � <br />
The URL can be used to link to this page
Your browser does not support the video tag.